
New Ather Electric Scooter Headlight Design Patent Revealed
It is no secret that Ather Energy is working on a new electric scooter, which is likely to be positioned below the Rizta, a family scooter. The new electric scooter will be more affordable than any of the current Ather models and is likely to be comfort and commuter oriented rather being sporty. Now, we have an image of the design patent of the headlight assembly of the new electric scooter, which is rectangular in shape and could likely house one or two LED projector units. The design has been billed as the 'front shroud of the vehicle'.
The new headlight assembly could also have an LED lamp and is likely to get DRLs, which one can see, are bordering the rectangular headlight. What is also interesting to note that this will be the first Ather model to have a headlight on the handlebar. The 450 series and the Rizta have their headlights on the front apron and both models have a very distinct headlight design compared to the one seen in the design patent. Now, it is unlikely that the new headlight assembly will be used on a motorcycle because the cutouts where the handlebar will fit, is usually seen on scooters.
Presently, prices of the Ather 450 range start at Rs. 1.20 lakh for the Ather 450 and Rs. 1.90 lakh for the 450 Apex. Prices of the Rizta start at Rs. 1.05 lakh. Expect the prices of the new Ather scooter to start below Rs. 1 lakh.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
39 minutes ago
- Time of India
Police declare no-parking zone around Mall of Asia in Bengaluru
Bengaluru: Considering the regular traffic jams and minor accidents around Mall of Asia at Byatarayanapura on Ballari Road due to haphazard parking by visitors, police have declared the roads in front of and behind the shopping area as a 'no-parking zone'. According to the order issued on May 31 by the then police commissioner B Dayananda, the no-parking zone starts from the service road at Byatarayanapura Junction to GKVK Agricultural University's double road and the Railway Parallel Road behind the mall. The total length of the no-parking zone is around 1,300 metres. The notification was based on the proposals from assistant commissioner of police (traffic, northeast) and inspectors of Hebbal and Sanjaynagar traffic police stations. The commissioner, in his order, stated that thousands of people visit the mall every day. Due to high parking fees inside the mall and the time it takes to enter and exit the commercial building, people park their vehicles on the service road of BB Road in front of the mall, double road on the right side of Railway Parallel Road/GKVK Agricultural University, which is the road behind Mall of Asia, causing traffic congestion. "Following the order, in the initial 10 days, we used wheel locks on vehicles parked on these roads. It was half effective, so we started towing vehicles. Towing is not a regular occurrence… A private vehicle is hired when needed," said joint commissioner of police (traffic) MN Anucheth. Motorists will only be fined Rs 500 for parking in the no-parking zone. Measures are being taken to install no-parking boards at multiple places on these roads. So far, over 30 two-wheelers and over 10 cars have been towed, the officer added. Bengaluru: Considering the regular traffic jams and minor accidents around Mall of Asia at Byatarayanapura on Ballari Road due to haphazard parking by visitors, police have declared the roads in front of and behind the shopping area as a 'no-parking zone'. According to the order issued on May 31 by the then police commissioner B Dayananda, the no-parking zone starts from the service road at Byatarayanapura Junction to GKVK Agricultural University's double road and the Railway Parallel Road behind the mall. The total length of the no-parking zone is around 1,300 metres. The notification was based on the proposals from assistant commissioner of police (traffic, northeast) and inspectors of Hebbal and Sanjaynagar traffic police stations. The commissioner, in his order, stated that thousands of people visit the mall every day. Due to high parking fees inside the mall and the time it takes to enter and exit the commercial building, people park their vehicles on the service road of BB Road in front of the mall, double road on the right side of Railway Parallel Road/GKVK Agricultural University, which is the road behind Mall of Asia, causing traffic congestion. "Following the order, in the initial 10 days, we used wheel locks on vehicles parked on these roads. It was half effective, so we started towing vehicles. Towing is not a regular occurrence… A private vehicle is hired when needed," said joint commissioner of police (traffic) MN Anucheth. Motorists will only be fined Rs 500 for parking in the no-parking zone. Measures are being taken to install no-parking boards at multiple places on these roads. So far, over 30 two-wheelers and over 10 cars have been towed, the officer added.


