logo
Seven new bypass roads proposed across Tripura to boost connectivity: CM Manik Saha

Seven new bypass roads proposed across Tripura to boost connectivity: CM Manik Saha

Malaysia Sun15 hours ago
Agartala (Tripura) [India], July 20 (ANI): In a major push towards infrastructure development, Tripura Chief Minister Manik Saha announced that seven new bypass roads have been proposed across the state to ease traffic and enhance connectivity.
CM Saha reiterated the government's commitment on Saturday to linking all district and subdivision headquarters, as well as unconnected habitations, to national highways via double-lane roads.
CM Saha made these remarks while addressing the National Seminar on Infrastructure Development in the North-East Region of India, held at Pragna Bhavan, Agartala.
He highlighted the government's long-term infrastructure vision, asserting that robust infrastructure is the backbone of economic growth and regional empowerment.
'Without infrastructure, nothing can be achieved. Roads, highways, airports, water supply, and urban infrastructure play a key role in industrial growth, service expansion, and social welfare,' the Chief Minister said.
He emphasised that the state has undertaken numerous transformative initiatives in the past seven years that have significantly improved its socio-economic landscape.
Saha revealed that a 449 km ring road has been proposed for Agartala under the Bharatmala scheme. The alignment includes the Agartala Bypass from Khayerpur to Amtali, an Eastern Bypass from Lembuchara to Khayerpur, and a Western Bypass connecting Lembuchara to Amtali. Flyover construction is also on the cards, with the Radhanagar to IGM Hospital flyover to be undertaken in the first phase.
The seven new bypass roads are proposed at Kumargarh, Dhanpur, Manu, Ambassa, Teliamura, Ranirbazar, and Jirania, all key towns where national highways currently run through congested areas.
'In the previous budget, over Rs7,000 crore was allocated specifically for infrastructure development,' he added.
Tripura CM provided detailed statistics on Tripura's existing road infrastructure, stating that the total Public Works Department (PWD) road length in the state is 10,618.423 kilometres. This includes 1,057 kilometres of state highways, 171 kilometres of major district roads, 483 kilometres of other district roads, 1,167 kilometres of urban roads, and 7,740 kilometres of village roads.
The national highway network in the state spans 923 kilometres, out of which 509 kilometres have already been upgraded to double-lane roads with paved shoulders. Additionally, four more national highways covering a total distance of 229 kilometres have been declared in principle.
Plans are in place to upgrade the entire 1,057 km of state highways to double-lane roads, he added.
Highlighting Tripura's strategic importance, CM Saha said, 'The northeastern region is India's powerhouse with massive hydropower, petroleum, and gas potential. Tripura, sharing borders with Bangladesh, can serve as a vital gateway to Southeast Asia.'
He also mentioned the nearing completion of the Light House Project, and construction of the Unity Mall and several high-rise departmental buildings, aimed at modernising Tripura's urban landscape.
The event was attended by several dignitaries, including Engineer Chinmay Debnath, Engineer O.P. Goel, Indian Building Congress President Engineer Rajiv Dabbrama, PWD Chief Engineer Engineer Shyamlal Bhowmik, and other senior officials and stakeholders in the infrastructure sector. (ANI)
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

25 years of clay and craft: Ramadas Pottery keeps tradition alive in Kuala Selangor
25 years of clay and craft: Ramadas Pottery keeps tradition alive in Kuala Selangor

Sinar Daily

time9 hours ago

  • Sinar Daily

25 years of clay and craft: Ramadas Pottery keeps tradition alive in Kuala Selangor

