
Israel police close roads, evacuate residents as fires spread near Jerusalem
This is an AI generated representative image
Israeli police on Wednesday closed the main Jerusalem-Tel Aviv highway and evacuated residents along the route as brushfires broke out again in an area ravaged by blazes a week ago.
Communities located about 30 kilometres (19 miles) west of Jerusalem were evacuated, Israeli media reported, airing images of firefighting teams battling fierce flames.
Due to the weather conditions, the Israeli minister responsible for arranging national ceremonies, Miri Regev, announced that the main Independence Day event planned for Wednesday evening in Jerualem was cancelled.
High temperatures and strong winds have allowed the fires in wooded areas to spread quickly, prompting evacuations from at least five communities, the police said in a statement.
Emergency services provider Magen David Adom said in a statement that "at this stage, there are no reported casualties."
"Ambulance teams, intensive care units and immediate response vehicles are providing medical support for
firefighting operations
," it added.
National Security Minister Itamar Ben Gvir, who oversees Israel's fire department, said in a statement that he was heading to the affected area, which often sees wildfires at this time of year.
When fires broke out in the same area last week, Prime Minister Benjamin Netanyahu had called for increased measures to douse the flames and said they must be stopped before reaching Jerusalem, which was eventually the case.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
36 minutes ago
- Time of India
Delhi airport flight cuts: Over 100 flights to be affected daily; runway upgrade from June 15
Travellers flying in and out of Delhi in the upcoming months might see a little turbulence in their plans as Delhi airport will be canceling almost 7.5% of its daily flights. For three months, from June 15 to September 15, the airport will be cancelling 114 daily flights, as the airport operator DIAL begins upgradation tasks on one of its runways. The runway, RW 10/28, will remain closed to allow for instrument landing system (ILS) enhancements. Once upgraded, the runway will be CAT III compliant, enabling safer operations during low-visibility conditions, especially in the fog-prone winter months. At present, Indira Gandhi International Airport handles around 1,450 flight movements per day, making it the country's busiest. It operates four runways and two terminals (T1 and T3), while T2 remains closed for maintenance. The Delhi International Airport Limited (DIAL) CEO Videh Kumar Jaipuriar said 'we want to upgrade that runway to mitigate any issues or problems that we were facing, especially during the fog season. So for RW 10/28, there are two upgrades that we are going to do' Confirming the schedule at a press conference on Friday, he said, 'RW 10/28 will not be operational from June 15 for a period of three months. We want to upgrade that runway to mitigate any issues or problems that we were facing, especially during the fog season.' Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Perdagangkan CFD Emas dengan Broker Tepercaya IC Markets Mendaftar Undo Jaipuriar also clarified that the passengers are being notified in advance. 'If you look at it from the right perspective, we have got 1,450 operations in a day. Out of that, about 114 operations are going to be impacted, which is 7.5%,' he explained. In total, 200 flights will be affected daily, with 114 cancelled and 86 rescheduled to non-peak hours, as part of the three-month adjustment. DIAL said the ILS installation would be completed by November 27, just ahead of the winter fog season. The earlier plan to shut RW 10/28 in April-May was abandoned due to heavy congestion and adverse weather. The revised schedule, now aligned with the civil aviation ministry's directive, was finalised in consultation with airlines. DIAL, majority-owned by GMR Airports, said all slot adjustments were made in close coordination with carriers to minimise disruption. Representatives of several airlines were also present at the briefing to show consensus on the move. 'Efforts have been made to ensure a balanced approach to maintain operational stability and minimise disruptions during the closure of RW 28/10,' Jaipuriar said. Stay informed with the latest business news, updates on bank holidays and public holidays . AI Masterclass for Students. Upskill Young Ones Today!– Join Now


