
Ivanhoe Electric Receives Indication for up to $825 Million in Financing from Export-Import Bank of the United States for Santa Cruz Copper Project
Santa Cruz Copper Project Preliminary Feasibility Study on Track for June Completion
Project Permitting, Financing, and Detailed Engineering Rapidly Advancing Towards Construction
Phoenix, Arizona--(Newsfile Corp. - April 15, 2025) - Ivanhoe Electric Inc. (NYSE American: IE) (TSX: IE) ("Ivanhoe Electric") Executive Chairman Robert Friedland and President and Chief Executive Officer Taylor Melvin are pleased to announce the receipt of a Letter of Interest from the Export-Import Bank of the United States ("EXIM Bank") outlining the potential to provide up to $825 million in debt financing with a 15 year repayment tenor for the development of Ivanhoe Electric's Santa Cruz Copper Project in Arizona through EXIM Bank's Make More in America initiative.
EXIM Bank is the official export credit agency of the United States. It is a government agency that offers financial support to companies through means such as direct loans and loan guarantees, working capital guarantees, and export credit insurance. EXIM Bank's Make More in America initiative and its China and Transformational Exports Program are designed to boost United States' competitiveness, strengthen supply chains, and reduce strategic vulnerabilities.
The Santa Cruz Copper Project aligns with the EXIM Bank's Make More in America initiative, which is intended to increase the United States' supply of critical minerals to foster economic growth and strengthen national security through domestic resource production.
Mr. Friedland commented: "Receipt of the Export-Import Bank of the United States' Letter of Interest underscores the importance of our Santa Cruz Copper Project to grow domestic copper production. The United States urgently needs more domestically produced copper to support the rapid expansion and rebuilding of its electric transmission and transportation infrastructure, national defense capabilities, and technologies of the future. Santa Cruz is positioned perfectly to be a source of pure copper cathode to help the United States achieve its strategic mission of greater self-reliance on domestic production of critical metals."
Mr. Melvin commented: "We are grateful for this strong show of support by the Export-Import Bank of the United States for the development of our Santa Cruz Copper Project. The people of the EXIM Bank have devoted significant time to learning about our project and are committed to supporting the growth of US critical metals production. We look forward to working together with the EXIM Bank to advance this significant financing opportunity as we rapidly progress our final engineering and permitting efforts at Santa Cruz towards initial construction in 2026. As an advanced-stage copper project on private land in the United States, 100%-owned by a United States company and with the ability to produce pure copper cathode on-site, our Santa Cruz Copper Project is uniquely positioned to meet rising US demand for domestically sourced copper."
Ivanhoe Electric continues to pursue additional government support programs, including the EXIM Bank's Supply Chain Resilience Initiative and the Section 45X advanced manufacturing production tax credit. The Supply Chain Resilience Initiative provides financing tools to strengthen and diversify U.S. access to critical mineral supply chains, while Section 45X offers direct tax incentives for the domestic production and processing of those minerals.
Ivanhoe Electric is assessing EXIM Bank's interest together with other financing alternatives available to it for the development of the Santa Cruz Copper Project. In the event Ivanhoe Electric proceeds with a formal application, EXIM Bank will need to conduct all requisite due diligence necessary to determine if a final lending commitment would be made. Any final lending commitment will be dependent on meeting EXIM Bank's underwriting criteria, authorization process, and finalization and satisfaction of terms and conditions. All final lending commitments must be in compliance with EXIM Bank policies as well as program, legal and eligibility requirements.
Santa Cruz Copper Project Advancing Rapidly Toward Construction, Poised to Strengthen U.S. Copper Supply Chain Independence
The team at Santa Cruz, which includes Fluor Inc. as project lead, remains on schedule to deliver the Santa Cruz Copper Project Preliminary Feasibility Study in June 2025. The Preliminary Feasibility Study will support project financing activities. Permitting and detailed engineering work are being aggressively advanced throughout 2025. Ivanhoe Electric anticipates that permits will be received and initial construction activities will begin in the first half of 2026.
