logo
From recovery to resilience – acting electricity DG Pillay charts a bold vision to 2050

From recovery to resilience – acting electricity DG Pillay charts a bold vision to 2050

Daily Maverick08-05-2025
In an address that signalled a significant and welcome shift in tone and substance in South Africa's energy discourse, acting Director-General at the Ministry of Energy and Electricity Subesh Pillay called for structural transformation in the country's electricity and energy planning regime.
Speaking under the theme, Policy and Planning Considerations for Energy and Electricity in South Africa in the Years to 2050, acting Energy and Electricity DG Subesh Pillay opened the EE Business Intelligence webinar on Wednesday, 7 May 2025 by saying the country now stood at a strategic inflection point.
'We gather not in the shadow of crisis,' he said, 'but at a rare moment of inflection – one where signs of operational recovery offer us the space to shift our gaze beyond the immediate.'
He cited Eskom's latest Winter 2025 Outlook as evidence of this shift. Notably, South Africa experienced nine months of uninterrupted power supply from July 2024 to March 2025. Unplanned generation losses dropped from more than 18GW in early 2023 to less than 13GW by April 2025, and energy availability has climbed to 61%, with a trajectory toward a target of 70%.
Crucially, these gains were not driven by diesel overuse, but by structural improvements, including the return to service of a number of large Eskom generator units together with public and private sector renewable energy procurements.
Pillay made it clear that the time for reactive management was over.
'We now have the opportunity, responsibility and indeed the obligation, to reposition our planning focus – not simply to avoid load shedding, but to power inclusive growth, industrial expansion and climate resilience.'
Beyond technical fixes – addressing structural fragmentation
Tracing the roots of South Africa's systemic energy fragility, Pillay criticised the past two decades of underinvestment, misalignment between policy and execution and governance inertia. Deferred updates to the Integrated Resource Plan (IRP), a long-stalled Integrated Energy Plan (IEP) and fragmented institutional mandates left the country overexposed to breakdowns and unprepared for decentralised energy realities.
Yet, the address was not solely diagnostic. Pillay acknowledged recent progress, indicating his view that the Draft IRP 2025 now integrated industrial and spatial planning more closely, and the Gas Master Plan – said to be in an advanced stage of preparation – aimed to address the looming 'gas cliff' while fostering regional integration.
Still, he warned, 'Until the IEP is finalised and the various planning instruments are nested under a common strategic umbrella, the risk of fragmentation remains.'
A sector redefined – unbundling, competition and market redesign
Pillay also highlighted South Africa's electricity market transformation, driven by Eskom's unbundling and the operationalisation of the National Transmission Company of South Africa (NTCSA). This, along with the National Energy Regulator of South Africa's new Grid Access Rules and the Electricity Regulation Amendment Act, signals a shift toward competitive markets.
'This is a fundamentally new planning and market environment,' he said. Drawing lessons from countries like Vietnam and Chile, he called for a 'whole-system approach' integrating generation, transmission, embedded supply and storage, with robust coordination across national, municipal and regional levels.
Planning with purpose – five lenses to 2050
To shape a future-ready energy system, Pillay laid out five core planning lenses:
Energy security as a developmental imperative: A resilient mix of renewables, gas, clean coal, nuclear and storage – including regional projects like the Mozambique-South Africa gas pipeline.
Decarbonisation without destabilisation: Emphasising carbon capture, small modular reactors (SMRs) and green hydrogen, while sequencing coal retirements alongside industrial repurposing.
A fit-for-purpose distribution system: With more than R15-billion lost annually in municipal distribution inefficiencies, he called for electricity distribution industry (EDI) restructuring and readiness for rooftop solar, microgrids and bidirectional power flows.
Flexibility, technology and digitalisation: Expanding smart grids, real-time digital dispatch and Eskom's Virtual Wheeling platform, while stabilising grid performance with new technologies.
Planning as an industrial lever: Tying energy to new industries – green hydrogen, battery minerals and local manufacturing – while driving socioeconomic inclusion and asserting South Africa's leadership in global forums.
Institutions to match ambitions
However, Pillay cautioned that robust modelling meant little without institutional delivery. He outlined three foundational governance imperatives:
Policy certainty and regulatory clarity: Clear rules under the ERA Act, aligned procurement tools and synchronised planning frameworks.
A capable and coordinated state: Enhanced local capacity, improved alignment among Eskom, Independent Power Producers, municipalities and regulators.
Institutionalising planning: Embedding scenario analysis, social inclusion and learning processes within dynamic planning functions.
Energy planning as nation building
Pillay closed his address by reframing energy planning as more than a technocratic duty – it was, he asserted, 'a nation-building endeavour.' He stressed that the decisions made today would either entrench inequality or catalyse opportunity; lock in fragility or build resilience.
'As we look toward 2050,' he concluded, 'may this webinar not only interrogate models and assumptions, but also challenge institutions, expand inclusion and catalyse the leadership required to deliver the energy future that South Africa and Africa deserves.'
The address sets a bold new tone for what is likely to be a highly contested yet pivotal planning period for South Africa's energy sector – one that demands not just recovery, but systemic reinvention. DM
Chris Yelland is managing director, EE Business Intelligence.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Seconded municipal manager promises turnaround for yroubled Endumeni
Seconded municipal manager promises turnaround for yroubled Endumeni

