
After India, now Afghanistan plans to build dams to cut water flow to Pakistan, claims Baloch activist
Afghanistan
is reportedly preparing to build new dams to restrict the flow of its river waters into Pakistan, according to a claim made by a Baloch activist on social media. The move follows India's long-standing dam projects on rivers flowing towards Pakistan.
A statement posted by Baloch writer Mir Yab Baloch on social media platform X said, 'This is the beginning of the end of NaPakistan. After Bharat, now Afghanistan is preparing building dams to cut the flow of its water to NaPakistan.'
The claim, though not officially confirmed by either Afghanistan or Pakistan, has started drawing attention amid growing tensions in the region over water resources.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Health: This unbreakable military watch is making seniors happy this year
Indestructible Smartwatch
Undo
Taliban general visits Kunar, backs dam plans, claims Mir Yab
According to the post, a senior Taliban army official, General Mubin, visited the Kunar region in eastern Afghanistan where he inspected a potential dam site. He reportedly called on the Kabul government to fund and construct multiple dams to retain the water flowing into Pakistan.
— miryar_baloch (@miryar_baloch)
General Mubin was quoted as saying, 'This water is our blood and we can't allow our blood to flow out of veins, we have to stop our water which can help to overcome our electricity needs and we can make our agriculture more robust.'
Live Events
You Might Also Like:
'Republic of Balochistan announced' trends on social media as Baloch leaders declare independence from Pakistan
Kunar River, a tributary of the Kabul River, flows from Afghanistan into Pakistan and is considered a key water source for downstream agricultural regions.
Water disputes in the region
Water-sharing has long been a sensitive issue in South Asia. India and Pakistan have a formal water treaty — the
Indus Waters Treaty
— in place since 1960, but there is no such agreement between Afghanistan and Pakistan.
Any move by Afghanistan to regulate water flow unilaterally could raise concerns in Pakistan, especially in light of recent statements from regional political voices and activists. Pakistan has not yet responded officially to the claim.
This development comes as both India and Afghanistan appear to be reworking their approaches to water diplomacy with Pakistan. While India has built several dams on western rivers under the Indus Treaty framework, Afghanistan controls the headwaters of several eastern tributaries flowing into Pakistan.
You Might Also Like:
'Not Pakistan's people': Why Balochistan is turning to India amid a firestorm
No official word from Kabul or Islamabad
So far, there has been no confirmation from the Taliban government or the Pakistani authorities regarding the reported dam inspection or any new construction plans.
The claim, however, adds to the ongoing debate about transboundary water rights and the emerging role of regional geopolitics in controlling natural resources.
India's shift on Indus Waters Treaty
India has taken a more assertive position on the Indus Waters Treaty in recent years, especially after repeated cross-border tensions and terror attacks linked to Pakistan-based groups. While India has not formally suspended the treaty, India has put the treaty in abeyance. India has started using more of its share of the water that was earlier allowed to flow into Pakistan unutilised. Projects like the Kishanganga and Ratle hydroelectric plants are now central to this strategy. These projects allow India to store and divert water for electricity generation and irrigation before it enters Pakistan.
The Indian government has consistently maintained that all its projects are in compliance with the treaty, but the cumulative effect has been a reduction in the volume of water reaching Pakistani territory during certain periods.
You Might Also Like:
Who is Kashish Chaudhary, the first Hindu woman to rise to the rank of Assistant Commissioner in Balochistan?