Time of India
39 minutes ago
- Time of India
Meet fails to find consensus on Metro alignment in Thiruvananthapuram; state govt opts for further consultation
Thiruvananthapuram: The long-pending Metro rail project in the state capital has hit another roadblock, as the high-level meeting chaired by chief minister on Wednesday failed to finalise the alignment. Tired of too many ads? go ad free now Instead, the state govt decided to constitute an advisory committee to consult stakeholders on the various alignment proposals, effectively pushing the project back to square one. According to sources, the decision to form the committee was taken after multiple stakeholders presented differing alignment suggestions, complicating the planning process. The committee will be formed under the leadership of the chief secretary. It will examine related matters and submit its recommendations. The committee will include the secretaries of revenue, finance, local self-govt and transport departments. Kochi Metro Rail Limited (KMRL), the implementing agency of the project, presented six alignment options during the meeting. However, Shashi Tharoor, MP, who participated online, also submitted his alignment proposals, prompting the chief minister to recommend further stakeholder consultation before moving forward. In a post on social media platform X, Tharoor wrote, "Had a very constructive online meeting this morning (Wednesday), chaired by the Chief Minister @pinarayivijayan, to discuss plans for a Metro in Thiruvananthapuram, something I have been clamouring for ever since becoming an MP." He added that an advisory committee would be formed to evaluate the proposals. "Our vision for the Metro must be to anticipate the needs of generations yet unborn," Tharoor posted. Tired of too many ads? go ad free now "I am confident that, with the right approach, we can make Thiruvananthapuram an ideal capital city for the 21st century," he added. Meanwhile, KMRL chief Loknath Behera described the meeting as positive and expressed hope that a final decision would be made soon. "A presentation about the alignments of the proposed Metro rail in Thiruvananthapuram was completed. Now, the govt has to take a final decision," he told TOI. Once the alignment is finalised, it will be handed back to KMRL to revise the detailed project report (DPR) originally prepared by Delhi Metro Rail Corporation (DMRC). The DPR's executive summary was submitted to the state govt in Feb 2024. The finance department gave its approval to the project earlier this year. After the chief minister's nod, the project will be sent to the state cabinet for final clearance. In the 2025-26 state budget, the govt announced that preliminary work on the Metro would begin within the year. However, alignment disputes continue to stall progress. The transport department earlier rejected DMRC's original alignment, citing impracticalities and suggested an alternative route beginning at Kazhakkoottam instead of Pallipuram on NH 66. As per the previous cost estimate prepared by DMRC, the project will cost Rs 11,560.8 crore. The KMRL proposed a conventional Metro in Thiruvananthapuram instead of a light Metro, which was initially proposed. It was earlier said that DMRC would submit the report to the KMRL in Jan last year, which would in turn submit it to the state govt by the end of Jan after reviewing it. However, it was delayed.


Time of India
an hour ago
- Time of India
Ranchi vendor markets sinking under choked drains, unhygienic surroundings, & poor infra
1 2 Ranchi: The city's main vendor markets, especially Naga Baba Khatal and Kokar, are characterised by choked drains, unhygienic surroundings, and poor infrastructure. These public spaces remain on the margins of municipal attention in spite of being important areas in a civilised society. A vendor at Rs 10.86-crore valued Naga Baba Khatal Vendor Market, Rekha Devi, said, "Overflowing drains, stagnant water, and heaps of rotting vegetables have turned the area unbearable. Even a small shower turns this place into a filthy swamp. The stink is terrible. Customers avoid coming here." Echoing the statement, customer Neha Kumari said, "The area lacks drainage system. We have to walk in muck mixed with vegetable waste. Toilets are barely usable, especially for women." At Kokar Vendor Market, vendors operate beside garbage piles and blocked drains. "The waste isn't picked up regularly, turning into heaps and lying scattered with rainwater," said Imran, a fruit seller. The Atal Vendor Market, built at a cost of Rs 54 crore with 478 shops, is structurally better but overcrowded. Vendors and customers struggle to navigate narrow congested passages. "There's no space to walk during rush hours, especially when shopkeepers display goods outside their stalls," said Arun Kumar, a vendor. Though these markets were constructed to decongest roads and fight encroachments, their neglected condition is forcing vendors back onto roads and footpaths. "The markets helped control encroachment to some extent. However, the vendors prefer doing their business from the roadside, where footfall is higher and conditions are manageable," said Shabnam Ansari, a vendor at Naga Baba Market. Assistant municipal commissioner Nikesh Kumar said, "Each market has four to five cleaning staff. Restoration files have been submitted to the authorities. Upgradation of infrastructure would begin based on approval." "For hundreds of vendors and thousands of customers, restoring hygiene and functionality in these markets isn't about comfortbut survival," said Ritu Sinha, another customer at the Atal Vendor Market.