
‘Mahon Point 2.0' promises more apartments, office and retail spaces and jobs
Named Mahon Point 2.0, it will bring 251 new apartments, in a range of household sizes, with access to open space, play areas, and recreational amenities.
Justin Young, centre director at Mahon Point Shopping Centre, said: 'For the last 20 years, Mahon Point Shopping Centre has been the heart and meeting place for Mahon's community and the wider region. We are excited to present a demand-led expansion that enhances Mahon for everyone and looks forward to the next 20 years.
'By placing homes, sustainable transport, and civic amenities at the core of this vision, we hope to create a new chapter in Cork's growth that reflects community values as much as economic ambition.'
The development, which will create 365 construction jobs, will also include a purpose-built crèche supporting 64 child spaces.
It will also feature a new market square and civic plaza to host the Mahon Point Farmers Market, public events and community activities
New retail space will feature with 3,000 sqm to be developed along with a new office block offering over 70,000 sq ft of workspace.
Transport will be central to the development with the construction of a multi-storey Car Park with 704 spaces, enhanced pedestrian and cycle infrastructure, segregation from vehicle traffic via an underpass, and future-proofed connectivity for light rail (Luas-style) and BusConnects services.
Peter O'Meara, director at real estate company Savills Ireland, said: 'Cork is emerging as an international centre of scale, with a projected population growth of 50-60pc by 2040. With strong demand across residential and retail sectors, this development answers the call for high-quality, integrated spaces that serve both current and future generations.'
Members of the public are invited to attend a Public Information Event on the proposed Mahon Point 2.0 development, taking place on Tuesday, July 8 from 4pm to 7pm in the Community Room at Mahon Point Shopping Centre. This event will give local residents, businesses and others the opportunity to learn more about the plans, meet the project team, and ask questions in an informal setting.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Irish Times
6 days ago
- Irish Times
Dublin's new Dart station 40 minutes from the city will be a ‘godsend'
For Aisling Ronayne the opening of Irish Rail 's new Dart station at Woodbrook in south Dublin on Sunday is to be a godsend. As one of the residents of the new Woodbrook housing development located between Bray and Shankill, she is within shouting distance of the Dart line. However, it is too far to walk to either Bray or Shankill stations, and parking at these stations for cars is limited. Her route to work in Dublin involves driving via the M11 and the M50 to the Luas in Carrickmines. 'You can park there for €3 a day," she said. Ms Roynane lives with her infant son and her husband, who has been working remotely from home. 'It is not ideal, but we make it work,' she said of the family's commuter arrangements. READ MORE What is difficult, she says, is 'the €70 taxi fare from Dublin' that has to be added to the bill for a night out in the city. 'It will be a whole lot better when the [Woodbrook] station opens,' she said. 'My husband is being asked to work back in the office, he works in Dún Laoghaire, and we will be able to get the Dart at Woodbrook to work and we can use it for the occasional night out in town.' When The Irish Times met Ms Ronayne on Thursday morning she was pushing her son in a stroller, on Woodbrook Avenue, a road through her estate to the Dart line. It is a new road and on Thursday workers were busy getting the last section finished to link up with the station. 'I hope it is done for Sunday,' she said. Woodbrook is a large development with many of the terraced, three-storey homes recently completed and awaiting occupants. Construction is continuing on part of the estate south of Shanganagh cemetery and much of this is around the railway, putting the station out of sight and reach. 'The new station is behind Shanganagh cemetery,' said Oliver Plunkett who was walking with his sister Marie and dog Rue. 'It is hard to find. But if you go up to the railway line just past the cemetery you can look down the track to it,' said Oliver. The brother and sister said they were hoping to see where the access route to the station would be. 'We are trying to find it,' said Marie. Irish Rail, which is to open the station on Sunday, said the road through Woodbrook estate will be completed, and a pedestrian path from beside Shanganagh cemetery is to be put in place by Dún Laoghaire Rathdown County Council 'but it is not there yet'. From Sunday, Woodbrook will become the 147th station on the rail network. The new station is some 250 metres north of the former Woodbrook halt, which served the area from 1910 to 1960. Service frequency is to be about every 10 minutes in each direction on weekdays. The journey to Dublin city centre will be about 40 minutes. The station consists of two 174m-long platforms with associated passenger shelters, seating, lighting, CCTV, customer information, bicycle parking and ticketing facilities, Irish Rail said. Access to the southbound platform is via a new pedestrian bridge with ramped and stepped access. Dart services will begin serving Woodbrook Station in advance of the official opening at 11.45am by Minister for Transport Darragh O'Brien and the cathaoirleach of Dún Laoghaire Rathdown County Council, Jim Gildea. To mark the official opening, there will be a family fun day with entertainment for children and adults at the station. Irish Rail said as parking at Woodbrook will be limited, visitors are being asked to take the train to the events.


