
Made in Hyd centre fuselage for Tejas fighter jet
1
2
Hyderabad: In a significant boost to India's self-reliance in defence manufacturing, Hyderabad-based VEM Technologies Private Ltd has successfully completed and handed over the first centre fuselage (CF) assembly of the Tejas Mk1A light combat aircraft (LCA) to Hindustan Aeronautics Limited (HAL).
This milestone marks a critical step in the collaborative production of India's next generation fighter aircraft.
The CF assembly—comprising a semi-monocoque structure made from a mix of metallic and carbon fibre composite materials—was built entirely at VEM's Hyderabad facility. The formal handover to HAL will take place on May 30, in the presence of senior defence officials, including Sanjeev Kumar, secretary (defence production), ministry of defence; DK Sunil, chairman and managing director of HAL, and K Ravi, director (operations), HAL.
VEM Technologies undertook the manufacturing and assembly of 1,595 precision-engineered components for the CF. Each component underwent stringent quality inspection at every stage by HAL's quality assurance teams. The final assembly also received clearances from the Centre for Military Airworthiness and Certification, reinforcing its readiness for integration into the Tejas Mk1A platform.
"Getting the assembly jig clearance is also significant.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Soluções confiáveis para centros de dados IA
Siemens Energy
Read More
Undo
It will now be handed over to HAL for further production," said S Aravind Reddy, senior manager, VEM Technologies. The handover of this second assembly jig significantly strengthens VEM's role as a trusted production partner in HAL's long-term LAC programme.
The Tejas Mk1A airframe consists of five major structural modules: Front, centre, and rear fuselage, along with the left and right wings. While the CF was developed by VEM, other modules are being manufactured by private aerospace firms in Bengaluru and Coimbatore, showcasing the growing footprint of Indian industry in defence production.
With over two decades of partnership with HAL, VEM Technologies has supported numerous critical defence platforms and continues to play a key role in complex systems integration and structural manufacturing.
In a parallel development, HAL has operationalised a third production line for the Tejas Mk1A at its Nashik facility. This line will add capacity for eight additional aircraft annually, augmenting the current output of 16 units from HAL's two Bengaluru-based lines.
The first Tejas Mk1A from Nashik is scheduled for rollout in June 2025, according to official sources.
Building aerospace future
The Tejas Mk1A variant features major upgrades, including enhanced avionics, active electronically scanned array radar, electronic warfare systems, and air-to-air refuelling capability—key enhancements that align with modern combat requirements.
Beyond the LCA, VEM Technologies is also deeply involved in the advanced medium combat aircraft (AMCA) programme—India's upcoming fifth-generation stealth fighter. The company continues to support the DRDO-led AMCA project through advanced structural manufacturing, assembly, and integration capabilities, reinforcing its role in the nation's aerospace future.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
an hour ago
- Time of India
Gujarat company to replace all 33 crest gates of Tungabhadra dam
Munirabad (Koppal): Of the four companies that vied for the tender to replace all 33 crest gates of the Tungabhadra reservoir, the Gujarat-based Hardware Tools and Machinery Project Company emerged as the winner. The responsibility for replacing the crest gates was entrusted to this company by the Tungabhadra Board, which set a deadline of 15 months for the work to be finished. The bidding process included Gujarat's Anar Company, Hardware Tools and Machinery Project Company, along with Telangana's Swapna Projects Pvt Ltd and Bekem Infra Projects Private Limited. Following a thorough evaluation of technical bids and documentation by the board committee, Hardware Tools and Machinery Project Company bagged the tender. According to Basavaraj L, superintendent engineer of KNNL at the Tungabhadra Project Circle in Munirabad, the tender for the replacement of crest gate 19, which was washed away on Aug 10, 2024, was finalised with the Hardware Tools and Machinery Project Company. Additionally, the tender for the remaining 32 crest gates was also awarded to this company. The project is scheduled for completion by the end of June 2026. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Neuvěřitelné: Kalkulačka okamžitě ukáže hodnotu vašeho domu [podívejte se na to]! tržní hodnota mého domu Kliknout zde Undo The comprehensive project encompasses all 33 crest gates. The 19th gate replacement costs Rs. 1.6 crore, while the remaining 32 gates had an allocated budget of Rs. 52 crore. The company secured the contract with a competitive bid of Rs. 41.4 crore through the e-tender process, significantly under the allocated budget, sources said. A technical assessment led by former Central Water Commission chairman AK Bajaj's committee evaluated the dam's condition and provided safety recommendations. National Dam Safety Authority (NDSA) president Anil Jain's subsequent inspection emphasised maintaining reduced water levels during non-destructive testing. Hyderabad-based KSNDT Services conducted comprehensive testing on all gates, including ultrasonic and dye penetration tests, presenting their findings on March 25. Their report indicated a 40-50% reduction in gate thickness from original specifications, necessitating complete replacement. Based on these findings, the Tungabhadra Board opted to replace all gates. The TB Board declared that, while a complete replacement cannot be achieved this year, maintaining water levels 12 to 15 feet above the spill level will provide an adequate supply for single crop cultivation and drinking purposes. Consequently, it was decided to cap water storage at 80 tmc, compared to the reservoir's total capacity of 101 tmc at a height of 1,626 feet.


