logo
Accessibility scheme completed at railway station

Accessibility scheme completed at railway station

Yahoo01-05-2025

A £6.2m accessibility scheme has been completed at a railway station in Surrey.
Two new lifts and new footbridge have been installed at Leatherhead Station after work first started in January 2024 thanks to funding from the Department for Transport's Access for All scheme.
Although it was previously considered step-free, passengers had a long, steep and difficult route out of the station and under a railway bridge to switch platforms while avoiding stairs, Network Rail said.
Lucy McAuliffe, Network Rail's local route director, said: "We want our railway to be as inclusive as possible and Access for All is opening up travel by rail to more and more people."
The funding was also used to make minor modifications to existing ramps and to widen platform two.
The station remained open throughout the work, which saw the existing subway with steps retained.
Southern has also built a new 26-bike cycle hub on platform one - which has a pump and maintenance area and is protected by a key fob entry system.
At the entrance to platform two, Southern has also installed a new double-decker bike rack for another 32 bikes and a parking area for six motorbikes.
Follow BBC Surrey on Facebook and X. Send your story ideas to southeasttoday@bbc.co.uk or WhatsApp us on 08081 002250.
Work starts on rail station accessibility upgrade
Plans could breathe new life into town - council
Disabled access issue tackled at railway station
Network Rail
Department for Transport

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Disruption after boat hits bridge
Disruption after boat hits bridge

Yahoo

time2 days ago

  • Yahoo

Disruption after boat hits bridge

Railway services have been disrupted after a boat hit a bridge. Network Rail said it was notified at about 8:15 BST that a "commercial boat" had collided with the Kingsferry Bridge, connecting the Isle of Sheppey and mainland Kent. Southeastern said it suspended the Sheerness-on-Sea line due to the strike, although it added shortly after 10:00 that normal services would resume shortly. Delays of up to 25 minutes on Southeastern trains between Sittingbourne and Sheerness were reported by INRIX after the strike. Network Rail said the bridge was held in a raised position while its teams examined the structure, which they deemed "safe to reopen". It thanked passengers for their patience. Kent Fire and Rescue Service said it was not called to the incident. The police have been contacted. Follow BBC Kent on Facebook, X, and Instagram. Send your story ideas to southeasttoday@ or WhatsApp us on 08081 002250. Network Rail Southeastern

Data Error Pushed Up UK Inflation in April, Stats Office Says
Data Error Pushed Up UK Inflation in April, Stats Office Says

Bloomberg

time4 days ago

  • Bloomberg

Data Error Pushed Up UK Inflation in April, Stats Office Says

Britain's statistics office has said April's inflation number was 0.1 percentage point higher than it should have been due to an error in data provided by the Department for Transport. The Office for National Statistics published a statement Thursday, saying the incorrect data overstated the number of vehicles subject to excise duty, a tax, therefore pushing up the headline numbers for both consumer price inflation and the retail prices index by 0.1 percentage points in April.

Rail crossing safety plan welcomed
Rail crossing safety plan welcomed

Yahoo

time4 days ago

  • Yahoo

Rail crossing safety plan welcomed

Network Rail's decision to improve safety at a rail crossing near the England-Wales border has been welcomed by North Shropshire's MP and a couple who live nearby. Colin and Ann Edwards live near the viaduct south of Chirk and said a nearby pedestrian crossing over the line was often busy with walkers. Network Rail described the crossing as "a hot spot for trespassing" and said it had recorded numerous incidents of people spending too long getting from one side to the other. It plans to install a set of warning lights at the crossing in December. Network Rail carried out a study between November and April, which recorded 13 incidents where people spent too long crossing. One involved a "large group of 36 children and three adults", when one of the adults stepped off the crossing and stayed there for more than two minutes. On other occasions, people stopped to talk on their phones and one person was seen standing on the crossing for 17 minutes. Safety at the site is one of the reasons it has decided to object to putting extra trains on the line for a direct service between Wrexham, Shropshire and London. Mrs Edwards believed lights "would be a benefit", but said "it comes down to the person's own common sense." "If you don't come and stand and listen and look both ways, well you're daft aren't you?" Mr Edwards agreed and said the crossing, between Gobowen in Shropshire and Chirk in Wrexham county, regularly saw groups of walkers crossing it, sometimes as many as 20 at a time. Network Rail has said plans to increase the number of trains on the line, to create a direct service between Wrexham and London, would create a situation which was "not tolerable". Helen Morgan, the Liberal Democrat MP for North Shropshire, had called for safety measures to be installed and said: "If that crossing was in Birmingham, something would have been done about it". Follow BBC Shropshire on BBC Sounds, Facebook, X and Instagram. Network Rail objects to Wrexham to London service Direct rail service plan supported by PM Plans to run new direct rail services to London New direct train from London to Wrexham proposed Network Rail

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store