logo
MCG sets up grievance redressal cell to fast-track resolutions

MCG sets up grievance redressal cell to fast-track resolutions

Hindustan Times26-06-2025
The Municipal Corporation Gurugram (MCG) has set up a dedicated grievance redressal cell (GRC), effective immediately, in a bid to boost public service efficiency and accountability. The new unit will serve as a centralised system for monitoring and resolving complaints received through various central and state government platforms. The new unit will serve as a centralised system for monitoring and resolving complaints . (HT Archive)
Chaired by MCG commissioner Pradeep Dahiya, the GRC comprises four members: Ravinder Yadav, additional commissioner and member secretary; Vishal, joint commissioner-II; Dr Siddharth S Khandelwal, district town planner; and Dr Anita Phalswal, an expert with the MCG. The committee has been directed to address grievances on a daily basis and submit weekly reports to the commissioner.
'The committee is mandated to address and resolve grievances on a daily basis, submitting a detailed weekly report to the Commissioner,' Dahiya said, adding that any laxity in dealing with complaints would be taken seriously.
The cell will handle grievances lodged through a wide range of platforms, including CM Window, PM Window, Centralised Public Grievance Redress and Monitoring System (CPGRAM), Jan Samvaad, Social Media Grievance Tracker (SMGT), Sameer Portal, Gurugram Metropolitan Development Authority (GMDA) integrated command and control centre (ICCC), Auto Appeal System (AAS), Swachh City/Swachhta App, Swachh Haryana App (GRS), Commission for Air Quality Management (CAQM), Central Pollution Control Board (CPCB), and Samadhan Shivir.
MCG officials said the GRC will help reduce complaint response time, eliminate coordination gaps between departments, and provide timely updates to citizens. 'The idea is not only to respond but to ensure that public faith in civic functioning improves substantially,' an official said.
The cell is also expected to help track recurring complaints across wards and enable long-term fixes, especially related to sanitation, encroachments, water supply, and civic infrastructure.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Gurgaon pushes for sanitation overhaul with ward-level action plan
Gurgaon pushes for sanitation overhaul with ward-level action plan

Time of India

time2 days ago

  • Time of India

Gurgaon pushes for sanitation overhaul with ward-level action plan

Gurgaon: A ward-level cleanliness campaign will be launched to address the city's worsening sanitation crisis. The ward-wise strategy, announced as part of an elaborate action plan, includes the deployment of dedicated teams in each ward with no shortage of resources. Tired of too many ads? go ad free now Every ward will be treated as an independent unit, equipped with one earthmover, three tractors, four to five sanitation workers and oversight by the ward councillor, junior engineer and SDO. "A one-month intensive cleaning campaign will be undertaken in each ward. The best-performing ward will be honoured by the chief minister with a cash reward," urban local bodies (ULB) minister Vipul Goel said on Monday. Goel, who was in the city to review the sanitation work, asked officials to treat the campaign as a mission, saying "cleanliness in the city is a top priority for the state". He asked them to make the city "beautiful and clean". The plan was discussed at a review meeting held at the PWD rest house after the minister visited the Bandhwari waste plant. Goel — while addressing the meeting attended by deputy commissioner Ajay Kumar, MCG commissioner Pradeep Dahiya, municipal commissioner of Faridabad Dhirendra Khadgata and senior officials from GMDA and MCG — said Gurgaon is seen as a global city and the "work done here sends a message at the national and international level". Goel asked officials to submit a detailed report of the work done so far. He also said construction and demolition (C&D) waste sites must be improved without delay. Officials said tenders for C&D waste disposal will be issued before Aug 10. The minister also ordered a survey of 20-year-old sewer lines in areas prone to waterlogging. "Based on the report, it will be decided whether to repair or replace the sewer network. Tired of too many ads? go ad free now The task must be completed within a month," Goel said. The minister asked the officials to ensure secondary garbage collection points are properly enclosed to ensure these are not visibly unpleasant and improve hygiene surrounding these points. He ordered that potholes formed during monsoon be identified for early repair after the rains end. Earlier in the day, Goel visited the Bandhwari landfill site and directed the officials to ensure proper disposal of leachate generated at the waste management plant. He also asked the officials to expedite the tender process for the disposal of legacy waste. MCG chief Pradeep Dahiya said that beautification works at the plant are progressing well. "Improvements are being made not only from an environmental perspective but also to enhance the site's visual appeal for the general public. The installation of a view cutter to screen the plant from the road has been completed. A tender has been floated for additional works including plantation, fencing, tree guards, surface turfing and landscaping, with an estimated cost of Rs 96 lakh," Dahiya said. Meanwhile, MCG has launched an intensified garbage collection drive following directions from the ULB commissioner and secretary Vikas Gupta on Sunday.