Hindustan Times
2 days ago
- Hindustan Times
82.31% of pre-monsoon silt removed in Mumbai's rivers, drains
MUMBAI: Desilting works in the Mithi River, along with various large and small drains across Mumbai, are progressing rapidly, said the Brihanmumbai Municipal Corporation (BMC) on Wednesday. This year, the target for pre-monsoon desilting is 9,68,008 metric tonnes. As of Wednesday morning, the BMC has removed 796,765 metric tonnes of silt, i.e. 82.31% of the target. The work is executed with the aid of Artificial Intelligence (AI) systems, which the civic officials say has improved efficiency and transparency in the desilting process. According to the BMC administration, through AI monitoring, fines exceeding ₹3 crore were levied on negligent contractors. Desilting efforts will continue even during and after the monsoon, they said. Each year before monsoon, the BMC's stormwater drainage department undertakes the desilting of major drains in the city, including the Mithi River. Smaller drains are desilted at the ward level. Annual desilting targets are determined based on studies on rainfall patterns and intensity. Before monsoon, 80% of the desilting is planned and 10% is planned during monsoon and post-monsoon. In previous years, desilting city's drains usually began in March. This year, due to the early onset of monsoon on May 26, and unprecedented rainfall recorded in May, the desilting schedule was partially affected. However, by the first week of June, the desilting of all major drains was completed. Work on desilting the Mithi River is currently underway. Special focus is given to improving cleanliness and the river's carrying capacity, said officials. Dedicated teams and equipment have been deployed in various areas to expedite the desilting of the river. To ensure proper execution and supervision, the BMC has mandated the submission of photographs and 30-second video recordings of the desilting work. For smaller drains, CCTV footage depicting before and after conditions must be submitted to the civic body. All submitted media are analyzed using AI systems to ensure proper monitoring and complete transparency in the desilting process.


The Wire
2 days ago
- The Wire
Northeast Flash Floods: Havoc in Arunachal Pradesh, Sikkim, Manipur Claiming lives, Aid Missing
Menu हिंदी తెలుగు اردو Home Politics Economy World Security Law Science Society Culture Editor's Pick Opinion Support independent journalism. Donate Now Video Northeast Flash Floods: Havoc in Arunachal Pradesh, Sikkim, Manipur Claiming lives, Aid Missing The Wire Staff 26 minutes ago Over 30 lives lost, thousands displaced, and infrastructure destroyed. Yet, cries for help from states like Manipur remain unheard. A villager uses a makeshift banana raft to reach safer ground in flood-hit Amtola village in North Lakhimpur, Sunday, June 1, 2025. Real journalism holds power accountable Since 2015, The Wire has done just that. But we can continue only with your support. Contribute now The Northeastern states of India – Assam, Manipur, Sikkim, Mizoram, Arunachal Pradesh, and Tripura – are battling relentless floods and landslides. Over 30 lives lost, thousands displaced, and infrastructure destroyed. Yet, cries for help from states like Manipur remain unheard. Watch the full report. The Wire is now on WhatsApp. Follow our channel for sharp analysis and opinions on the latest developments. Make a contribution to Independent Journalism Related News Silent on Trump's Claims, Modi Hits the Road With Op Sindoor Blitzkrieg MIT Class President Megha Vemuri's Viral Graduation Speech on Israel's Genocide in Gaza 'Israel is Becoming a Pariah, 70% Israelis Want to End War': Former Israeli Minister Tears, Queues and a Never-Ending Search for Kagaz: The Real Story of Aadhaar Jaanne Bhi Do Yaaro | India's Data Blackout – From Census to Covid Deaths 'India is Becoming a Nation of Duffers': Avay Shukla Watch | 'Political Handling of Op Sindoor Was Incompetent and Irresponsible' Mumbai Floods: Aaditya Thackeray, Varsha Gaikwad Slam BJP-BMC Over Civic Collapse Watch | India Overtakes Japan as the Fourth-Largest Economy: Is the Excitement Justified? About Us Contact Us Support Us © Copyright. All Rights Reserved.