logo
RPSC recruitment 2025: Notification out for 12121 VO, AAE, and other posts, details here

RPSC recruitment 2025: Notification out for 12121 VO, AAE, and other posts, details here

Scroll.in18-07-2025
The Rajasthan Public Service Commission (RPSC) has invited online applications from eligible candidates for the Sr. Teacher Comp. Exam - 2025 (Advt. No. 07/2025-26), School Lecturer (School Education) - 2025 (Advt. 06/2025-26), Veterinary Officer - 2025 (Advt. 04/2025-26), Assistant Agriculture Engineer - 2025 (Advt. 03/2025-26), and Sub Inspector/Platoon Commander - 2025 (Advt. 05/2025-26). Eligible candidates can apply for the posts at rpsc.rajasthan.gov.in as per the notified schedule.
The recruitment drive aims to fill 12121 VO, AAE, Se Teacher, and other posts. As per the notification, the registration window for various posts will open as follows:
Assistant Agriculture Engineer - 2025 (Advt. 03/2025-26) — from July 28 to August 26, 2025.
Veterinary Officer - 2025 (Advt. 04/2025-26) — from August 5 to September 3, 2025.
Sub Inspector/Platoon Commander - 2025 (Advt. 05/2025-26) — August 10 to September 8, 2025.
School Lecturer (School Education) - 2025 (Advt. 06/2025-26) — August 14 to September 12, 2025.
Sr. Teacher Comp. Exam - 2025 (Advt. No. 07/2025-26) — August 19 to September 17, 2025.
Applicants can check more details available in the notifications below:
Application Fee
Candidates from General/Unreserved categories will have to pay an examination fee of Rs 600 while SC/ST/OBC/PwBD and other reserved category candidates will pay Rs 400 at the time of application.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

NGT takes note of illegal jetty construction on Chilika banks
NGT takes note of illegal jetty construction on Chilika banks

Time of India

timean hour ago

  • Time of India

NGT takes note of illegal jetty construction on Chilika banks

Cuttack: National Green Tribunal ( NGT ), East zone bench, in Kolkata has taken cognisance of a petition filed by Maa Kalijaee Motor Boat Workers Union, alleging illegal construction of a concrete jetty at Garadwar in Khurda district on the banks of Chilika lake. The bench comprising Justice B Amit Sthalekar (judicial member) and Dr Arun Kumar Verma (expert member) has issued notices to the Odisha State Coastal Zone Management Authority (SCZMA), Odisha State Pollution Control Board, Wetland Authority, and Chilika Development Authority, along with the private company behind the project. The matter was heard on Aug 1. The petitioners, represented by advocates Sankar Prasad Pani and Ashutosh Padhy, alleged that the jetty is being built without CRZ clearance and violates environmental norms. The petitioner society represents traditional boat workers and fisher folk who have relied on Chilika lake for generations. After fishing rights were suspended in 2017, many of them turned to tourism for livelihood. They have been demanding construction of a jetty to support their work, but claim their pleas have been ignored. The petitioners pointed out that the construction site falls under CRZ-III A and CRZ-IV B zones, where stringent restrictions are in place under the Coastal Regulation Zone Notification, 2019. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Online & Flexible degrees BITS Pilani Digital Apply Now They argued that while CRZ clearance was granted in 2022 for a floating jetty in Satapada (Puri district), no such permission exists for the ongoing construction in Garadwar. The petitioners had submitted a complaint to the Khordha district collector on April 11, 2025, demanding that work be stopped, but claimed that no action was taken. Protests were also reported at the site in May, followed by media coverage, but officials allegedly remained inactive. The bench noted that the issue merits serious consideration and directed all respondents of the notices to file their replies within four weeks. The matter has been listed for hearing on Sept 15. The petition has also sought directions for immediate halting of construction, demolition of the jetty, restoration of the site, and exemplary costs on the private firm for violation of CRZ norms and polluting the lake with untreated sewage. The disputed jetty is reportedly part of a Rs 14.67 crore luxury tourism project approved in principle by the Odisha govt in July 2024, featuring houseboats, cottages, a spa, and an adventure park.

Blue Line ACs, ventilation system to undergo 500cr overhaul after 40 years
Blue Line ACs, ventilation system to undergo 500cr overhaul after 40 years

