
Coal India to invest Rs 1,067 crore in Talcher Fertilizers
Coal India Ltd (CIL) will invest over Rs 1,067 crore in Talcher Fertilizers Ltd (TFL) by acquiring shares through a rights issue. This investment aims to revive FCIL's fertilizer unit in Odisha via a coal gasification-based plant. The project, currently 65.66% complete, faced delays due to pandemic-related disruptions and is now undergoing regular reviews to address pending issues.
Tired of too many ads?
Remove Ads
Tired of too many ads?
Remove Ads
State-owned CIL on Friday said it will invest a little over Rs 1,067 crore in Talcher Fertilizers Ltd by way of acquiring shares through rights issue.Talcher Fertilizers Ltd was incorporated in 2015 as a joint venture company of GAIL (India) Ltd, Coal India Ltd (CIL), Rashtriya Chemicals & Fertilizers Ltd ( RCF ) and Fertilizer Corporation of India Limited ( FCIL ) for revival of FCIL's Fertilizer unit by setting up a coal gasification based fertilizer plant at Talcher, Odisha.GAIL (India), CIL and RCF each holds 33.333 per cent in Talcher Fertilizers.In a filing to BSE, CIL said it will acquire 1,06,75,06,771 equity shares at a face value of Rs 10 each. The transaction is likely to be completed by July 9.Coal India accounts for over 80 per cent of domestic coal production.Talcher Fertilizers Ltd project, India's first coal gasification-based ammonia urea plant with a planned capacity of 12.7 lakh tonne per annum, has struggled to maintain its timeline since contracts were awarded to China's Wuhuan Engineering Company Ltd (WECL) in September 2019.As of February 28, 2025, the overall project completion stands at 65.66 per cent, with Outside Battery Limit (OSBL) packages reaching 77.62 per cent completion, Minister of State for Chemicals and Fertilisers Anupriya Patel had informed the Lok Sabha.Several OSBL components, including pipe rack, plant lighting, Boiler-1, raw water treatment plant, and DM water plant, have reached advanced stages of mechanical completion, she said.The project, initially targeted for commissioning in September 2024, has missed its deadline due to pandemic-related disruptions that began when COVID-19 emerged in December 2019 in Wuhan, the headquarters of the main contractor.Joint venture partners and the TFL board are conducting regular reviews of the project's progress, while TFL maintains frequent video conferences with WECL to resolve pending engineering issues, the minister added.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
30 minutes ago
- Time of India
Tata Harrier EV launched with AWD, 622 km range: Prices, details
Tata Harrier EV launched with AWD, 622 km range. Tata Motors has launched the all-wheel-drive version of its flagship electric SUV , the Harrier EV, in India. Priced at Rs 28.99 lakh, ex-showroom, this top-spec variant is currently the most premium offering from the homegrown carmaker. The base RWD variant starts from Rs 21.49 lakh, ex-showroom, with introductory prices valid for a limited period. Tata Harrier EV AWD launch: All you need to know Powering the Harrier EV AWD is a 75kWh battery pack , paired with two electric motors, one on each axle. These motors generate a combined output of 313 hp and 504 Nm of torque. As for the range, the company claims up to 622 km on a single charge for the AWD variant. Meanwhile, the RWD variants with the same battery deliver a slightly higher claimed range of 627km. Tata Harrier EV Deep Dive ft. Anand Kulkarni | Battery Tech, AWD & More by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Aparat de sudură cu laser de 9000 W (4 în 1) – o revoluție în sudură! Află mai multe Undo The EV is also offered with a smaller 65kWh battery pack in lower variants, paired with a single rear motor. This version delivers 238hp and 315Nm, with a claimed range of up to 538km on a full charge. In terms of performance and capability, the Harrier EV AWD variant features a Boost Mode, Off-Road Assist, and six terrain modes:Normal, Snow/Grass, Mud-Ruts, Sand, Rock Crawl, and Custom. It also boasts safety and tech features like a 360-degree camera, transparent bonnet view, 7 airbags, Level 2 ADAS with 20+ functions, and a recently bagged 5-star BNCAP crash test rating (32/32 for adult and 45/49 for child safety). Charging options are versatile too. The Harrier EV supports 120kW DC fast charging , adding up to 250 km of range in just 15 minutes. A 20–80% top-up can be achieved in about 25 minutes. For home use, customers can opt for either 3.3 kW or 7.2 kW AC chargers. Stay tuned to TOI Auto for latest updates on the automotive sector and do follow us our social media handles on Facebook, Instagram and X. Discover everything about the automotive world at Times of India .