Having started pottery-making in 1976, Ramadas said demand for clay products remains strong as more people recognise their advantages over modern cookware. 20 Jul 2025 07:00pm V. Ramadas remains dedicated to shaping clay using the 'throwing wheel' technique (a process of shaping clay) inherited from his father to make clay pots, rice cookers and water jars. Photo by Bernama TUCKED behind a row of old shophouses along Jalan Ara here is a pottery workshop that has withstood the test of time for three generations, crafting a range of clay products using time-honoured techniques and tools over 25 years old. This is where Ramadas Pottery, owned by V. Ramadas, 74, is located. He remains dedicated to shaping clay using the 'throwing wheel' technique (a process of shaping clay) inherited from his father to make clay pots, rice cookers and water jars. V. Ramadas remains dedicated to shaping clay using the 'throwing wheel' technique (a process of shaping clay) inherited from his father to make clay pots, rice cookers and water jars. Photo by Bernama "We do use modern pottery machines at the factory, but at this shop, I maintain the traditional methods. Tourists enjoy watching the old techniques, and many want to try making the pottery themselves,' he said when met during the Star Healing 2025 programme organised by Tourism Malaysia at his premises recently. Having started pottery-making in 1976, Ramadas said demand for clay products remains strong as more people recognise their advantages over modern cookware. "These clay pots are cleaner and safer to use. In fact, when SIRIM tested them, it was proven that my pottery is free from chemical content. That's why many customers still choose these pots for traditional cooking,' he explained. According to him, if used regularly, pottery items can last up to a year, and if used as decoration, they can last much longer. Recognised as a Master Craftsperson (Adiguru) in Pottery Craft in 2012, Ramadas didn't just rely on his father's legacy. He expanded his skills by attending courses both locally and abroad, including in Indonesia, India, Vietnam, China and at the Malaysian Institute of Art (MIA). "I didn't want my knowledge to end with what my father taught me. That's why I sought out new knowledge to improve my techniques and styles so they evolve with the times,' he said. His relentless efforts bore fruit when the father of three successfully opened his own factory in 2000 with a starting grant of RM2,000, presented by then Selangor Menteri Besar Tan Sri Muhammad Muhd Taib, after witnessing his skills firsthand. "At the time, he came as a tourist and watched me make pottery the traditional way. After 20 minutes, he immediately offered me assistance,' Ramadas shared. V. Ramadas remains dedicated to shaping clay using the 'throwing wheel' technique (a process of shaping clay) inherited from his father to make clay pots, rice cookers and water jars. Photo by Bernama Today, his factory produces between 3,000 and 4,000 small pottery items per month, while larger pottery products can reach up to 4,000 units monthly for the local market. "I'm happy when people come not just to buy, but to learn. As long as there is interest, I will keep making pottery,' he said, adding that he uses at least one tonne of clay each month to produce his items. For those interested in experiencing the craft, participants need only make an appointment for each session, which lasts two hours and gives them the opportunity to make two basic pottery items from clay, under Ramadas' own guidance. He said the classes attract not only local tourists but also participants from the United States, Russia, and Italy, proving that Malaysia's traditional arts remain relevant and admired internationally. - BERNAMA

New facility for Sibu Autistic Association delayed by RM5.9 mln shortfall
New facility for Sibu Autistic Association delayed by RM5.9 mln shortfall

