17,600g/t Silver Intersected at Tarcoola's Tolmer Prospect
28,000 gram-metres silver drilled less than 50 metres from surface
ADELAIDE, AUSTRALIA / ACCESS Newswire / March 26, 2025 / Barton Gold Holdings Limited (ASX:BGD)(FRA:BGD3)(OTCQB:BGDFF) ( Barton or the Company ) is pleased to announce further high-grade assays from the Tolmer prospect (Tolmer) at its South Australian Tarcoola Gold Project (Tarcoola), where recent assays have confirmed high-grade gold and silver mineralisation. 1
Additional multi-element assays have identified further near surface mineralisation grading up to 17,600 g/t Ag, suggesting a new style of independent high-grade silver mineralisation at Tolmer.[1]
Full details are contained in the complete announcement, which can be accessed on the ASX website, the investor section of Barton's website, or directly by clicking here.
Authorised by the Managing Director of Barton Gold Holdings Limited.
For further information, please contact:
About Barton Gold
Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000oz annually, with ~1.7Moz Au JORC Mineral Resources (64.0Mt @ 0.83 g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*
Competent Persons Statement & Previously Reported Information
The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy ( AusIMM ), Australian Institute of Geoscientists ( AIG ) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 ( JORC ).
Activity
Competent Person
Membership
Status
Tarcoola Mineral Resource (Stockpiles)
Dr Andrew Fowler (Consultant)
AusIMM
Member
Tarcoola Mineral Resource (Perseverance Mine)
Mr Ian Taylor (Consultant)
AusIMM
Fellow
Tarcoola Exploration Results (until 15 Nov 2021)
Mr Colin Skidmore (Consultant)
AIG
Member
Tarcoola Exploration Results (after 15 Nov 2021)
Mr Marc Twining (Employee)
AusIMM
Member
Tunkillia Exploration Results (until 15 Nov 2021)
Mr Colin Skidmore (Consultant)
AIG
Member
Tunkillia Exploration Results (after 15 Nov 2021)
Mr Marc Twining (Employee)
AusIMM
Member
Tunkillia Mineral Resource
Mr Ian Taylor (Consultant)
AusIMM
Fellow
Challenger Mineral Resource
Mr Dale Sims (Consultant)
AusIMM / AIG
Fellow / Member
The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted in this announcement, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.
Cautionary Statement Regarding Forward-Looking Information
This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as 'seek', 'anticipate', 'believe', 'plan', 'expect', 'target' and 'intend' and statements than an event or result 'may', 'will', 'should', 'would', 'could', or 'might' occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.
[1] Tolmer assays to date have returned maximum individual lead results of 3.46% Pb (refer to ASX announcement dated 30 January 2025)
* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 4 March 2025. Total Barton JORC (2012) Mineral Resources include 909koz Au (30.8Mt @ 0.92 g/t Au) in Indicated category and 799koz Au (33.2Mt @ 0.75 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

Yahoo
2 days ago
- Yahoo
Primary Hydrogen Announces Renewal of Marketing Agreement
Calgary, Alberta--(Newsfile Corp. - June 6, 2025) - Primary Hydrogen Corp. (TSXV: HDRO) (FSE: 83W0) (OTCQB: HNATF) (the "Company" or "Primary") is pleased to announce the extension of its strategic marketing agreement (the "Services Agreement") with Euro Digital Media Ltd. ("Euro Digital") (address 71-75 Shelton Street, Covent Garden, London UK WC2H 9JQ) previously announced on November 27, 2024, March 28, 2025 and May 7, 2025. Under the terms of the Services Agreement, Euro Digital creates campaigns, ad groups, text ads, display ads, performs detailed keyword research, setup and manages remarketing campaigns, optimize keyword options, coordinates online advertisers and marketers corresponding to online marketing targets, creates landing pages for ad campaigns and generally bring attention to the business of the Company. The Company has renewed the Services Agreement and agreed to pay Euro Digital a fee of USD $100,000 for continuation of the ongoing services, inclusive of third-party costs. The renewal of the services under the Services Agreement will commence on or about June 10, 2025, and continue until the earlier of (a) a two-month term, and (b) exhaustion of the marketing budget. The principal of Euro Digital is Harry Kundan. The Company will not issue any securities to Euro Digital as compensation for its marketing services. As of the date hereof, to the Company's knowledge, Euro Digital (including its principal) does not own any securities of the Company and has an arm's length relationship with the Company. The renewal of the Services Agreement is subject to approval of the TSX Venture Exchange. About Primary Hydrogen Corp. Primary Hydrogen is dedicated to the exploration and development of natural hydrogen resources. With over 740 acres in the U.S. and 230 square kilometers across Canada, the Company's portfolio includes the Blakelock, Hopkins, Mary's Harbour, Point Rosie, Crooked Amphibolite, Coquihalla, and Cogburn projects. Primary also holds the Arthur Lake copper project in British Columbia and has an option to acquire a 75% interest in a hydrogen-REE project known as Wicheeda North, also located in British Columbia. -- FOR FURTHER INFORMATION PLEASE CONTACT: Ben Asuncion, CEO, Primary Hydrogen Corp. at ben@ Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION This news release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation. The forward-looking statements herein are made as of the date of this news release only. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budgets", "scheduled", "estimates", "forecasts", "predicts", "projects", "intends", "targets", "aims", "anticipates" or "believes" or variations (including negative variations) of such words and phrases or may be identified by statements to the effect that certain actions "may", "could", "should", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information in this news release includes statements with respect to the provision of services by Euro Digital to the Company. Although the Company believes, in light of the experience of their officers and directors, current conditions and expected future developments and other factors that have been considered appropriate, that the expectations reflected in the forward-looking statements and information in this news release are reasonable, undue reliance should not be placed on them because the parties can give no assurance that such statements will prove to be correct. Such statements and information reflect the current view of the Company. There are risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. Forward-looking statements are based on certain material assumptions and analysis made by the Company and the opinions and estimates of management as of the date of this news release. These forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements or forward-looking information, including, but not limited to, the risk that the TSX Venture Exchange will not approve the Service Agreement, stock market volatility and capital market fluctuations, general market and industry conditions, as well as those risk factors discussed in the Company's most recently filed management's discussion and analysis filed under the Company's SEDAR+ profile at Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial outlook that are incorporated by reference herein, except in accordance with applicable securities laws. To view the source version of this press release, please visit Sign in to access your portfolio

Yahoo
2 days ago
- Yahoo
Battery X Metals Successfully Validates Next-Generation Battery Rebalancing Machine on Light-Duty Electric Vehicle Model that Exhibited Significant Real-World Cell-Imbalance-Related Capacity Degradation, Achieving 100% Imbalance Recovery and 38% of Rated Capacity Restored in Preliminary Trial
News Release Highlights: X Rebalancing Technologies successfully validates its next-generation battery rebalancing machine on a commercial electric truck battery that had experienced significant real-world imbalance, expanding functionality to include a Class 3 light-duty EV model. 2.0 achieved 100% recovery of imbalance-related capacity loss and a 37.7% increase of the rated capacity, underscoring the machine's effectiveness on a significantly imbalanced battery pack. trial conducted on a significantly imbalanced battery pack provided by an authorized Canadian distributor of the electric truck, highlighting market interest and broader demand for cost-effective solutions to restore electric vehicle battery capacity and avoid costly full-pack replacements. VANCOUVER, BC / / June 6, 2025 / Battery X Metals Inc. (CSE:BATX)(OTCQB:BATXF)(FSE:5YW, WKN:A40X9W)("Battery X Metals" or the "Company") an energy transition resource exploration and technology company, announces that further to its news releases dated May 9, 2025, May 23, 2025, and May 30, 2025, its wholly-owned subsidiary, Battery X Rebalancing Technologies Inc. ("Battery X Rebalancing Technologies"), has expanded the functionality of its next-generation lithium-ion battery rebalancing hardware and software platform to include a fully electric, Class 3 commercial electric vehicle, or light-duty electric vehicle (the "Electric Truck"), and has achieved successful preliminary trial results (the "Trial") on an 144-battery cell Electric Truck battery pack which had exhibited significant natural imbalance caused by real-world conditions, demonstrating 100% recovery of a naturally occurring imbalance-related capacity loss, and a 37.7% increase of the Rated Capacity (as defined herein) of the Electric Truck's battery pack, composed of lithium nickel manganese cobalt oxide (NMC) materials (the "Electric Truck Battery Pack"). The Trial results (the "Results") were performed using Battery X Rebalancing Technologies' second-generation, patent-pending battery rebalancing machine ("Prototype 2.0") on the Electric Truck Battery Pack. The Electric Truck Battery Pack has been assessed to have a rated full capacity of 176 ampere-hours (Ah) (the "Rated Capacity"), as specified on the nameplate affixed to the Electric Truck Battery Pack. Initially, the Electric Truck Battery Pack was fully charged using a J1772 (Type 1) AC charging port, delivering 40 amperes (A) of current. This Level 2 AC charging step, consistent with North American EV standards¹, was managed by the vehicle's onboard systems. Once the dashboard displayed a 100 percent state of charge and the charger application indicated the vehicle was no longer requesting current, Prototype 2.0 initiated its patent-pending battery rebalancing process. A rebalancing current between 0 and 3 amperes was then individually applied to each of the battery cells, charging them simultaneously to a target voltage of 4.20 volts (the "Voltage Target"). The Voltage Target falls