About Ivanhoe Electric
We are a U.S. company that combines advanced mineral exploration technologies with electric metals exploration projects predominantly located in the United States. We use our accurate and powerful Typhoon™ geophysical surveying system, together with advanced data analytics provided by our subsidiary, Computational Geosciences Inc., to accelerate and de-risk the mineral exploration process as we seek to discover new deposits of critical metals that may otherwise be undetectable by traditional exploration technologies.
We believe the United States is significantly underexplored and has the potential to yield major new discoveries of critical metals. Our mineral exploration efforts focus on copper as well as other metals including nickel, vanadium, cobalt, platinum group elements, gold and silver. Through the advancement of our portfolio of electric metals exploration projects, headlined by the Santa Cruz Copper Project in Arizona and the Tintic Copper-Gold Project in Utah, as well as other exploration projects in the United States, we intend to support United States supply chain independence by finding and delivering the critical metals necessary for the electrification of the economy. We also operate a 50/50 joint venture with Saudi Arabian Mining Company Ma'aden to explore for minerals on ~48,500 km 2 of underexplored Arabian Shield in the Kingdom of Saudi Arabia. In 2024, we also launched an Exploration Alliance with BHP, the world's largest mining company, to explore for new critical metal deposits across six target areas in the Southwest United States.
Website: www.ivanhoeelectric.com
Follow us on Twitter
Ivanhoe Electric's Executive Chairman Robert Friedland: @robert_ivanhoe
Ivanhoe Electric: @ivanhoeelectric
Ivanhoe Electric's investor relations website located at www.ivanhoeelectric.com should be considered Ivanhoe Electric's recognized distribution channel for purposes of the Securities and Exchange Commission's Regulation FD.
Forward-Looking Statements
Certain statements in this news release constitute "forward-looking statements" or "forward-looking information" within the meaning of applicable U.S. and Canadian securities laws. Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of Ivanhoe Electric, its projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such statements can be identified by the use of words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate", "scheduled", "forecast", "predict" and other similar terminology, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. These statements reflect Ivanhoe Electric's current expectations regarding future events, performance and results and speak only as of the date of this news release.
Such statements in this news release include, without limitation statements regarding the Letter of Interest from the Export-Import Bank of the United States ("EXIM Bank") and the potential for EXIM Bank to provide up to $825 million in financing for the development of Ivanhoe Electric's Santa Cruz Copper Project; the advancement of Project financing discussions with EXIM Bank; the submission of an application by Ivanhoe Electric to EXIM Bank for the final financing commitment and the satisfaction of EXIM's underwriting criteria, authorization process, and any terms and conditions; the potential for financing through other programs, including Supply Chain Resilience Initiative and Section 45X; the completion of the Preliminary Feasibility Study for the Santa Cruz Project in June 2025; the progress of engineering and permitting for the Santa Cruz Project and the commencement of construction activities at the Santa Cruz Project in the first half of 2026; the development of the Santa Cruz Project into a mine and its ability to produce pure copper cathode; the projections, assumptions and estimates contained in the Initial Assessment related to the Santa Cruz Project, including, without limitation, those relating to production; and planned or potential developments in the businesses of Ivanhoe Electric.
Forward-Looking statements are based on management's beliefs and assumptions and on information currently available to management. Such statements are subject to significant risks and uncertainties, and actual results may differ materially from those expressed or implied in the forward-looking statements due to various factors, including the refusal or inability of EXIM Bank to ultimately provide financing; the inability to negotiate and sign definitive agreements for financing by EXIM Bank or the inability for us to satisfy conditions to financing;; changes in the prices of copper or other metals Ivanhoe Electric is exploring for; the results of exploration and drilling activities and/or the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations; the final assessment of exploration results and information that is preliminary; the significant risk and hazards associated with any future mining operations, extensive regulation by the U.S. government as well as local governments; changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with Ivanhoe Electric to perform as agreed; and the impact of political, economic and other uncertainties associated with operating in foreign countries, and the impact of the COVID-19 pandemic and the global economy. These factors should not be construed as exhaustive and should be read in conjunction with the other cautionary statements and risk factors described in Ivanhoe Electric's Annual Report on Form 10-K and other filings with the U.S. Securities and Exchange Commission at www.sec.gov.
