logo
Big boost wanted for ‘cornerstone' tourism sector

Big boost wanted for ‘cornerstone' tourism sector

crop_adrian_clifton_2_081024.jpg
Larnach Castle general manager Adrian Clifton. PHOTO: PETER MCINTOSH
A popular Dunedin attraction is advocating for tourism funding to get a big boost.
A submission from Larnach Castle on the Dunedin City Council's 2025-34 draft long-term plan said a significant increase was needed.
"As the tourism sector continues to be a cornerstone of New Zealand's economy, it is imperative that Dunedin capitalises on this opportunity to bolster its local economy, enhance community vibrancy and position itself as a premier destination for both domestic and international visitors," castle general manager Adrian Clifton said.
"The city's rich cultural heritage, vibrant arts scene and proximity to unique wildlife and natural attractions make it an attractive destination for tourists," Mr Clifton said.
"Investing in tourism infrastructure and promotion can amplify these inherent advantages, driving increased visitor numbers and spending."
The castle on the ridge of Otago Peninsula attracts about 120,000 visitors a year.
Mr Clifton said there had been a robust recovery and growth in tourism nationally since the Covid-19 pandemic.
Dunedin stood to benefit from this, he said.
Mr Clifton called for a larger portion of the council's nine-year plan budget to go into tourism development, focusing on events, hosting, attending trade events, public relations and marketing.
"By investing further in tourism, Dunedin can unlock significant economic and social benefits, ensuring a prosperous future for its residents and businesses," Mr Clifton said.
The submission coincides with the council's Enterprise Dunedin unit being reviewed.
It was reviewed previously in 2018, after Larnach Castle director at the time Norcombe Barker blasted Enterprise Dunedin's performance as an "unmitigated disaster".
The review by consultancy MartinJenkins found Enterprise Dunedin had an important role in economic development in the city, but stakeholders felt it was not "sufficiently engaged" in maximising and growing tourism and its economic benefits.
It stopped short of recommending a new council-controlled organisation replace Enterprise Dunedin.
This possibility is back on the table, or it could continue to be run with council staffing.
MartinJenkins said in 2020 Enterprise Dunedin had made good progress against most of the review recommendations.
Enterprise Dunedin was set up in 2014, bringing together the council's economic development unit and visitor information centre and the former Tourism Dunedin council-controlled organisation.
A council resolution from November last year asked for consultation with stakeholders on a "refresh" of the MartinJenkins report as part of the new review.
My Governance has started the review, which is being run in two phases.
Council policy and partnerships manahautū (general manager) Nicola Morand said all the services provided by Enterprise Dunedin would be considered in the review.
The second phase, yet to be contracted, would look into governance options and operational models.
A final report and recommendations would be presented to the council at the end of July.
grant.miller@odt.co.nz

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Work on tunnels trail to begin
Work on tunnels trail to begin

Otago Daily Times

time16 hours ago

  • Otago Daily Times

Work on tunnels trail to begin

Construction of the first leg of the long-anticipated Dunedin Tunnels Trail will begin next week, the Dunedin City Council has announced. DCC infrastructure services committee chairman Cr Jim O'Malley said yesterday in a statement the first 1.5km stage of the trail was fully funded by the council. From a $1.8 million budget, about $400,000 had already been spent on the design, consents and the purchase of land. The rest would be used for construction "and to progress stage one of the trail as far as possible", Cr O'Malley said. "We'll then work with the [Dunedin Tunnels Trail Trust] so they can implement the next stages." The first stage was all off-road, running from Gladstone Rd North, in Wingatui, along a disused rail alignment, before it ran through the Victorian-era Chain Hills Tunnel and a few hundred metres beyond. "People will get to experience the historic Chain Hills Tunnel, opened in 1875, and some lovely regenerating bush," he said. The plan in the long term was to continue the trail to Fairfield, Abbotsford Rd and Green Island through the Caversham Tunnel and into the city. The work scheduled to begin next week included construction of an unsealed trail, drainage works, fencing, installation of seats, plantings, handrails and signs. Trust chairman Brent Irving said it was "fantastic to finally get something under way". The trust had been working towards a trail since the early 2000s, Mr Irving said. "The potential for this trail is significant," he said. "The goal is to push through so commuting or recreational riders and walkers can move safely from Dunedin to Fairfield and on to the Taieri or vice-versa." "The wider, medium-term objective is to have a trail from Queenstown right through to Dunedin City and up the coast with various other trusts and groups working on different sections. Dunedin will become part of the hugely successful Shared Path Cycleway network across the region and the country." Council climate and city growth general manager Scott MacLean said the council understood it was "super exciting" to have the trail's construction under way, but people were asked to wait until the section was fully completed before attempting to use it. "Once it's completed, we'll also be asking people not to move beyond the end of the constructed trail," Mr MacLean said. "While it may be tempting to explore further, unformed sections of the trail, it would mean going on to private land or rail corridor and may impact our ability to negotiate access for the remainder of the trail." The council is developing the trail in partnership with the Dunedin Tunnels Trail Trust under a Memorandum of Understanding. In a social media post yesterday, the trust said Fulton Hogan had won the contract for the work. The first stage was due to be finished in October, it said. — APL