Borneo Post

time10 hours ago

  • Borneo Post

New facility for Sibu Autistic Association delayed by RM5.9 mln shortfall

(Seated from third right) Ngu, Wong, Dr Soon, and others during the photo session. – Photo by Peter Boon SIBU (July 20): The Sibu Autistic Association (SAA) still requires RM5.9 million to complete its new building project, as only RM700,000 has been raised so far. SAA chairman David Ngu revealed that the 15-month project located at Jalan Alan here carries a total estimated cost of RM6.5 million. Ngu expressed relief upon receiving a RM200,000 donation from a charitable organisation based in Peninsular Malaysia. 'We are still very far off financially. That's why I constantly seek financial help,' Ngu told a press conference here today. According to him, one of SAA's founding members, Wong Ching Yong, had approached him and asked if there was any way that he could assist. Ngu explained that he had conveyed the urgency of the funding shortfall to Wong and detailed previous efforts that had not yielded promising results. 'He (Wong) suggested that I write a letter to a charitable body in Peninsular and not long after, we received a reply confirming a contribution of RM200,000. 'We are extremely grateful for their generosity. It is the largest single donation received so far,' he said, while thanking Wong for his assistance. It was learnt that the charitable body contributing the RM200,000 donation is the Lee Foundation States of Malaya. Ngu also revealed that Deputy Minister of Public Health, Housing and Local Government Datuk Michael Tiang, who is also Pelawan assemblyman, has pledged RM500,000 from his Rural Transformation Project (RTP) allocation for road and drainage infrastructure. Meanwhile, Wong disclosed his prior involvement as organising chairman for SAA's annual food fair fundraising campaign from 2000 to 2020, giving him insight into the association's long-standing financial challenges. 'Sibu folks have always been generous in stepping forward to donate. Currently, SAA is constructing a new facility specifically for young adults with autism,' said Wong, who also serves as the Sarawak United People's Party (SUPP) Dudong branch chairman. 'Back in 2000, they were all children. Now they have grown up and need a facility that can help them acquire skills for independent living, especially when their parents are no longer around. 'This is one of the primary purposes of the new building,' he said. Wong added that while RM700,000 has been raised, the funding gap remains wide, and more contributions are urgently needed from the public. Ngu noted that the current facility houses around 60 children aged up to 12, while the upcoming building – now nearing completion – is intended to accommodate up to 200 young adults, depending on staff availability. He added that the new building will provide vocational training, including farming activities, basic food preparation, and life skills for its residents. He further stated that Minister of Women, Childhood and Community Wellbeing Development Minister Dato Sri Fatimah Abdullah will officiate the roof-topping ceremony on August 18. The project is reportedly ahead of schedule. 'Initially, the project was scheduled for completion in May, 2026. However, based on the latest update from the contractor, it is expected to be completed by the end of this year,' said Ngu. When completed, the three-storey facility will include offices and administration space on the ground floor, classrooms on the first floor, and therapy session rooms on the third floor. Also present at the press conference was SUPP Dudong advisor Datuk Dr Soon Choon Teck. David Ngu new building shortfall Sibu Autistic Association

Five enterprises named state winners of Shell LiveWire Malaysia 2025
Five enterprises named state winners of Shell LiveWire Malaysia 2025

New Straits Times

time11 hours ago

  • New Straits Times

Five enterprises named state winners of Shell LiveWire Malaysia 2025

KUALA LUMPUR: Shell has recognised five enterprises as state winners in the Peninsular Malaysia edition of its Shell LiveWire Malaysia programme. This year's winners are Earnest Grower Sdn Bhd, Lorry System Sdn Bhd, Mensilin Green Energy Sdn Bhd, Midwest Composites Sdn Bhd and Rebooz Technology Sdn Bhd. Shell said the participants began their journey with an intensive bootcamp aimed at strengthening their entrepreneurial capabilities. Ten promising finalists were shortlisted for the final pitching round, where they presented compelling business plans and demonstrated strong potential for innovation and growth. Each of the five winning enterprises received a RM10,000 startup grant from Shell, along with a year-long business coaching programme to support their strategic development and business expansion. The winners also gain access to the global LiveWire network, an international community of entrepreneurs where they can exchange ideas, share experiences and potentially be shortlisted for the prestigious Shell Global Top Ten Innovators Awards. Shell general manager of business operations for Kuala Lumpur Syed Hussain Taha said witnessing the passion and determination of local talents has reinforced his belief in the positive impact of the initiative. He said it enables individuals to build sustainable businesses that not only drive their own growth, but also benefit communities and create valuable employment opportunities. "I personally encourage all budding entrepreneurs to take part in this programme, which offers the guidance, tools, and support needed to turn dreams into reality," he added. Shell LiveWire is Shell's flagship programme for enterprise development, designed to boost local economies worldwide by encouraging entrepreneurship and nurturing emerging business leaders. Launched in Sabah in 2015, followed by Sarawak in 2016 and Peninsular Malaysia in 2022, the programme aims to inspire young entrepreneurs to develop innovative, practical business solutions that address current socio-economic challenges.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store