
Winnipeg Transit unveils first zero-emission fuel-cell bus
Winnipeg Transit unveiled its first zero emission bus on Wednesday.
But while the city expects to receive dozens more zero-emission buses over the next few years, supply chain issues, budget pressures and looming tariff threats have thrown the city's plans to phase out its diesel fleet into doubt.
Erin Cooke, manager of Transit's transition to zero-emission bus program, says the city will test two types of buses — hydrogen fuel cell and battery electric — in 40-foot and 60-foot sizes.
The fuel cell bus the city received is the third such vehicle in service in Canada, Cooke said.
"So we're cutting-edge right now, when it comes to technology, for testing this out," Cooke told reporters during a news conference at Transit's Osborne Street garage.
"We do have other zero-emission buses that will be arriving this year, which will include the first 60-foot [electric] buses in Canada, as well as battery electric buses as well."
The buses include a mix of fuel cell electric, which charge with hydrogen, and battery electric, which can be plugged into a charger.
With $280 million from all three levels of government through the Investing in Canada Infrastructure Program, the city expects to purchase a total of 90 zero-emission buses, including 70 battery electric and 20 fuel cell vehicles.
Half of the 16 buses expected this year will be fuel cell, and the other half will be battery electric. Half will be 40 feet in length, and the other half will be 60 feet. The city expects to receive another 24 zero-emission buses next year.
A 40-foot battery electric bus costs around $1.56 million, while a fuel cell bus costs about $1.9 million. A diesel bus costs approximately $900,000.
Hydrogen buses can run for 24 hours, while battery electric buses can run for 10 to 15 hours.
Fuel cell buses are entirely zero-emission, while battery-electric buses must include a small diesel generator to heat the battery in cold weather.
The city participated in a pilot project to test four zero-emission buses from 2015 to 2018.
Zero-emission plans scaled back
The city has already scaled back its plans to purchase more zero-emission buses. It had planned to buy 100 buses with the funding from ICIP, but had to reduce its orders due to supply chain issues and cost pressures.
The 2025 budget includes a directive to resume purchasing diesel buses in 2027.
Public works chair Coun. Janice Lukes isn't sure the city will meet its goal of an all-electric fleet by 2045.
"The city would love to have all electric buses, but unfortunately unless we have other level of government support, we won't be able to afford them," she said.
Cooke says the city could still meet the target.
"As long as we make choices sort of in the 2032 timeline … that target's is still totally achievable," she said.
Josipa Petrunic with the Canadian Urban Transit Research and Innovation Consortium says looming tariffs on U.S. imports from Canada could cut the number of electric buses the city can afford even further.
"Buses get more expensive, and all of a sudden the city that has so much money can buy many fewer buses from what it planned," Petrunic said.
There are currently 632 buses in the city's fleet.
The city says the new buses will begin limited service in April, after the spring schedule change.
Winnipeg Transit's first zero-emissions bus arrives
40 minutes ago
Duration 1:37
The first of Winnipeg Transit's new electric buses has arrived. The city expects to receive dozens of zero emission buses over the next two years. The city says the new buses will begin limited service in April, after the spring schedule change.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


CBC
13 hours ago
- CBC
Winnipeg Transit considering shield extensions or full enclosures to better protect drivers
Social Sharing Winnipeg Transit is exploring options for new shields to provide increased safety to drivers. Currently, all buses in the fleet have partial shields, which the city installed in response to rising concerns about violence, including the stabbing death of driver Jubal Fraser in 2017. The union representing drivers says safety remains a problem for both operators and passengers, after it recorded 37 safety incidents on Winnipeg Transit buses in April — the highest monthly total since it began tracking in 2020, it said. Now, the city has put out an expression of interest as it considers whether to install extensions to the existing shields, or move to a fully enclosed safety barrier. Chris Scott, president of the Amalgamated Transit Union Local 1505, says he strongly supports the latter option. "We want the city to spend the taxpayers' money wisely," and shield extensions wouldn't do that, he said. "To spend money on an extension at the risk of the assaults or security incidents escalating only means that in the future, they'll have to invest in full compartment enclosures anyway." The partial barriers were installed to prevent people running up and "sucker-punching" drivers, but people have now figured out ways to get around them, Scott said. "If we go with just the extension, that will be effective in the short term. But in the long term … [attackers] will adapt to further escalate their levels of violence." The City of Winnipeg budgeted $2.7 million for the new shields in 2024. Public works committee chair Coun. Janice Lukes doesn't believe that will be enough on its own to outfit every bus in the fleet, but she hopes other funding, like the Canada public transit fund announced by the federal government earlier this year, could be used to cover the full cost. Scott says he has heard conflicting reports about the relative costs of shield extensions versus full enclosures. Extensions can cost between $10,000 and $12,000. Some reports have indicated full enclosures would run about the same price, but others have listed prices for full enclosures as high as $25,000. Although she hasn't made up her mind regarding which option she prefers, Lukes says she's open to purchasing the full shields if the drivers want them. "I want what works best to keep the staff safe," the Waverley West councillor said. "If the staff feel a full shield will do the job, if we can get a full shield at a reasonable price, why wouldn't we do that?"