The Citizen

time21 hours ago

  • The Citizen

Seconded municipal manager promises turnaround for yroubled Endumeni

Endumeni Municipality's new municipal manager, Advocate Nontebeko Khambule, says a 'fresh page' is being turned for the debt-ridden municipality, which owes Eskom over R300 million. Speaking at an Endumeni Chamber of Business meeting, Khambule described the number of empty shops in Dundee as 'disturbing' and stressed the urgent need for infrastructure upgrades. 'We must work with the Chamber of Business and community groups to stimulate growth and improve collections,' he said. He also reaffirmed his commitment to 'getting the basics right' — fixing potholes, restoring streetlights, and clearing storm-water drains — using municipal staff instead of costly tenders. Technical manager Mondli Buthelezi said 10,000 meters had been audited ahead of a roll-out of tamper-free smart meters. He confirmed that commercial users, not households, will face seasonal electricity tariffs in winter to align with Eskom charges. He warned that old electrical infrastructure is a major cause of outages. Finance manager Bonga Mkhize highlighted the R550 million unfunded budget and illegal connections as major challenges, despite a 92% collection rate. Endumeni Residents Association's Willie Steenberg welcomed the frank approach but noted that local rates remain higher than in other Northern KZN towns. Chamber president Alan Schonken urged stricter bylaw enforcement to curb illegal trading, public drinking, and pavement blockages. Khambule acknowledged the concerns and said that with a new management team in place, a turnaround is possible if all stakeholders work together. HAVE YOUR SAY: Like our Facebook page, follow us on Twitter and Instagram or email us at [email protected]. Add us on WhatsApp 071 277 1394

Over 100,000 homes in KwaZulu-Natal lack electricity access
Over 100,000 homes in KwaZulu-Natal lack electricity access

IOL News

timea day ago

  • IOL News

Over 100,000 homes in KwaZulu-Natal lack electricity access

KZN Cooperative Governance and Traditional Affairs MEC, Reverend Thulasizwe Buthelezi Image: Supplied by KZN Cooperative Governance and Traditional Affairs MORE than 100,000 homes across KwaZulu-Natal still do not have access to electricity. KwaZulu-Natal MEC of Cooperative Governance and Traditional Affairs Thulasizwe Buthelezi revealed that in some parts of the province, there is still very low penetration when it comes to the provision of electricity. The MEC was speaking at an event for Eskom's National Transmission Company South Africa (NTCSA) Indaba this week. 'According to the Department of Mineral Resources' Electrification Master Plan, which provides a detailed breakdown of electrification backlogs per local municipality at ward level, there were 112,704 households without access to electricity as of the end of March 2023. An estimated R2.25 billion is required to address this backlog,' he said in a statement. The department confirmed on Thursday that these figures were referring to KwaZulu-Natal. The MEC stated, 'UMkhanyakude District Municipality in the far north of the province has the lowest electricity access ratio at 84.37%, followed by uGu District Municipality on the south coast at 89.02%, while all other district municipalities are above 90%.' Video Player is loading. Play Video Play Unmute Current Time 0:00 / Duration -:- Loaded : 0% Stream Type LIVE Seek to live, currently behind live LIVE Remaining Time - 0:00 This is a modal window. Beginning of dialog window. Escape will cancel and close the window. Text Color White Black Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan Transparency Transparent Semi-Transparent Opaque Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps Reset restore all settings to the default values Done Close Modal Dialog End of dialog window. Advertisement Next Stay Close ✕ Ad loading 'To reduce the electrification backlog, municipalities were allocated a total of R359.7 million under Schedule 5B for infrastructure and electrification of 7,421 households in the 2024/25 financial year. Eskom's allocation for household electrification in the same period is R209.1 million, targeting 10,002 new connections. Given uMkhanyakude's high backlog, significant funding was allocated to the district, aiming to connect 4,462 households. 'While these are positive improvements in the mission to increase the number of households with access to electricity, we are aware of challenges that often delay electrification projects. Common issues include the demands for 30% subcontracting to local SMMEs, which sometimes lead to disputes if they are not properly managed. At times, there are also upfront payment demands from contractors; we have also been made aware of these issues. 'Community unrest, due to the limited scope of work, is also contributing to the delays. Last month, in Vryheid, under Abaqulusi Local Municipality, a community protested and threatened to stop the project in the nearby ward because they felt like they were left out. However, we understand that electrification projects are implemented in phases. There is also poor terrain and inadequate access in some rural areas, causing cost overruns. Additionally, there is resistance to removing illegal infrastructure even when permanent connections are ready. 'Our province's population is expected to grow in the coming years due to urbanisation and new developments that are emerging in different parts. To meet future energy demands, transmission projects have been planned and are being implemented by Eskom in phases to ensure a sustainable supply and support economic growth,' said the MEC. Buthelezi added that the transmission load forecast indicates that KZN's consumption will increase from just below 6 gigawatts (GW) in 2023 to 7 GW in 2032, an average annual growth rate of 1.58%. He said some bulk projects have been delayed by labour unrest, but through Cogta's intervention, including war room meetings with stakeholders, significant progress has been made in this regard. The MEC said currently, there are major schemes that have been commissioned in the province as a precautionary measure to ensure a sustainable energy supply in KwaZulu-Natal. Eskom Middle Manager: Project Portfolio, Krish Govender, speaking of the importance of the gathering, said it was aimed at fostering more effective collaboration between the NTCSA, Eskom Holdings, government and entities. 'Reinforce our collective resolve to execute projects safely, efficiently, and with the highest standards of compliance - always in the best interest of the communities we serve.' THE MERCURY