This change in water flow pattern has raised concerns in Pakistan, where agriculture remains heavily dependent on the Indus river system. Analysts have pointed out that any further reduction could add stress to Pakistan's water management systems.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
22 minutes ago
- Time of India
108 Covid cases reported in 24 hrs, 461 active in Gujarat
Ahmedabad/Surat: In the 24 hours ending at 5 pm on Tuesday, the state reported 108 new Covid cases, taking the total number of active cases to 461, according to a bulletin issued by the state health department. The data indicated that out of the total active cases, 20 were hospitalised, while the remaining 441 were in home isolation. In the same period, 43 patients were discharged, and one patient succumbed to the infection, as per the bulletin. An analysis of the Covid case details from Ahmedabad city indicated that about 10-15% of the total cases are below five years of age. At least five patients were below one year in major hospitals, according to the data. "Moreover, the majority of the patients are recorded in the below 60 years or working population this wave. In comparison, the earlier waves had patients in senior citizen age categories," said a health department official. Two deaths recorded in the city were also reported in relatively younger ages — 18 and 47 years. Both were women and had comorbidities, added officials. However, a more detailed analysis of the cases may point to possible reasons for the deaths, said officials. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Mistura chinesa faz cabelo crescer e homem fica irreconhecível Resultados em 30 dias Undo "Across India, five deaths have been reported in the past 24 hours, and the reasons, as mentioned by the MoHFW website, point towards respiratory illnesses along with diabetes, hypertension, heart, and kidney diseases. The deaths recorded on the website have only one person below 50 years. Thus, the trend in Gujarat is slightly different from the one observed across India," said a city-based physician, adding that there is no need for concern, but for caution. "If the flu-like symptoms persist for more than two days, medical help should be availed." Three more persons were diagnosed with Covid in Surat Municipal Corporation (SMC) limits, which include two women aged 64 and 19 years, while the third was a 38-year-old man. The first case pertains to a 64-year-old woman from the Adajan area of Surat, who is a homemaker. She returned from Dehradun on May 29 and is currently stable in home isolation. She has a history of high blood pressure. The second case is related to a 19-year-old woman, residing in Sachin, who is a nursing student. She is currently in home isolation, and her condition is stable. A 38-year-old man, residing in Umra village, who works as a labourer, was also diagnosed with Covid infection. He is also in home isolation. Samples from these patients have been sent to GBRC, Gandhinagar, for genome sequencing as per govt guidelines. Covid positive patients in home isolation have been advised to remain isolated for five days.


Time of India
28 minutes ago
- Time of India
Massajog sarpanch case: Court schedules June 17 for hearing on Valmik Karad's plea challenging invoking of MCOCA against him
Chhatrapati Sambhajinagar: The special MCOCA court in Beed district has scheduled June 17 for deciding on the plea of Valmik Karad, the key accused in the murder of sarpanch Santosh Deshmukh, challenging the invoking of sections of Maharashtra Control of Organised Crime Act (MCOCA) against him. After attending the hearing on Tuesday morning, special public prosecutor Ujjwal Nikam , who is representing the state in this case, said, "Valmik Karad's lawyers have moved an application challenging the applicability of MCOCA against him. The court has scheduled June 17 as the next date for hearing the arguments on this application. Also, on behalf of the state, we moved an application for confiscating all the movable and immovable assets belonging to Valmik Karad. The lawyers representing him have submitted replies regarding our application before the court today. The argument on our application, too, will be taken up on the next date of hearing." Nikam urged the court to frame charges in the case, stating that there was sufficient evidence against the accused. One of the key issues under consideration is whether the stringent Maharashtra Control of Organised Crime Act (MCOCA) can be applied to prime accused Karad. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 5 Books Warren Buffett Wants You to Read In 2025 Blinkist: Warren Buffett's Reading List Undo The court is expected to deliver its decision on the applicability of MCOCA on June 17 after hearing arguments from both prosecution and defence. In a parallel development, the prosecution has moved an application seeking seizure of Karad's movable and immovable properties. Karad's lawyers submitted their response on the matter, which has been scheduled for hearing on June 17. Karad filed a discharge application seeking exemption from charges under MCOCA. His defence team requested the court to prioritise the hearing on the application. The prosecution did not oppose the request, and the court listed the matter for hearing on June 17. Nikam confirmed that Karad is the only accused who filed such a discharge plea. Defence lawyers Vikas Khade and Mohan Yadav told newsprsons after the hearing that the prosecution was yet to share the digital evidence with them. The prosecution, however, informed the court that the electronic evidence would be submitted in a sealed format, after which