Gurugram: MCG to penalise bulk waste violators, launches enforcement drive
Gurugram: MCG to penalise bulk waste violators, launches enforcement drive

Hindustan Times

time4 days ago

  • Hindustan Times

Gurugram: MCG to penalise bulk waste violators, launches enforcement drive

The Municipal Corporation of Gurugram (MCG) will launch a city-wide enforcement campaign against Bulk Waste Generators (BWGs) found violating the Solid Waste Management Rules, 2016, in a bid to improve sanitation and enforce environmental norms. To be sure, BWGs—defined as establishments generating 100 kilograms or more of waste per day—are legally obligated to segregate waste at the source into wet, dry, and hazardous categories. (HT Archive) The civic body will start issuing fines to non-compliant establishments from Monday, with the initial round involving issuance of notices and strict fines for continued violations. 'Entities not following the solid waste management norms will now face strict penalties. Initially, notices will be issued, and if non-compliance persists, heavy fines will follow,' said MCG commissioner Pradeep Dahiya, adding that the initiative is part of a broader awareness campaign. 'Despite repeated awareness campaigns, compliance remains poor. Now is the time for strict enforcement,' Dahiya said. To be sure, BWGs—defined as establishments generating 100 kilograms or more of waste per day—are legally obligated to segregate waste at the source into wet, dry, and hazardous categories. These include large housing societies, hotels, industrial units, institutional buildings, and office complexes. While wet waste must be composted on-site, dry and hazardous waste should be handed over to authorised recyclers, the MCG said. Officials clarified that the drive is not meant to be punitive alone but also aims to strengthen compliance and awareness among high-volume waste producers. The civic body has also urged all BWGs to implement proper segregation and disposal systems, promising technical assistance for those who need it. The move, authorities believe, will improve Gurugram's waste management ecosystem and position it as a model for sustainable urban living.

Bandhwari landfill to get ₹96 lakh green makeover
Bandhwari landfill to get ₹96 lakh green makeover

Hindustan Times

time7 days ago

  • Hindustan Times

Bandhwari landfill to get ₹96 lakh green makeover

Gurugram: The Municipal Corporation of Gurugram (MCG) has floated a tender worth ₹96lakh to beautify the Bandhwari landfill's front-facing stretch along the Gurugram-Faridabad Road. The initiative, which is a part of a larger ₹2.45 crore revamp, aims to mitigate the visual and environmental impact of the landfill through a mix of landscaping, fencing and plantation, officials aware of the matter, said. To enhance the aesthetic appeal of the Bandhwari landfill stretch, the Municipal Corporation of Gurugram (MCG) has initiated a beautification drive along its periphery to shield the massive garbage dump from public view in Gurugram. (PARVEEN KUMAR/HT) MCG commissioner Pradeep Dahiya said the project tender includes planting trees and shrubs, erecting fences, installing tree guards, and surface turfing alongside newly constructed view cutters. 'Administrative and technical approvals were already granted. The tender will be opened on July 29,' he added. 'This is not just about hiding a landfill. It is about setting a new standard in how civic bodies deal with legacy waste sites. The beautification is part of a broader vision for ecological restoration and urban cleanliness. A long-term plan is also being drafted, and a Request for Proposal (RFP) will be prepared by the end of September after appointing a consultant. The aim is to develop a sustainable solution,' Dahiya said. The MCG chief, along with additional commissioner Ravinder Yadav and Swachh Bharat Mission joint commissioner Dr Preetpal Singh, conducted a site inspection on Wednesday. The officials reviewed ongoing work at the site including the installation of view cutters, construction of an RCC drain, and preparations for the beautification project. As part of the makeover, a 15-metre-wide and 400-metre-long cement concrete (CC) road will be built along the view cutters. A boundary wall, stormwater drain, and a second weighbridge to improve garbage truck movement are also part of the plan. Installation of jersey barriers between the road and view cutters is already in progress. A commuter, Manoj Sharma, who is a resident of Sector 56 and works in Faridabad welcomed the move: 'For years, we have driven past the landfill holding our breath. It's unpleasant and embarrassing. If this makeover brings greenery and hides the garbage, it's a win for everyone.' Meanwhile, work on constructing view cutters, a boundary wall, and a stormwater drain worth ₹2 crore has already begun on July 14. According to MCG officials, view cutters are being installed to block direct sight of the landfill from the main road. Leachate and waste that had spread to the road outside the site have been cleaned and transferred inside, clearing the road and creating a dedicated internal route for garbage trucks—reducing traffic disruptions and improving hygiene. In addition, a ₹2.45-crore proposal was floated on July 18 (tender to be opened on July 29), which includes construction of a 15-metre-wide, 400-metre-long cement concrete road alongside view cutters. An RCC drain has also been proposed. To avoid traffic delays due to garbage trucks queuing outside, the civic body has planned to install a second weighbridge to streamline entry and exit. A diesel generator has already been set up to ensure continuous power supply for these operations, allowing round-the-clock work at the site. With these steps, MCG aims to make the Bandhwari landfill a model for sustainable and citizen-friendly waste management.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store