Eskom moves forward with Duynefontein nuclear power project amidst environmental concerns
Eskom moves forward with Duynefontein nuclear power project amidst environmental concerns

IOL News

timea day ago

  • IOL News

Eskom moves forward with Duynefontein nuclear power project amidst environmental concerns

With the anticipated new Integrated Resource Plan (IRP) set to be released soon, Eskom stated its intention to maximise the capacity permitted under this new framework, potentially adding an extra 4 000 megawatts (MW) to the site. Image: File/Dean Hutton Banele Ginidza Eskom has announced plans to deploy Large Conventional Nuclear Power Reactor (PWR) units at the Duynefontein Nuclear Plant, a critical step forward following the Department of Forestry, Fisheries, and the Environment's (DFFE) recent decision to allow this development. With the anticipated new Integrated Resource Plan (IRP) set to be released soon, Eskom stated its intention to maximise the capacity permitted under this new framework, potentially adding an extra 4 000 megawatts (MW) to the site. This plan follows a tumultuous period surrounding previous nuclear procurement strategies, notably when Electricity and Energy Minister Kgosientso Ramokgopa withdrew a Ministerial determination to procure 2 500MW of new nuclear capacity after widespread public consultation concerns. The ensuing legal challenges led to the determination's revocation, highlighting the necessity for transparent dialogues around sensitive energy projects. Eskom on Thursday clarified that any deployment of nuclear power will align with the forthcoming IRP and Section 34 determination to be issued by the Department of Electricity and Energy (DEE), taking into account significant regulatory changes that have unfolded in recent years. "The previous Section 34 determination allocated the Department of Mineral Resources and Energy (now the DEE) as the Procurer. This determination has since been withdrawn by the DEE Minister. Once the new IRP and new Section 34 are issued, DEE and/or Eskom will determine the funding options for the Nuclear Programme," Eskom said. "This Environmental Assessment (EA) allows an additional 4 000MW to be deployed on the Duynefontein site. The capacity to be deployed on the site will depend on the nuclear power capacity allocated in the new IRP." However, the announcement hasn't gone without criticism. Video Player is loading. Play Video Play Unmute Current Time 0:00 / Duration -:- Loaded : 0% Stream Type LIVE Seek to live, currently behind live LIVE Remaining Time - 0:00 This is a modal window. Beginning of dialog window. Escape will cancel and close the window. Text Color White Black Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan Transparency Transparent Semi-Transparent Opaque Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps Reset restore all settings to the default values Done Close Modal Dialog End of dialog window. Advertisement Next Stay Close ✕ Environmental advocates, including the Koeberg Alert Alliance (KAA), have raised grave concerns regarding the outdated nature of the Environmental Impact Assessment (EIA) process, initiated in 2007. According to KAA's spokesperson, Peter Becker, significant changes in population density and the economic viability of alternative energy sources necessitate a reassessment of Duynefontein as a suitable nuclear site. "It is of note that the EIA consultants found that Duynefontein (Koeberg) was not the best site for a new plant, due to seismic risks and population density in the area," Becker said. "It appears the Department of Forestry, Fisheries and the Environment has been pressured to override the consultants' view due to economic factors. It is of course far cheaper to build a new plant where there is already existing infrastructure." However, Eskom rebuffed these claims, asserting that the EIA indicated that both Thyspunt and Duynefontein were appropriate sites, with Thyspunt suggested as the preferred location. Des Muller, managing director of NuEnergy Developments, said both Duynefontein and Thyspunt were sound sites to build large-scale nuclear power plants on. "These sites are both licensed for 4 000MW but, in the short-term, only two power plants will be built on these sites, leaving ample capacity for Small Modular Reactors (SMR)," Muller said. "Because they don't need the ocean to cool them, SMRs can be built anywhere and closer to the industrial load centres in our country. SMRs are also ideal to repurpose our retired coal power stations and keep those communities sustained and contributing to our economy." Muller also said that given South Africa's old coal power retirement program in the 2030s, both sites will have to be developed, converting these regions to net exporters of clean, reliable and affordable electricity. "These regions will also experience economic prosperity during the build and the 60 years of operation and maintenance, as well as from the energy security they will enjoy," Muller said. BUSINESS REPORT

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store