Capable NZ set to lose 20 jobs
Capable NZ set to lose 20 jobs

Otago Daily Times

timea day ago

  • Otago Daily Times

Capable NZ set to lose 20 jobs

Otago Polytechnic staff are feeling "like stunned mullets" after the institution cut 20 jobs from a ground-breaking department. Staff were informed of the decision on Thursday to cut the Capable NZ department from about 30FTEs to nine FTES and an additional head of college role, after a proposal was put forward in March. Despite staff fighting for more jobs to be kept, management at Otago Polytechnic agreed on a rate of job cuts very similar to the March proposal. A staff member, who did not wish to be named, said people were "like stunned mullets" when they heard the news. "We expected a bit of pain, but nothing of this level. "The staff will try to teach the material to a gold-standard level, but it becomes increasingly difficult with far less staff support." Capable NZ allows students to apply and start any time and complete the required work from anywhere in New Zealand. Qualifications earned through Capable NZ have the same value as those earned through normal Otago Polytechnic programmes, or other tertiary institutions. Capable NZ had at its height more than 500 students. This had dropped to about 270 last year. The polytechnic blamed the ongoing effects of Covid-19 and the fact it was a politically fraught environment. Otago Polytechnic deputy executive director Mark Cartwright said "despite the change in structure, it's important to emphasise there will be no cuts to existing programmes". "We believe Capable NZ provides an important and meaningful service to our community and are committed to its continued delivery. "The purpose of the change is to ensure we are operating in a financially sustainable way. "We will move the Capable NZ department and all of its programmes to sit under Te Maru Pumanawa (TMP), our College of Creative Practice and Enterprise." Former Otago Polytechnic chief executive Phil Ker said this week's announcement of cutbacks to Capable NZ, "represents a real vote of no confidence" in the department. He said many of the problems could be traced back to the merging of the country's 16 Institutes of Technology and Polytechnics (ITPs) into the mega-polytechnic Te Pukenga. "At the advent of Te Pukenga, Capable NZ was the largest school at Otago Polytechnic, with nationwide coverage and offering highly innovative and unique programmes. That was why it had so many staff. "So, clearly it's fallen on hard times. What I am aware of is that there was considerable neglect on the marketing and promotion front across many aspects of Te Pukenga. "I've got no doubts that Capable NZ would have suffered from that." Mr Ker said despite these barriers, he was confident Capable NZ could rise again if managed properly. "The Capable NZ approach, which is at the undergraduate level, is still highly innovative in a global context, let alone in a New Zealand context. "It offers access to degree-level qualifications for people in work. That is as cost-effective as you can get. "So it seems to me that any downturn could easily be counteracted by a well-planned and well-focused marketing and recruitment programme." Staff told the Otago Daily Times they were worried about the bulk of the programme's institutional memory disappearing. Tertiary Education Union assistant secretary Daniel Benson-Guiu said Capable NZ was unique to Otago Polytechnic in that it was neither an "on campus" course or a "work-based learning" course. "People flocked to it outside of the polytechnic's catchment area," Mr Benson-Guiu said. "A programme like this allows the polytechnic to have a more national focus, which is what's needed to ensure student numbers remain good." Vocational Education Minister Penny Simmonds is due to make an announcement next month about which polytechnics will become autonomous and which ones remain in a "federation" model. Otago Polytechnic has frequently expressed a desire to become autonomous again. Mr Cartwright said Otago Polytechnic needed to "ensure the financial viability of our organisation to be able to stand alone". Asked about Mr Ker's comments about the job cuts being a "vote of no confidence" in Capable NZ, Mr Cartwright said "this difficult decision is in no way a reflection of the amazing work the team does, or the unique products they offer". "It is the result of steadily declining enrolments. The changes will ensure we are able to continue to provide these products and services in a financially viable way."

Airport to provide new HQ
Airport to provide new HQ

Otago Daily Times

timea day ago

  • Otago Daily Times

Airport to provide new HQ

Wakatipu Search and Rescue (LandSAR) has unveiled plans for a new headquarters at Queenstown Airport. Build committee member Russell Tilsley says the airport company has agreed to provide LandSAR with a site, next to the Heliworks and Alpine Helicopters bases, on the northern side of the runway. Now based in a corner of a Heliworks hangar, the organisation's 80-odd volunteers need a dedicated building where they can run operations, train and store equipment, Ms Tilsley says. "We've never had our own base, and with the increase in search and rescue that's happening around the region — summer and winter — we need one." With suitable land in and around the airport being rapidly snapped up, it's a case of "striking while the iron's hot". Architect Mary Jowett has completed a design for a two-level, 400sq m building with incident management and comms rooms, a training space, a kitchen/lounge area, two bunk rooms for use during multi-day operations and storage space. The committee is about to get the build priced, but Tilsley expects it will cost somewhere between $2 million and $3m. A fundraising campaign will be launched in the next few months. He hopes construction can start within 18 months, and the building be up and running a year after that. Formerly based in Queenstown police station, LandSAR had to move out in 2020 during Covid, and squeezed into the Alpine Cliff Rescue team's base in a converted garage in Lucas Pl, he says. "There was a group of nearly 80 people operating out of a tin shed." Heliworks owner Nick Nicholson came to the rescue in 2021, providing the organisation with its current base in one of the company's hangers. However, it's always been a temporary measure, Ms Tilsley says. The organisation runs rescue operations — which can last a week — out of Heliworks' boardroom, and its volunteers sleep in the company's office space. It has benefited from the "incredible" generosity and support of Nicholson, Jowett and the airport company just to get this far, and will be relying on the community to get the build over the line, he says. LandSAR volunteers do a huge amount for the community, applying high-level expertise and training to save lives. "These people are vitally important, and this is our opportunity to future-proof the organisation for the next 20 to 30 years."

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store