discussions could be held. While the hearing on the discharge plea was expected on Tuesday, it did not take place. Instead, arguments were heard on several procedural and ancillary applications. The court observed that before addressing the discharge plea, other pending applications should be disposed of. Khade noted that the hearing lasted for nearly 50 minutes. He added that the prosecution has filed applications related to property seizure, and the court has scheduled a consolidated hearing on all pending matters, including the discharge plea and digital evidence, for June 17. Chhatrapati Sambhajinagar: The special MCOCA court in Beed district has scheduled June 17 for deciding on the plea of Valmik Karad, the key accused in the murder of sarpanch Santosh Deshmukh, challenging the invoking of sections of Maharashtra Control of Organised Crime Act (MCOCA) against him. After attending the hearing on Tuesday morning, special public prosecutor Ujjwal Nikam, who is representing the state in this case, said, "Valmik Karad's lawyers have moved an application challenging the applicability of MCOCA against him. The court has scheduled June 17 as the next date for hearing the arguments on this application. Also, on behalf of the state, we moved an application for confiscating all the movable and immovable assets belonging to Valmik Karad. The lawyers representing him have submitted replies regarding our application before the court today. The argument on our application, too, will be taken up on the next date of hearing." Nikam urged the court to frame charges in the case, stating that there was sufficient evidence against the accused. One of the key issues under consideration is whether the stringent Maharashtra Control of Organised Crime Act (MCOCA) can be applied to prime accused Karad. The court is expected to deliver its decision on the applicability of MCOCA on June 17 after hearing arguments from both prosecution and defence. In a parallel development, the prosecution has moved an application seeking seizure of Karad's movable and immovable properties. Karad's lawyers submitted their response on the matter, which has been scheduled for hearing on June 17. Karad filed a discharge application seeking exemption from charges under MCOCA. His defence team requested the court to prioritise the hearing on the application. The prosecution did not oppose the request, and the court listed the matter for hearing on June 17. Nikam confirmed that Karad is the only accused who filed such a discharge plea. Defence lawyers Vikas Khade and Mohan Yadav told newsprsons after the hearing that the prosecution was yet to share the digital evidence with them. The prosecution, however, informed the court that the electronic evidence would be submitted in a sealed format, after which discussions could be held. While the hearing on the discharge plea was expected on Tuesday, it did not take place. Instead, arguments were heard on several procedural and ancillary applications. The court observed that before addressing the discharge plea, other pending applications should be disposed of. Khade noted that the hearing lasted for nearly 50 minutes. He added that the prosecution has filed applications related to property seizure, and the court has scheduled a consolidated hearing on all pending matters, including the discharge plea and digital evidence, for June 17.


Time of India
28 minutes ago
- Time of India
Gadkari conferred with honorary doctorate in Doon, assures support to tackle traffic snarls
Dehradun: Union minister for road transport and highways Nitin Gadkari was conferred with an honorary doctorate during the 12th convocation ceremony of Graphic Era (deemed to be) University in Dehradun on Tuesday. At the event, degrees were awarded to 3,142 students. In his address, the minister acknowledged the issue of traffic congestion in the capital and assured the state govt of full support from the centre, once formal proposals are submitted. "These degrees are not just a symbol of knowledge but also a reminder of the responsibility to be good citizens and to contribute to society. Young people are the future of our nation, and India possesses the highest-skilled workforce globally," said Gadkari. He emphasised the importance of integrating higher education with a value-based system. "Even waste can be transformed into wealth with the right vision and technology. Hydrogen is the fuel of the future, and the most economical way to produce it is from organic waste. India is a hub of talent and research, and soon we will be pioneers in this sector along with business and social leadership," he added. Gadkari highlighted the need to focus on improving domestic happiness index, adding that real technological progress would be achieved when the country's 1.5 crore manual rickshaw drivers have access to humane, mechanised e-rickshaws and carts. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch CFD với công nghệ và tốc độ tốt hơn IC Markets Đăng ký Undo Chief minister Pushkar Singh Dhami praised the infrastructure projects credited to Gadkari, such as expressways, green corridors, and logistic hubs, calling them a part of the "new identity" of our nation. "Uttarakhand has received full cooperation from the centre when needed. We were the first state to implement a stringent anti-cheating law. Through the implementation of NEP and the establishment of hubs for AI, big data, and scientific research, we aim to become a leading state in higher education. Our goal is to prepare our youth for the future," said the CM. Education minister Dhan Singh Rawat, along with several other politicians and bureaucrats, also attended the event.