Indian Express
an hour ago
- Indian Express
Chill in ties, window closing for Canada invitation to G7 summit
With less than two weeks to go for the start of the G7 Summit, being hosted by Canada in Kananaskis in Alberta from June 15-17, India is still to receive an invitation to the gathering. If the invitation window closes, Delhi's absence at the summit will be the first break since 2019. Barring 2020 when the G7 huddle was cancelled by the US, the host country, Prime Minister Narendra Modi has attended every summit since 2019. The chill in Delhi-Ottawa ties has not gone unnoticed. The two countries downgraded diplomatic ties after Justin Trudeau, the then Canadian Prime Minister, set off a political storm in 2023 when he alleged 'potential' involvement of Indian government agents in the killing of a Canada-based Khalistan separatist, Hardeep Singh Nijjar. India rejected the charges as 'absurd' and 'motivated'. Usually, G7 host countries invite some countries as guest countries or outreach partners. Canada has so far invited Ukraine and Australia. It has not released names of other guest countries. France was the host of the G7 leaders' summit in Biarritz in August 2019 — after Modi became Prime Minister in 2014, this was the first invitation. Before that, Prime Minister Manmohan Singh had attended the G8 summit five times between 2004 and 2014 — the grouping became the G7 in 2014 after Russia's suspension, and subsequent exit, over its annexation of Crimea. In 2020, US President Donald Trump called the G7 a 'very outdated group' and said he would like to include India, Australia, South Korea and Russia in the grouping of the largest advanced economies. Trump had suggested that the Group of 7 be called 'G10 or G11', and proposed that the grouping meet in September or November 2020. But due to the pandemic and the US elections, that did not happen. Modi attended the G7 summit in 2021 via virtual mode, and then attended the summits in Germany in 2022, Japan in 2023 and Italy in 2024. This May 25, Canada's new Foreign Minister Anita Anand had a phone conversation with External Affairs Minister S Jaishankar. It was the first official political-level contact between Delhi and Ottawa after Mark Carney won the Canadian elections and became Prime Minister, raising hopes for a reset in ties. Anand said Canada looked forward to rebuilding ties with India as part of an effort to diversify trade away from the US — even as the RCMP investigation into the killing of Canadian Hardeep Singh Nijjar continued. In an interview, referring to Nijjar's killing, she said: 'We are certainly taking it one step at a time. As I mentioned, the rule of law will never be compromised, and there is an ongoing investigation regarding the case that you mentioned.' 'At the same time, we are looking forward to continuing to build this partnership, and we're looking forward to that as a government – it's not just me…It's part of the process of diversifying our relationships and building relationships around the world,' she said. Going by the timelines for the G7 summit — the fact that very little time is left for an invitation and security and liaison teams usually travel to the venue ahead of the Prime Minister's visit — there is a slim chance of Modi attending the G7 summit even if the invitation comes now. But if an invitation is extended, there is a possibility that a minister or a government representative may attend. A call on that will only be taken after the invitation is received. Shubhajit Roy, Diplomatic Editor at The Indian Express, has been a journalist for more than 25 years now. Roy joined The Indian Express in October 2003 and has been reporting on foreign affairs for more than 17 years now. Based in Delhi, he has also led the National government and political bureau at The Indian Express in Delhi — a team of reporters who cover the national government and politics for the newspaper. He has got the Ramnath Goenka Journalism award for Excellence in Journalism '2016. He got this award for his coverage of the Holey Bakery attack in Dhaka and its aftermath. He also got the IIMCAA Award for the Journalist of the Year, 2022, (Jury's special mention) for his coverage of the fall of Kabul in August 2021 — he was one of the few Indian journalists in Kabul and the only mainstream newspaper to have covered the Taliban's capture of power in mid-August, 2021. ... Read More


News18
2 hours ago
- News18
Quick Routes Int'l exits Zinka Logistics; pares 9% stake for Rs 672 cr
New Delhi, Jun 3 (PTI) Quick Routes International on Tuesday exited Zinka Logistics Solutions by selling a 9 per cent stake in the company for Rs 672 crore through open market transactions. Zinka Logistics Solutions is the parent entity of logistics unicorn Blackbuck. According to the bulk deal data available on the NSE, Quick Routes International sold more than 1.59 crore shares in two tranches, representing a 9 per cent stake in Zinka Logistics. The shares were offloaded in the price range of Rs 420.06-420.25 apiece, taking the combined transaction value to Rs 671.76 crore. In a separate transaction on the NSE, Peak XV Partners' affiliate Peak XV Partners Investments VI disposed of 12.10 lakh shares in Zinka Logistics Solutions for Rs 53 crore. The shares were sold at an average price of Rs 444.71 per piece, taking the deal size to Rs 53.84 crore. Meanwhile, Abu Dhabi Investment Authority, Massachusetts Institute of Technology, ICICI Prudential Mutual Fund, SBI Mutual Fund and Nomura India acquired a total of 83.87 lakh shares or cumulatively a 4.73 per cent stake in Bengaluru-based Zinka Logistics. Details of the other buyers of Zinka Logistics' shares could not be ascertained on the National Stock Exchange (NSE). In a separate bulk deal on the BSE, private equity firm Accel through its affiliates — Accel India IV (Mauritius) and Accel Growth Fund V — divested a 2.7 per cent stake in Zinka Logistics Solutions for Rs 204 crore through open market transactions. The shares were sold in the price range of Rs 420.04-420.29 per piece, taking the aggregate deal value to Rs 203.78 crore. Details of the other buyers of Zinka Logistics Solutions' shares could not be identified on the exchange. Shares of Zinka Logistics Solutions rose 1.43 per cent to close at Rs 443.75 apiece on the BSE, and it went up by 0.96 per cent to settle at Rs 441.85 per piece on the NSE. PTI HG AMJ AMJ AMJ First Published: June 04, 2025, 02:00 IST