within the standard operating range for NMC lithium-ion cells (3.0V to 4.20V), with 4.20V commonly recognized as full capacity in the industry². The Results show that 66.3 Ah of capacity, previously lost due to battery-cell imbalance, was successfully restored on the Electric Truck Battery Pack. This represents approximately 37.7 percent of the Rated Capacity of the unbalanced Electric Truck Battery Pack. The restored capacity corresponds to the full theoretical rebalancing potential based on achieving the Voltage Target across all cells and reflects complete recovery of the significant imbalance identified. These results were validated using Prototype 2.0's integrated software feature, which measures ampere-hour capacity restored through rebalancing on a per-cell basis. The software also identified the maximum individual cell discrepancy to be 66.3 Ah, relative to the Rated Capacity. Battery X Rebalancing Technologies interprets these Results as confirmation of Prototype 2.0's ability to recover significant imbalance-induced battery-cell capacity loss through precise voltage alignment and active cell-level rebalancing. The expanded functionality development for the Electric Truck builds on a series of prior advancements by Battery X Rebalancing Technologies, as disclosed in the Company's news release dated May 9, 2025, which announced that Battery X Rebalancing Technologies had entered into a non-commercial, collaborative scope of services agreement (the "Factor E Agreement") with Factor E Motors Ltd., a Vancouver-based automotive service centre specializing in out-of-warranty Tesla vehicles. The Factor E Agreement is intended to support the continued development of Prototype 2.0, with an initial focus on Tesla Model 3 and Model X battery packs currently held by Factor E Motors. This progress was further advanced, as disclosed the Company's news releases dated May 23, 2025, and May 30, 2025, which announced the expansion of Prototype 2.0's development to include Nissan Leaf battery packs and confirmed the successful rebalancing of a naturally imbalanced Nissan Leaf battery pack. This achievement marked a key milestone in validating Prototype 2.0's compatibility with the #2 most common out-of-warranty electric vehicle model in the United States. Together, these initiatives underscore Battery X Rebalancing Technologies' commitment to demonstrating the adaptability of its technology across multiple real-world electric vehicle platforms and highlight the increasing demand for practical, cost-effective battery reconditioning solutions. Results Trial Parameter Value / Description Rated Capacity of Battery Pack 176.00 ampere-hours (Ah) Capacity Restored Through Rebalancing 66.3 ampere-hours (Ah) Capacity Restored of Rated Capacity as Percentage (%) 37.7% Imbalance-Related Capacity Recovery 100% Significance of Results & Market Opportunity for the Electric Truck The Results of the Trial demonstrate that Prototype 2.0 is capable of effectively rebalancing lithium-ion battery packs exhibiting significant, naturally occurring battery cell imbalance. This successful outcome builds upon prior validation of Battery X Rebalancing Technologies' patent-pending rebalancing technology, including independent validation by the National Research Council of Canada (as detailed below), and the Company's previously disclosed news release dated May 30, 2025 announcing successful rebalancing of naturally imbalanced Nissan Leaf battery pack, the #2 most common out-of-warranty electric vehicle model in the United States. Importantly, the Results not only confirm the technical functionality of Prototype 2.0 in a real-world electric vehicle platform, but also highlight its potential to restore substantial lost capacity-an outcome that supports the growing demand for practical, cost-effective battery recovery solutions. The Electric Truck Trial reinforces the relevance of Battery X Rebalancing Technologies' patent-pending Prototype 2.0 in real-world environments and signals a broader opportunity to extend the useful lifespan of aging electric vehicle battery packs. The Electric Truck and Electric Truck Battery Pack were provided at no cost to Battery X Rebalancing Technologies for testing and validation by an authorized Canadian distributor of the Electric Truck (the "Distributor"), who advised that it owns a fleet of approximately 20 Electric Trucks (the "Electric TruckFleet"). Several vehicles within this fleet have reportedly experienced significant capacity degradation due to battery cell imbalance. The expanded functionality development and subsequent Trial were initiated in response to the Distributor's interest in identifying a viable alternative to full battery replacement, which it noted could be prohibitively expensive. The objective of the Trial was to assess whether Prototype 2.0 could successfully rebalance a battery pack from the Electric Truck Fleet. The positive Results are expected to inform ongoing discussions with the Distributor regarding the potential deployment of Prototype 2.0 across its broader fleet to restore and extend battery life while mitigating potentially costly battery replacements. Further, the Company has been advised by the Distributor that approximately 700 Electric Trucks are currently deployed across Canada, owned by a combination of the Electric Truck's parent company, authorized dealers, commercial fleet operators, and private fleet owners. According to the