
Mumbai: MHADA cuts RR charges for additional area for tenants of old cessed buildings
NEW DELHI: Eligible original tenants and residents listed in the
Mumbai
Building Repairs and Reconstruction Board's (MBRRB) master list will now be charged only 100% of the ready reckoner rate, instead of the earlier 110%, for the additional area allotted beyond the permissible or original area of their old residential units, said
Sanjeev Jaiswal
, vice president and CEO of
MHADA
.
This relief will be applied retrospectively to beneficiaries declared eligible in the December 2023 lottery. Jaiswal has directed that a new policy framework be finalized by April 28, 2025.
Jaiswal said, "In many old and dangerous buildings, only the upper floors are demolished, leaving ground floor tenants in uncertainty. These residents were not previously regarded as eligible. We are going to change that; tenants on the ground floor will now be listed on the Master List and will also get the compensation they are due."
MHADA is currently conducting a biometric survey of transit camp residents in order to categorize them into Categories A, B, and C in accordance with the Government Resolution dated September 13, 2019.
MHADA CEO ordered that residents of Category A, whose original building cannot be rebuilt, be given preference when it comes to being added to the Master List. Furthermore, he directed that if the redevelopment of dangerous cessed buildings is stalled, tenants/residents should be offered the option to be added to the master list. This includes those living in buildings acquired by MHADA post-Notice under Section 91(A).
Jaiswal also instructed the concerned departments to hold a new lottery within six months to determine eligibility and allot permanent homes to 100 tenants/residents from old cessed buildings.
The December 2023 lottery was organised in five categories based on tenement size: 91 tenements of 401–500 sq ft, 28 tenements of 300–316 sq ft, seven tenements of 501–601 sq ft, one tenement of 701–753 sq ft, and 125 tenements of 301–500 sq ft. MHADA will hold a 10-day special camp to issue allotment letters to successful beneficiaries.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
2 days ago
- Indian Express
MHADA extends amnesty scheme for housing societies awaiting occupancy certificates until December 31
In a huge relief to housing societies that are waiting for occupancy certificates, the Maharashtra Housing and Area Development Authority (MHADA) has also extended the time for its two current special amnesty schemes until December 31, 2025. The extension, sanctioned under the supervision of MHADA's vice-president and CEO Sanjeev Jaiswal is likely to benefit almost 80 housing societies in Mumbai. The extension is for two schemes: one for issuing occupancy certificates (OC) to redeveloped buildings under the 1991 Development Control Regulations (DCR), and another for waiving interest on additional premium amounts charged during redevelopment under MHADA's jurisdiction. According to Authority Resolution No. 6260, MHADA's Mumbai Board will continue to waive interest on pending additional premiums levied on housing societies. These societies will now pay only the principal amount, relieving the financial burden that has slowed the granting of occupancy certificates for most projects. At the same time, the Building Permission Cell is also offering an amnesty scheme for buildings redeveloped under DCR 1991. The scheme gives a 'concession' of up to 75 per cent on penalty charges imposed for unauthorised use of rooms like enclosed flowerbeds or balconies and minor variations from approved plans. It will be applicable to buildings that took building permissions under DCR 1991 till November 12, 2018. Several societies were issued No-Objection Certificates (NOC) or Letters of Intent (LoI) between 29 July 2004 and 4 June 2007 and were subsequently requested to pay extra premiums, but on account of non-payment, their occupancy certificates are pending. Consequently, people occupying these societies have been faced with increased utility bills, tax dues, and inconveniences in the sale or transfer of the flat. 'While physically, the majority of buildings have been completed and are transferred to the societies by developers, the financial liability of outstanding premium payments has stayed with the societies as well as members. The interest waiver scheme now provides them with a realistic route to regularisation,' a MHADA spokesperson said. Where building plans have been changed above approved limits, a 75 per cent concession on penalty is permissible under the amnesty scheme, subject to recovery of fees on revised plans.