Time of India

time2 hours ago

  • Time of India

Blue Line ACs, ventilation system to undergo 500cr overhaul after 40 years

1 2 Kolkata: Metro Railway has decided to pump Rs 500 crore to revamp the four-decades old air-conditioning and ventilation system between Rabindra Sarobar and Belgachhia stations in the North-South or Blue Line. There are 15 underground stations in this line. Sources said the tendering for overhauling the environmental control system (ECS) or the air-conditioning system for 15 stations dotting the 16.9 km section from Rabindra Sarobar to Belgachhia that has been floated will also include replacing the AC and ventilation of the twin tunnels. "The work is mainly aimed at ensuring cooler stations and tunnels. It will also improve the fire safety system, making sure there is proper ventilation inside the tunnels when a fire breaks out and passengers need to be evacuated," a source said. He said the air-conditioning and ventilation will be upgraded in accordance with the current ambient temperature, which has risen considerably since metro first started operations around 40 years ago. The 15 underground Blue Line stations have centralised air-conditioning systems which include water-cooled chillers, towers, coils, and ducts through which cool air is released into the platform, concourse, and mezzanine levels. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Man Saves Pennies For 45 Years Despite Warning Undo "These are now considered primitive. They will have to be replaced with modern heating ventilation and air conditioning (HVAC) systems," an official said. You Can Also Check: Kolkata AQI | Weather in Kolkata | Bank Holidays in Kolkata | Public Holidays in Kolkata The Blue Line, currently running a 30 km underground and elevated corridor from Dakshineswar to Shaheed Khudiram, was India's first underground metro when its 3.4 km Esplanade-Bhowanipore stretch was launched on Oct 24, 1984. Over the years, it expanded north and southwards across the city's central axis. The southern terminal station at New Garia, Kavi Subhash, was shut down on July 28, when cracks were spotted on the columns supporting the Dakshineswar-bound or Up platform. Truncated operations are run till the second last southern station at Dhalai Bridge, Shaheed Khudiram. Metro Railway announced that the Kavi Subhash station will be rebuilt. The tender process is likely to end this month, following which the lowest bidder will start the work. Sources said the work will take at least four or five years to complete. "The work will be done while the commercial operations continue uninterrupted. Therefore, work will take time, unlike greenfield projects," a source said. Surface stations like Dum Dum, Noapara, and those between Mahanayak Uttam Kumar (Tollygunge), Shaheed Khudiram, and Kavi Subhash (New Garia) don't have cooling units. Officials said the basic design of North-South Metro, done by IIT-Kharagpur, was advanced, but the various equipment used in the metro system need upgradation and replacement due to the passage of time. Keeping this in mind, Metro Railway engaged RITES to conduct a health study.

Marine fish landings in Andhra Pradesh decline amid heatwaves & cyclones
Marine fish landings in Andhra Pradesh decline amid heatwaves & cyclones

Time of India

time2 hours ago

  • Time of India

Marine fish landings in Andhra Pradesh decline amid heatwaves & cyclones

Visakhapatnam: Andhra Pradesh recorded 1.75 lakh tonnes of marine fish landings in 2024, marking an 8% decline from 2023 and a 19% drop from 2022. Notably, Indian mackerel was the most landed species in Andhra Pradesh at 32,490 tonnes, a surge of 76% compared to 18,490 tonnes, representing the highest landing in the past decade. Penaeid shrimp secured the second position with 12,320 tonnes landed. Meanwhile, Lesser sardines maintained their third-place ranking, showing a modest 3% recovery after a steep 72% fall in 2023. This trend was mirrored nationwide. India's marine fish landings experienced a marginal decline of 2%, decreasing from 35.3 lakh tonnes in 2023 to 34.5 lakh tonnes in 2024. The overall downturn was driven by reduced landings along the West Coast, whereas the East Coast saw growth. These were some key findings of the ICAR-Central Marine Fisheries Research Institute's annual report 2024. Despite the decline in quantity, the value of marine fish landings in Andhra Pradesh was estimated at Rs 3,176 crore, reflecting a slight increase from Rs 3,162 crore in 2023. Similarly, at the retail level, the value of fish landings rose to Rs 4,507 crore from Rs 4,456 crore the previous year. Across India in 2024, marine fish landings were valued at Rs 62,702 crore at landing centres and Rs 90,104 crore at retail centres, registering increases of 4.22% and 8.46%, respectively. Within Andhra Pradesh, Kakinada district contributed the largest share at 40%, followed by Visakhapatnam at 22%. The newly operational Juvvaladinne fishing harbour in Nellore, which commenced operations in June 2024, accounted for 3% of landings among major harbours. According to the CMFRI report, environmental factors played a significant role in the decline of fish landings in Andhra Pradesh, with increased heatwave days and cyclones (Dana in Oct and Fengal in Nov), leading to notable drops in fourth-quarter catches. The rise in heatwave days, coupled with frequent weather disturbances in the Bay of Bengal, exacerbated the impact of these cyclones on both livelihoods and marine productivity. Turning to marketing efficiency, measured as the fishers' share of the consumer's rupee (FSCR), this varied across states for major species. Kerala recorded the highest efficiency at 71.59%, followed closely by Andhra Pradesh at 70.48% and Daman and Diu at 70.05%. In terms of fishing methods, multiday trawlers accounted for the major share of estimated landings in Andhra Pradesh at 47%, followed by motorised gillnetters (20.2%) and motorised ring seiners (19.9%). Other significant contributors included motorised hook and lines and non-motorised gears. Catch rates for single-day trawls reached 83 kg/hour, marking a significant increase from the previous year. Multiday trawls also saw an improved catch rate of 43 kg/hour. The highest catch per unit effort was observed in ring seines (886 kg/unit), followed by motorised hook and lines (380 kg/unit) and motorised gillnets (156 kg/unit). Artisanal (non-motorised) fishing gears had a catch rate of 91 kg/unit. An economic analysis of mechanised multiday trawlers was carried out by CMFRI for the Kakinada and Visakhapatnam harbours. In 2024, the average operating cost of a mechanised multiday trawl net in Kakinada was Rs 1,67,005, with an average gross revenue of Rs 1,91,117. Similarly, at Visakhapatnam, the operating cost was Rs 2,12,968, with average gross revenue amounting to Rs 2,31,669. For motorised single-day trammel nets and ring seines in Srikakulam district, the operating costs were Rs 30,675 and Rs 24,946 per unit respectively, with average gross revenues of Rs 59,242 and Rs 45,658. Non-motorised single-day gillnets in Vizianagaram district had an operating cost of Rs 4,631, generating an average gross revenue of Rs 9,165. It is noteworthy that the capital productivity of single-day fishing using non-motorised gillnets was efficient, with a lower operating ratio of 0.51 compared to other craft-gear combinations. Capital productivity ranged from 0.51 for non-motorised gillnets (single-day fishing) at the Bavanapadu landing centre in Srikakulam district, up to 0.88. Gross value added was highest for non-motorised gillnets operating in Srikakulam district, reaching 99%.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store