No assurance can be given that such future results will be achieved. Forward-Looking statements speak only as of the date of this news release. Ivanhoe Electric cautions you not to place undue reliance on these forward-looking statements. Subject to applicable securities laws, Ivanhoe Electric does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this news release, and Ivanhoe Electric expressly disclaims any requirement to do so.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Cision Canada
34 minutes ago
- Cision Canada
Arizona Metals Files Technical Report for the Kay Mine Project
/NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES/ TORONTO, Aug. 14, 2025 /CNW/ - Arizona Metals Corp. (TSX: AMC) (OTCQX:AZMCF) (the " Company" or " Arizona Metals") is pleased to announce that, further to its news release dated June 30, 2025, the Company has filed the independent technical report supporting the first ever mineral resource estimate in respect of the Company's Kay Mine Project. The technical report, titled " Technical Report On The Mineral Resource Estimate for the Kay Deposit Cu-Au-Zn-Pb-Ag Project, Yavapai County Arizona, USA", has been filed on SEDAR+ in accordance with National 43-101 – Standards of Disclosure for Mineral Projects (" NI 43-101"). The technical report is dated August 14, 2025, with an effective date of June 17, 2025, and was authored by Allan Armitage, PhD, P. Geo., and Ben Eggers, MAIF, P. Geo., of SGS Geological Services (" SGS") and Shaohai (Sam) Yu, P. Met of SGS Bateman (" SGS"), each of whom is a independent Qualified Person as defined in NI 43-101. A copy of the technical report is available under the Company's profile on SEDAR+ at About Arizona Metals Corp Arizona Metals Corp owns 100% of the Kay Mine Project in Yavapai County, which is located on 1669 acres of patented and BLM mining claims and 193 acres of private land that are not subject to any royalties. The Kay Mine Project is a steeply dipping VMS deposit that has been defined from a depth of 60 m to at least 900 m. It is open for expansion on strike and at depth. The Company also owns 100% of the Sugarloaf Peak Project, in La Paz County, which is located on 4,400 acres of BLM claims. The Sugarloaf Peak Project is a heap-leach, open-pit target and has a historic estimate of "100 million tons containing 1.5 million ounces gold" at a grade of 0.5 g/t (Dausinger, N.E., 1983, Phase 1 Drill Program and Evaluation of Gold-Silver Potential, Sugarloaf Peak Project, Quartzsite, Arizona: Report for Westworld Inc.) The historic estimate at the Sugarloaf Peak Project was reported by Westworld Resources in 1983. The historic estimate has not been verified as a current mineral resource. None of the key assumptions, parameters, and methods used to prepare the historic estimate were reported, and no resource categories were used. Significant data compilation, re-drilling and data verification may be required by a Qualified Person before the historic estimate can be verified and upgraded to a current mineral resource. A Qualified Person has not done sufficient work to classify it as a current mineral resource, and Arizona Metals is not treating the historic estimate as a current mineral resource. Disclaimer This press release contains statements that constitute "forward-looking information" (collectively, "forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements contained in this press release include, without limitation, statements regarding the expansion potential of the Kay Project, statements regarding drill results and future drilling at the main Kay Project, and at additional targets including the North, North-Central and Western Targets at the Kay Project, and expansion drilling targets on the Kay Project, , statements regarding drilling and other exploration activity on the Sugarloaf Peak Gold Project, statements regarding completion of a PEA in H2 2025 or at all, statements regarding execution of the Company's plans for 2025 and the achievement of targeted milestones. In making the forward- looking statements contained in this press release, the Company has made certain assumptions. Although the Company believes that the expectations reflected in forward-looking statements are reasonable, it can give no assurance that the expectations of any forward-looking statements will prove to be correct. Known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to: availability of the Company to stay well funded; delay or failure to receive required permits or regulatory approvals; and general business, economic, competitive, political and social uncertainties. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this press release. Except as required by law, the Company disclaims any intention and assumes no obligation to update or revise any forward-looking statements to reflect actual results, whether as a result of new information, future events, changes in assumptions, changes in factors affecting such forward- looking statements or otherwise. SOURCE Arizona Metals Corp.