Distributor, many of these vehicles have encountered similar battery pack capacity degradation attributed to battery cell imbalance. This highlights a market opportunity for Battery X Rebalancing Technologies to provide a cost-effective rebalancing solution for electric vehicle owners seeking to avoid premature battery replacement. In parallel with these developments, Battery X Rebalancing Technologies is advancing the implementation of standardized operating procedures (SOPs) for rebalancing the Electric Truck Battery Pack, along with user interface and workflow optimizations for Prototype 2.0. Battery X Rebalancing Technologies is also progressing efforts to formalize a commercial manufacturing agreement to support scalable production and deployment capabilities. These initiatives are part of a broader commercialization strategy and are not limited to any single third-party opportunity, with the exception of the Electric Truck-specific SOPs, which are being developed in direct response to the potential opportunity identified through the Trial. There can be no assurance that Battery X Rebalancing Technologies will establish commercial arrangements with any third party at this time. While the Company is encouraged by the progress to date and the evident market need, any future commercial arrangement remains subject to further validation, negotiation, and operational readiness. The Problem: Rising EV Adoption Presents New Battery Lifecycle Challenges In 2024, global EV sales reached approximately 17.1 million units, representing a 25% increase from 20233. With cumulative global EV sales from 2015 to 2023 totaling an estimated over 40 million units4, a significant share of the global EV fleet is expected to exit warranty coverage over the coming years. By 2031, nearly 40 million electric, plug-in hybrid, and hybrid vehicles worldwide are anticipated to fall outside of their original warranty coverage5,6. This projection is based on current EV adoption figures and standard industry warranty terms, and underscores a growing risk for EV owners facing battery degradation, reduced capacity, and costly replacement requirements7. As the global EV fleet continues to expand, the demand for technologies that extend battery life, reduce long-term ownership costs, and support a sustainable transition to electric mobility is increasing. The Solution: Pioneering Next-Generation Technologies to Support Lithium-Ion Battery Longevity Battery X Rebalancing Technologies' proprietary software and hardware technology aims to address this challenge by extending the lifespan of EV batteries. This innovation is being developed with the aim to enhance the sustainability of electric transportation and the goal to provide EV owners with a more cost-effective, environmentally friendly ownership experience by reducing the need for costly battery replacements. Battery X Rebalancing Technologies' rebalancing technology, validated by the National Research Council of Canada ("NRC"), focuses on battery cell rebalancing. The NRC validation demonstrated the technology's ability to effectively correct cell imbalances in lithium-ion battery packs, recovering nearly all lost capacity due to cell imbalance. The validation was conducted on battery modules composed of fifteen 72Ah LiFePO₄ cells connected in series. The cells were initially balanced to a uniform state of charge (SOC), with a measured discharge capacity of 71.10Ah. In the validation test, three of the fifteen cells were then artificially imbalanced-one cell was charged to a 20% higher SOC, and two cells were discharged to a 20% lower SOC-resulting in a reduced discharge capacity of 46.24Ah, following rebalancing using Battery X Rebalancing Technologies' rebalancing technology. These advancements establish Battery X Rebalancing Technologies as a participant in lithium-ion and EV battery solutions, aiming to tackle the critical challenges of capacity degradation of battery packs and expensive replacements. By extending the lifecycle of battery materials within the supply chain, Battery X Rebalancing Technologies aims to support the energy transition and promote a more sustainable future. 1 EVESC, 2 Battery University,3 Rho Motion - Global EV Sales 2024, 4 IEA Global EV Outlook 2024, 5 IEA, 6 U.S. News, 7 Recurrent Auto About Battery X Metals Inc. Battery X Metals (CSE:BATX)(OTCQB:BATXF)(FSE:5YW, WKN:A40X9W) is an energy transition resource exploration and technology company committed to advancing domestic and critical battery metal resource exploration and developing next-generation proprietary technologies. Taking a diversified, 360° approach to the battery metals industry, the Company focuses on exploration, lifespan extension, and recycling of lithium-ion batteries and battery materials. For more information, visit On Behalf of the Board of Directors Massimo Bellini Bressi, Director For further information, please contact: Massimo Bellini BressiChief Executive OfficerEmail: mbellini@ (604) 741-0444 Disclaimer for Forward-Looking Information This news release contains forward-looking statements within the meaning of applicable Canadian securities laws. Forward-looking statements in this release relate to, among other things: the continued development, testing, and optimization of Prototype 2.0; the expansion of its functionality to include additional electric vehicle platforms, including Class 3 light-duty commercial electric trucks; the Company's