Irish Times
6 days ago
- Irish Times
Transport authority approves settlement of Swords BusConnects corridor legal action
The board of the National Transport Authority (NTA) has approved a proposed settlement to halt legal action taken against its planned BusConnects corridor from Swords to Dublin city centre. The NTA would not disclose the terms of the settlement, but the board's approval raises hopes judicial review proceedings will be dropped to allow construction of the 12km route granted planning permission more than a year ago. The Swords corridor is one of 12 segregated bus routes to be built as part of the €4 billion scheme to transform the capital's bus services. The planned route runs from the south side of Swords town in north Dublin, past Dublin Airport and through Santry along the Swords Road, then along the Drumcondra Road and Dorset Street to the top of O'Connell Street and Parnell Square. READ MORE The NTA secured permission from An Bord Pleanála for the route in June of last year, but judicial review proceedings against the board's decision were initiated in August by two separate parties: owners of a business park near the airport and a veterinary practice south of Swords. The cases have not yet been heard in the High Court but in their submissions to An Bord Pleanála both Brendan Collins, of Collinstown Business Park, and Conor O'Scanaill, of O'Scanaill Veterinary Surgeons raised concerns about the effect the bus corridor would have on their properties. Minutes of a recent NTA board meeting show details of a 'settlement proposal' were presented to the board by interim NTA chief executive Hugh Creegan. 'Following the overview provided, the board approved the terms of the proposed agreement to settle the particular judicial reviews proceedings being taken in relation to the Swords to City Centre Core Bus Corridor scheme,' the minutes state. This is the first settlement approved by the board in an effort to bring an end to legal action taken against one of the bus corridor schemes. Of the 12 corridors, judicial review proceedings have been taken in relation to seven, the corridors from Swords, Clongriffin, Belfield/Blackrock, Blanchardstown, Templeogue/Rathfarnham, Bray and Kimmage. The other five now have 'full' planning permission as the time frame by which they could be challenged in the courts has expired. These are the routes from Ballymun/Finglas, Liffey Valley , Ringsend, Tallaght/Clondalkin and Lucan. [ BusConnects route will come in 'on time, on budget', says Darragh O'Brien Opens in new window ] Green Party transport spokesman Feljin Jose said the delays caused by the judicial reviews were extremely concerning. 'The NTA has to build three of these at the same time over the next four to five years to get this done this side of 2035. Seven out of the 12 approved corridors in judicial review is not a good return rate and will add at least a year, maybe up to two years, delay.' The settlement of the Swords cases would be a win for Dubliners, he said. 'Without knowing the details of the settlement I can only say it's good news if the cases are dropped and the quicker we can get this done and have bus priority and improved cycling and pedestrian infrastructure.' The plaintiffs and their legal representatives declined to comment on the settlement agreement. A spokeswoman for the NTA said it could not comment on the details of the proposed agreement 'other than to acknowledge that the board approved the terms of the agreement at the June board' meeting. Construction of the first core bus corridor from Liffey Valley to the city centre is due to begin next month.


The Irish Sun
04-08-2025
- The Irish Sun
World's biggest airport with 185million passengers to open by 2030 – and could have direct UK flights
CONSTRUCTION has begun on what will be the biggest airport in the world. King Salman International Airport in Saudi Arabia is set to open in 2030, and will be the size of 14,000 football fields. 5 The airport will have six runways and be the biggest in the world Credit: Foster + Partners 5 It will have plenty of space to relax before a flight - and lots of shops Credit: Foster + Partners The mega-sized airport will be built around the existing King Khalid International Airport in Riyadh. The extension was was first announced in November 2022 and when finished the huge airport will be 57 square kilometers. Of that, 12 square kilometers will be reserved for shopping. Currently, the King Khalid International Airport has two parallel runways. Read More on Holidays OFF TRACK Five stunning European holidays that are cheaper than a UK train fare With the new extension, this will be increased to six and will see 120 million passengers by 2030. By 2050, the amount of passengers will increase to 185 million. With the opening of the airport, the number of aircraft takeoffs and landings in Saudi Arabia will go from 211,000 per year to over one million. The estimated cost of the project currently stands at $30 billion (£22.5 billion). In January 2025, the terminal overhaul at King Khalid International Airport was completed - bringing the extension closer to completion. The revamped terminal features new facilities, including 38 check-in counters, 10 self-service kiosks, 26 passport control counters, and 10 automated gates. Inside Saudi Arabia's plan for £3.8bn seaside resort built on blood as vid shows work underway for Dubai-style hotspot Terminal 1 now also has 24 boarding gates, 40 passport control counters in the arrivals area, and 11 self-service gates. The airport is being designed by the British architecture firm Foster + Partners. The company is behind other projects like Battersea Roof Gardens, Wembley Stadium, and will be designing the national memorial to Queen Elizabeth II. In May of this year, two US based firms, Bechtel and Parsons were awarded key contracts for the expansion, according to ENR. It will have plenty of seating, indoor and outside places with lots of greenery and huge glass windows for plane watching. The airport design has been specially-made to create a "seamless customer journey", revealed in a statement from the Saudi Press Agency. 5 It will be in a loop design to create a seamless passenger journey Credit: Foster + Partners 5 The renders show lots of open green spaces around the airport Credit: Foster + Partners Currently, Brits can fly directly from London to Riyadh Airport with an average flight time being six hours and 42 minutes. It wouldn't be surprising if these continue, or even if the number of flights increase to the city as a result of the new airport opening. The airport expansion forms part of the Saudi Vision 2030 plan to transform the country. Qiddiya, an entertainment city, is also in the plans and it is currently scheduled to open later this year. It will have a Six Flags theme park, and enormous waterpark with submersible cars and four record-breaking rides - including the world's tallest water coaster. For thrill-seekers, it will have the largest drop body slide, the tallest water slide and the longest mat racer too. This mega £2.7billion airport reveals 24-hour terminal that will 'rival London's Heathrow' with UK flights. Plus, the abandoned UK airport will reopen its doors after a decade in £500m revamp – and could offer Ryanair & easyJet flights.