CBC
21 hours ago
- CBC
Former New York, London transit exec tapped to lead Toronto Transit Commission
The incoming CEO of the Toronto Transit Commission says he hopes to leverage his experience working for two of the largest transit agencies in the world to make the TTC the most reliable transit system in North America. Mandeep Lali was announced as the TTC's pick to be the new CEO at a news conference in Scarborough Thursday. "My vision for the TTC is to be world class — world class in safety, reliability, affordability and accessibility," Lali said Thursday. "Those are all basics of which are fundamentals of a great transportation system." Lali was previously an executive at New York's Metropolitan Transportation Authority (MTA), serving as executive vice-president and chief operating officer of subways for the largest transit agency in North America. Prior to that, he spent over a 13 years at Transport for London. He'll be taking over the role from Rick Leary, who retired at the end of August last year. Lali was tapped to take the helm of the city's transit commission after an extensive international search that lasted close to nine months, said TTC board chair Jamaal Myers at Thursday's news conference. "When we asked him what his goal for the TTC was, he said, without missing a beat, to make the TTC the most reliable transit system in North America," Myers said. "As a lifelong TTC rider this was music to my ears. It's what every Torontonian wants to hear."


CTV News
21 hours ago
- CTV News
New York transit executive selected to be new head of TTC
New TTC CEO Mandeep Lali is shown during a news conference in Toronto on June 5. A New York City transit executive has been tapped to take over as the head of the Toronto Transit Commission, Mayor Olivia Chow announced Thursday. Mandeep Lali, who was previously in charge of subway operations at New York's Metropolitan Transportation Authority (MTA), will replace former TTC CEO Rick Leary, who resigned last summer. 'Mr. Lali has over two decades of global experience in transit,' Chow said during Thursday's news conference in Scarborough. 'He deeply understands public transit in a big, busy city. Mandeep Lali's depth of experience managing the most complex subway system in the world is exactly what we need to get Toronto moving.' TTC Chair Jamaal Myers called the hiring process an 'extensive international search' that lasted nearly nine months. He noted that Lali has 'immense experience' in both the private and public sector and has held senior roles at 'two of the world's most iconic transit system.' In addition to his experience at the MTA, Myers said Lali spent 13 years in 'progressively senior roles' at Transport for London and worked as an executive at Otis Elevators. Lali will officially take over as head of the TTC on July 7, Myers noted. 'What made Mandeep stand out among all of the outstanding candidates that we considered was his clarity of vision,' Myers said. 'When we asked him what his goal for the TTC was he said, without missing a beat, 'To make the TTC the most reliable transit system in north American.' As a lifelong TTC rider, this was music to my ears.' Reliability is a gripe frequently heard from TTC riders, who have at times faced lengthy commutes thanks various issues on both the subway system and along surface routes. Slow zones on both Line 1 and Line 2 have been periodically implemented due to sections of the track having 'state-of-good-repair needs,' the TTC previously said. 'My vision for the TTC is to be world-class,' Lali told reporters at the news conference on Thursday. 'World class in safety, reliability, affordability, and accessibility. Those are all basics which are fundamentals to a great transportation system.' He said although he is a month away from his first day on the job, he plans to 'hit the ground running.' 'I am aware of the slow zones, I'm aware of the bunching issues,' he said. 'They will also be priorities on the list.' When thinking about his new role, Lali joked that he is both 'ecstatic' for the new challenge as well as a 'bit terrified.' 'Looking ahead, this is a very exciting time here in Toronto,' he said. 'You've got a metamorphosis and transformation happening with respect to the transport sector.' The TTC is preparing to begin testing on the long-awaited Eglinton Crosstown LRT, which premier Doug Ford said could be up and running as soon as September. Transit riders in the city are also eagerly awaiting word on when the Finch West LRT will open in the city. Construction has also begun on the Ontario Line, a 15.6-kilometre subway line which is expected to massively expand capacity on Toronto's public transit system. The project, which is slated to have 15 stops running from the former Science Centre to Exhibition Place, is not expected to be operational until 2031 at the earliest.