Time of India
34 minutes ago
- Time of India
Slice Small Finance Bank turns profitable on monthly basis; targets IPO in 3–4 years
Synopsis North East Small Finance Bank had reported a Rs 441 crore loss in FY24. Slice was also in losses at a consolidated level. But as a bank, the company hopes to run profitably through FY26.


News18
an hour ago
- News18
Mumbai Tenant Asks Why Landlords Treat ‘Deposit Like A Personal Bonus Fund?'
The Redditor has filed a First Information Report (FIR) against the landlord. A Reddit user shared their experience dealing with a landlord in Navi Mumbai after vacating a rented flat four months into a one-year agreement. Despite following all terms and maintaining the flat well, they are now struggling to recover the full security deposit. In a post titled, 'Are all Mumbai landlords crackheads?," the user explained that they had signed a one-year rental agreement for a flat in Navi Mumbai but had to move out after four months due to personal reasons. 'So here's the deal. I had rented a flat in Navi Mumbai and signed a 1-year agreement. But due to some personal reasons, I had to move out after 4 months. There was no lock-in period mentioned in the agreement, so I followed the rules and gave a proper 1-month notice, as required," the user wrote. The user didn't just leave, they took care to return the flat in excellent shape. 'Before moving out, I even made sure to get the place professionally deep cleaned and repainted any walls that needed touch-ups," they explained. This was done 'just to hand the flat back in the best condition possible, the same way I received it." They had paid Rs 40,000 as a security deposit. But after vacating, only Rs 20,000 was returned. The user wrote, 'Now here comes the circus. I had paid Rs 40,000 as a security deposit when I moved in. After vacating, I've been politely and repeatedly following up for over a month, and this guy has only returned Rs 20,000 so far." When they asked for the remaining Rs 20,000, the landlord gave what the user called 'the wildest excuses." He said he had to pay Rs 10,000 to a new broker and that his previous broker didn't refund him the earlier brokerage. 'So I'm expected to cover his losses. Like… what??" the user said. 'Honestly, the way some landlords here operate is mind-boggling. They treat the deposit like it's their personal bonus fund. And after that his audacity to send me a emoji on serious text," the user concluded. They also attached screenshots of their WhatsApp conversation with the landlord over the security deposit. The post gained significant attention and in the comments section many people shared their opinions. One user commented, 'If there was no lock in period in agreement he cannot penalise you post-facto." Another shared, 'I swear to God, dealing with owners for deposit is just crazy and frustrating AF. I gave notice as part of the agreement but still after a month not yet received the deposit. I hate dealing with these entitled**." 'Most landlords in Mumbai are obnoxious and extremely difficult to deal with. They usually have ties with the brokers. This scammy combo is always on the lookout to scam the tenant," someone said. A person pointed out, 'Kindly read your rent agreement once and check what it says, if there is a lock-in of 6 months, and it is explicitly mentioned what happens if you leave before 6 months, he has all the rights to keep the deposit…and if it wasn't mentioned then you are liable to get it back. Now in general if I am renting out my property I would keep 6 months locked-in ..and if the tenant stay is purely short term, I would inflate the rent by 10-15 per cent." The user also mentioned that they have filed a First Information Report (FIR) against the landlord and will also send a legal notice through their lawyer friend. News18's viral page features trending stories, videos, and memes, covering quirky incidents, social media buzz from india and around the world, Also Download the News18 App to stay updated! tags : mumbai rent viral news Location : Delhi, India, India First Published: June 28, 2025, 11:11 IST News viral Mumbai Tenant Asks Why Landlords Treat 'Deposit Like A Personal Bonus Fund?'