Cision Canada
34 minutes ago
- Cision Canada
Exro Technologies Reports Second Quarter 2025 Results
CALGARY, AB, Aug. 14, 2025 /CNW/ - Exro Technologies Inc. (TSX: EXRO) ("Exro" or the "Company"), a leading technology company specializing in power control solutions for electric vehicles and energy storage, today announced its financial results for the second quarter ended June 30, 2025. Q2 2025 Highlights Revenue of $2.9 million from the delivery of 18 electric propulsion units and aftersales services. Completed strategic wind-down of Asia-Pacific operations, retaining intellectual property and key subsidiaries. To date, accessed US$10.0 million of the up to US$30.0 million debt facility from an existing lender. Financial Results Revenue for Q2 2025 was $2.9 million, compared to $4.7 million in Q2 2024, reflecting reduced unit volumes in response to slower EV adoption rates. Gross margin per unit improved versus the prior year, excluding inventory provisions. Net loss from continuing operations was $81.7 million, which includes significant non-cash adjustments associated with the Company's strategic focus. These adjustments include: A $48.5 million impairment of intangible assets — primarily developed technology, brand, and customer relationships — reflecting the wind-down of APAC operations, and updated production forecasts. An $11.1 million inventory provision, also non-cash, related to the identification of excess and obsolete inventory. This provision aligns inventory values with near-term forecasted production and a leaner capital-efficient operating model. Update on Strategic Process The Company confirms that the strategic review process described in its May 16, 2025 press release remains ongoing. The Company is in active negotiations with credible strategic partners, and continues to draw on its US$30 million interim finance facility as appropriate. The Company will provide further updates in due course, but cautions that there can be no assurance that any transaction will be consummated. ABOUT EXRO TECHNOLOGIES INC. Exro Technologies Inc., now expanded through the strategic acquisition of SEA Electric, is a leading technology company that has developed new-generation power control electronics. Its innovative suite of solutions, including Coil Driver™, Cell Driver™, and SEA-Drive®, expand the capabilities of electric motors and batteries and offer OEMs a comprehensive e-propulsion solution with unmatched performance and efficiency. Exro is reshaping global energy consumption, accelerating adoption towards a circular electrified economy by delivering more with less – minimum energy for maximum results. For more information visit our website at To view our Corporate Presentation visit us at Visit us on social media @exrotech. CAUTIONARY STATEMENT REGARDING FORWARD LOOKING STATEMENTS This news release contains forward-looking statements and forward-looking information (together, "forward-looking statements") within the meaning of applicable securities laws. All statements, other than statements of historical facts, are forward-looking statements. Generally, forward-looking statements can be identified using terminology such as "plans", "expects", "estimates", "intends", "anticipates", "believes" or variations of such words, or statements that certain actions, events or results "may", "could", "would", "might", "will be taken", "occur" or "be achieved". Forward looking statements involve risks, uncertainties and other factors disclosed under the heading "Risk Factors" and elsewhere in the Company's filings with Canadian securities regulators, that could cause actual results, performance, prospects, and opportunities to differ materially from those expressed or implied by such forward-looking statements. Although the Company believes that the assumptions and factors used in preparing these forward-looking statements are reasonable based upon the information currently available to management as of the date hereof, actual results and developments may differ materially from those contemplated by these statements. Readers are therefore cautioned not to place undue reliance on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed times frames or at all. Except where required by applicable law, the Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise. This information is qualified in its entirety by cautionary statements and risk factor disclosure contained in filings made by the Company with the Canadian securities regulators, including the Company's annual information form for the financial year ended December 31, 2024, and financial statements and related MD&A for the financial year ended December 31, 2024, filed with the securities regulatory authorities in certain provinces of Canada and available at Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking information prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties, and factors that could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated, or intended. The Company does not intend, and does not assume any obligation, to update this forward-looking information except as otherwise required by applicable law. Neither the Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this press release.


Toronto Star
2 hours ago
- Toronto Star
Skeena Gold & Silver Reports Q2 2025 Financial Results
VANCOUVER, British Columbia, Aug. 14, 2025 (GLOBE NEWSWIRE) — Skeena Resources Limited (TSX: SKE, NYSE: SKE) ('Skeena Gold & Silver', 'Skeena' or the 'Company') reports interim financial results for the quarter ended June 30, 2025. The interim financial statements and management's discussion and analysis ('MD&A') are available on Skeena's website and have been posted under the Company's profile on SEDAR+ at and EDGAR at