News18
4 days ago
- News18
MHADA To Give Rs 20,000 Monthly Rent To Tenants Of 96 Unsafe Cessed Buildings In Mumbai
Along with this, MHADA will also lease 400 small flats through private agencies to serve as temporary homes for affected families. In big relief for hundreds of families living in crumbling old buildings across Mumbai, the Mumbai Building Repairs and Reconstruction Board (MBRRB), a part of MHADA, has rolled out a support plan just ahead of the monsoon. After its routine pre-monsoon inspection, the Board has identified 96 cessed buildings as extremely unsafe to live in. Nearly 2,400 tenants and residents currently stay in these buildings, many of which are in poor condition and pose serious risk during heavy rains. To help them move to safer places, MHADA will give Rs 20,000 per month to residents who find their own alternate accommodation. This financial support aims to ease the immediate stress of relocating from homes that are no longer safe. Along with this, MHADA will also lease 400 small flats through private agencies to serve as temporary homes for affected families. These transit tenements, sized between 180 to 250 square feet, will be available on rent for three years. MHADA Vice President and CEO Sanjeev Jaiswal (IAS) has asked the Board to float public advertisements inviting private landlords to provide these flats. Currently, the Board has just 786 vacant transit homes, which is far from enough for all those who need urgent relocation. The decision to rent more units and provide rent money is part of a quick action plan to protect residents before the monsoon worsens. Notably, the full cost of this support — both the monthly rent and rental homes — will be recovered from the private developers or housing societies handling the redevelopment of these buildings. This includes rent, maintenance, and all other charges, starting from the date families receive this support. Mumbai has around 13,091 cessed buildings, many of which are decades old and face regular repair and safety issues. MBRRB currently manages 20,591 transit homes to house people evacuated due to structural repairs, collapses, demolition for road work, or rebuilding of narrow-plot structures. With this timely decision, MHADA hopes to protect vulnerable residents and make sure they are not left without shelter during the tough monsoon season. The Board has urged residents of these dangerous buildings to act quickly and cooperate with officials so that everyone can be moved to safer places without delay. First Published: June 05, 2025, 11:00 IST
&w=3840&q=100)

Business Standard
6 days ago
- Business Standard
Maharashtra allows disciplinary notices via email, WhatsApp in digital push
The Maharashtra government, through an official notification, directed that in cases of indiscipline by any government employee or officer, notices for action and other necessary documents should be served to the concerned employee via email and WhatsApp. The government permitted disciplinary notices to be sent via email and WhatsApp, alongside the existing registered post method. The move aimed to streamline administrative communication and accelerate official procedures, particularly in cases of misconduct or disciplinary action against government employees or officers. The General Administration Department (GAD) issued the official circular yesterday, stating that digital platforms can now be used to send notices, related documentation, and other official communication in cases of government disciplinary proceedings. The circular stated, "In case of any official indiscipline by any government employee or officer, notice for action and other necessary documentation can be sent to the concerned employee via email and WhatsApp." However, the traditional practice of serving notices through registered post has not been discontinued. The circular added that notices will also be served via registered post, making it a dual-mode delivery system to ensure the communication reaches the recipient effectively. This decision came in the backdrop of the government's larger vision of administrative reform and development under "Developed Maharashtra - 2047," a part of India's broader vision of becoming a developed nation by 2047. As part of this mission, the Maharashtra government launched an extensive 150-day programme from May 6 to October 2, 2025, aimed at finalising a comprehensive Vision Document for Maharashtra's growth. The initiative aligned with national goals, such as a $5 trillion economy by 2025-26, while also setting state-specific targets for infrastructure, agriculture, industry, education, health, and urban development. To prepare this Vision Document, the state appointed sectoral groups, coordinators, and external experts across 16 departments, including agriculture, education, health, environment, and urban planning. The government also planned state-wide surveys to gather citizens' feedback and aspirations for Maharashtra's future. The Vision Document will be finalised by October 2, 2025, and will lay down short-term, medium-term, and long-term developmental goals up to 2047, marking India's centenary of independence. Meanwhile, the Planning Department of Maharashtra, led by Chief Minister Devendra Fadnavis, issued a Government Resolution (GR) asking all state departments to prepare a vision document titled "Developed Maharashtra 2047." This will be on the lines of the Union Government's scheme of Viksit Bharat 2047 as outlined by Prime Minister Narendra Modi. Chief Minister Devendra Fadnavis has set 150 days from May 6 to October 2 to prepare the document, which will primarily focus on a phase-wise vision. The first phase includes a long-term vision or plan for developing Maharashtra by 2047. The midterm phase includes vision or plans to prepare a plan for Maharashtra 2035, when the state will complete its 75 years of its foundation. The third phase includes a short-term plan to prepare a vision document for October 2029, when the present government will complete its five-year term.