interpretation of preliminary trial results, including 100% imbalance-related capacity loss recovery and 37.7% increase of the Rated Capacity; the effectiveness of Prototype 2.0 in restoring lost capacity caused by battery cell imbalance; the relevance of the Trial in real-world operating conditions; the possibility of future commercial discussions with the Canadian distributor of the Electric Truck; the potential deployment of Prototype 2.0 across the distributor's Electric Truck Fleet; the estimated number of Electric Trucks deployed across Canada; the broader demand for rebalancing technologies to extend the useful life of electric vehicle battery packs; the scalability of Battery X Rebalancing Technologies' platform to meet market demand; the implementation of standardized operating procedures (SOPs) for Electric Truck rebalancing; user interface and workflow optimizations; and the progress toward formalizing a commercial manufacturing agreement to support scalable production and deployment capacity. These forward-looking statements reflect management's current expectations, estimates, projections, and assumptions as of the date of this news release. Forward-looking statements are subject to known and unknown risks, uncertainties, and other factors that may cause actual results, performance, or achievements to differ materially from those expressed or implied by such statements. Such risks and uncertainties include, but are not limited to: the ability to complete further testing and validation of Prototype 2.0; variability in performance across different battery chemistries or EV platforms; the timing, structure, and outcome of any potential commercial discussions or agreements with distributors or other fleet operators; customer and market adoption; the ability to scale production through third-party manufacturing; successful implementation of SOPs and software enhancements; regulatory developments; operational and logistical challenges; and the ability to execute commercial contracts and generate revenue. There can be no assurance that Prototype 2.0 will achieve full commercialization, that any commercial agreements will be entered into, or that Battery X Metals Inc. or Battery X Rebalancing Technologies will generate revenue from the initiatives described herein. The realization of any commercial opportunity remains subject to further validation, negotiation, third-party readiness, and successful execution of definitive agreements. Battery X Metals Inc. undertakes no obligation to revise or update any forward-looking statements to reflect future events or circumstances, except as required by applicable law. Investors are encouraged to consult the Company's continuous disclosure filings available under its profile at for additional risk factors and information. SOURCE: Battery X Metals View the original press release on ACCESS Newswire


Axios
2 days ago
- Axios
California high-speed rail project faces reckoning
California's high-speed rail project was billed as the future of transportation, but with President Trump moving to pull $4 billion in federal funds, its future remains precarious. Why it matters: The system was initially slated for completion in 2020. But because of funding challenges and other delays, construction has not started beyond the 171-mile segment in the Central Valley, which would connect San Francisco to Los Angeles and Anaheim. Driving the news: In a 310-page compliance review released this week, the Federal Railroad Administration (FRA) called the project a "story of broken promises." Citing mismanagement of budget shortfalls, missed deadlines, costly change orders, and the "lack of a credible plan" to close the $7 billion funding gap needed for the Central Valley segment, the FRA said it sees "no viable path" to a completed system. The California High Speed Rail Authority (CHRSA) has 37 days to respond to the review before the FRA moves to withdraw federal grants. The other side: The CHSRA said in a statement after the report's release that it "strongly disagrees with the FRA's conclusions, which are misguided and do not reflect the substantial progress made." It added, "The Authority will fully address and correct the record in our formal response." Sens. Adam Schiff and Alex Padilla also issued a statement calling the announcement "devastating" for Californians. Between the lines: One reason for the missed deadlines is a California policy that requires utility companies to review and approve relocation plans before public utility infrastructure can be moved to accommodate construction for a government project. The CHSRA inspector general said in a February assessment that there is "little incentive" for owners to do so in a timely manner and that CHSRA should instead work with legislators to revise state laws to minimize third-party delays. By the numbers: Spending for the project totals $14 billion, with 82% from the state and 18% from federal funds. The entire budget for the system is almost $100 billion higher than the original $33 billion estimate provided in 2008, when voters approved the ballot to initiate the project. Yes, but: Californians still largely support the endeavor. A recent Politico-UC Berkeley poll found that 67% of registered voters in the state back the project, compared to 33% who oppose. It's especially well-regarded in the Central Valley, where it's helped create more than 15,000 jobs, per the governor's office.