logo
National Training Centre construction in Putrajaya 50 days ahead of schedule, says FAM

National Training Centre construction in Putrajaya 50 days ahead of schedule, says FAM

Malay Maila day ago

KUALA LUMPUR, June 26 — The construction of the National Training Centre (NTC) in Precinct 5, Putrajaya is progressing according to the original schedule and is expected to be completed without any delay.
Football Association of Malaysia (FAM) secretary-general Datuk Noor Azman Rahman said the project, which is divided into Phase One and Two, is still ahead of schedule by 50 days.
He said the two pitches, namely natural grass (bermuda) and hybrid in Phase One, are expected to be completed this year while the artificial turf and several other important facilities will follow in Phase Two.
'Actually, this project is ahead of the original schedule by 50 days as a result of close cooperation from all parties. For Phase One, the two pitches may be completed between September and October.
'For Phase 2, the facilities as issued by the Public Works Department (JKR) will be announced in mid-July. For the artificial turf, the roof construction needs to start first,' he said when contacted by Bernama today.
Earlier, FAM today shared the latest photos of NTC construction site in conjunction with the one-year anniversary of the project's groundbreaking ceremony on June 26, 2024.
Phase One of NTC includes a football field with different types of grass, that is also fully equipped with floodlights as well as a quality drainage system, landscaping and a six-metre (m) high fence around the field area, which is expected to be completed in December 2026.
The project will be followed by Phase Two involving the construction of the artificial turf, a 1,682.8 square metre building that includes a gymnasium, multipurpose room, players' changing rooms, rehabilitation room and surau, in addition to the construction of the roof for the artificial turf.
Phase Two is expected to be fully completed in December 2027.
Located near the Putrajaya Equestrian Park, NTC is built on a 5.2-hectare site with Phase One of the project using funds from the International Federation of Association Football (Fifa) totalling US$5.2 million (approximately RM24 million) while Phase Two is using an allocation of RM45 million from the Malaysian Government through the Ministry of Youth and Sports. — Bernama

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Singapore tycoon Peter Lim and son Kiat drive Valencia's €322m stadium push with 2027 opening set
Singapore tycoon Peter Lim and son Kiat drive Valencia's €322m stadium push with 2027 opening set

Malay Mail

time4 hours ago

  • Malay Mail

Singapore tycoon Peter Lim and son Kiat drive Valencia's €322m stadium push with 2027 opening set

SINGAPORE, June 27 — Singapore tycoon Peter Lim is not stepping away from Valencia CF, as the Spanish football club announced it has secured €322 million (RM1.6 billion) in financing to complete its long-delayed new stadium, the Nou Mestalla. Scheduled to open in 2027, the 70,044-seat stadium will be Spain's fourth largest, behind the redeveloped Nou Camp, Santiago Bernabeu, and Metropolitano Stadium, according to a report in The Straits Times today. Valencia president Kiat Lim, Peter Lim's son, hailed the financing as a 'historic milestone', saying it would enable the club to deliver a 'world-class stadium' and reflects growing global investor confidence in the club. The financing includes a €237 million note issuance with a 28-year maturity and an €85 million five-year loan, which will be repaid using proceeds from the sale of the current Mestalla site. 'This new stadium is a game-changer — in revenue potential and fan experience,' said Kiat, who took over as president in March. Valencia president Kiat Lim, Peter Lim's son, hailed the financing as a 'historic milestone', saying it would enable the club to deliver a 'world-class stadium' and reflects growing global investor confidence in the club. — Picture from social media Valencia have played at the ageing Mestalla since 1923; construction of the new stadium began in 2007 but was halted in 2009 due to financial troubles, years before Peter Lim rescued the club from bankruptcy in 2014. Despite recent on-pitch struggles, Valencia still drew strong home crowds, averaging over 43,000 fans per game last season, with season ticket holders filling 90 per cent of seats. The Nou Mestalla will offer 6,500 hospitality seats, compared to fewer than 500 at the current ground, and is expected to more than triple the club's revenue through expanded hospitality, naming rights, and year-round events. The club also envisions the stadium becoming a multifunctional venue hosting entertainment, business, and leisure activities, helping transform it into a regional hub. Kiat said the venue will operate '365 days a year' and match the club's long-term vision, describing the project as more than just a stadium, but the 'future of Valencia CF'. Peter Lim's Meriton Holdings has committed over €200 million to the club, the most by a single investor in La Liga history, keeping Valencia financially stable and able to fund major projects like this. The stadium financing follows a corporate refinancing completed in November 2024, in which the club consolidated €186 million of debt, further strengthening its financial position.

Mbappe accuses PSG of harassment, French prosecutors open investigation
Mbappe accuses PSG of harassment, French prosecutors open investigation

Malay Mail

time6 hours ago

  • Malay Mail

Mbappe accuses PSG of harassment, French prosecutors open investigation

PARIS, June 27 — Kylian Mbappe has accused his former club Paris Saint-Germain of moral harassment in a legal filing, the Paris prosecutor's office told AFP on Thursday as it confirmed an investigation had been opened. France captain Mbappe is also embroiled in a court battle with PSG to obtain the €55 million (RM272 million) in unpaid wages and bonuses he says the club owes him. Mbappe's latest grievance is related to the way he was treated by PSG at the start of the 2023-24 season, when he was made to train with players the club were trying to offload. He believes he was sidelined by the club after refusing to agree a new contract, a practice which has also affected other footballers and prompted the French players' union to lodge a complaint last year. Mbappe was not invited to a 2023 pre-season tour of Asia and missed the first game of that season but was later restored to the team after holding talks with the club. The 26-year-old joined Real Madrid last summer after seven seasons with PSG. He scored 256 goals in 308 games for the French club, who won the Champions League last month for the first time following the striker's departure. — AFP

WCGC Malaysia 2025: Full field competes at Tropicana as top teams qualify for national final
WCGC Malaysia 2025: Full field competes at Tropicana as top teams qualify for national final

Malay Mail

time6 hours ago

  • Malay Mail

WCGC Malaysia 2025: Full field competes at Tropicana as top teams qualify for national final

KUALA LUMPUR, June 24 — The second qualifying round of the World Corporate Golf Challenge (WCGC) Malaysia attracted a full field of 124 corporate participants at Tropicana Golf & Country Club, underlining the event's growing popularity. The tournament brought together business leaders and professionals for a day of competitive golf and networking in a relaxed setting. Five teams advanced to the national final in September at Kota Permai Golf & Country Club, with Tay Cher Haw and Liew Vin Sern of Seng Haw Timber Sdn Bhd emerging top with a 49-point Stableford score. Close behind were MG Synergy's Mohd Azmi Mahmud and Azhar Husain with 46 points, while third place was decided on countback between Widad Skycore and Feyyaz Sports Group, both with 45 points. Also qualifying for the final were Muhammad Firdaus Hj Said and Mohd Azwan of Sinar Jernih Sdn Bhd, who matched the 45-point mark. ENOTECH led the list of title sponsors, supported by major sponsors including Konsortium Jaringan Selangor, Spectrum Outdoor and Cuckoo Malaysia. Ancom Nylex Berhad was among the co-sponsors contributing to the event's success, alongside CelcomDigi, Skechers GoGolf, Avant Aegis and others. The national winner will go on to represent Malaysia at the WCGC World Final in Shanghai this October, as the tournament continues with its third qualifying round at Glenmarie on July 22. * Editor's note: An earlier version erroneously listed the year as 2024 in the headline and has since been corrected.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store