Adani Group to invest $100 bn, targets 100 GW total power capacity by 2030
Adani Group aims to set up 100 GW of power capacity by 2030 as part of $100 billion investment plans that will 'break all records', said the airports-to-energy conglomerate on Tuesday.
Adani Green, the group renewable company, aims to achieve 50 GW (gigawatt) of capacity and thermal power producer Adani Power 31 GW. The rest of the capacity will come from pumped hydropower. As of FY25, the group's thermal power capacity stood at 16.6 GW, while the renewable energy capacity was almost 15.2 GW.
'Our capital investment across businesses is set to break all records. These are not just investments in our group, but investments in the possibilities for doing our part to build India's infrastructure,' said Gautam Adani, chairman of Adani Group, at its annual general meeting.
The group will invest $15-20 billion annually in its companies, including airports. Adani Energy Solutions has got transmission orders of around Rs 44,000 crore in FY25 and is executing Rs 13,600 crore worth of smart metering projects.
Adani New Industries, which integrates renewable energy, hydrogen electrolyser and downstream anchor projects, aims to expand its solar module manufacturing lines and is expected to have a 10 GW integrated solar module manufacturing facility by FY27.
The ports business handled 450 million metric tonnes (mt) of cargo in FY25, and the group is creating a transport utility by venturing into marine, trucking, warehousing, and freight forwarding. 'In line with the Prime Minister's Gati Shakti Mission, our logistic assets are powering MSME exports and reducing friction to increase India's global competitiveness,' said Gautam Adani.
Adani Ports aims to handle 1 billion mtpa (million tonnes per annum) of cargo by 2030, with a planned capital expenditure of Rs 50,000 crore between FY25 and FY30. Its domestic capacity stands at 633 mtpa and operates overseas poets in Haifa (Israel), Dar es Salaam Port (Tanzania), Abbot Point (Australia) and Colombo West International Terminal (Sri Lanka).
Global turbulence
'The world around us has changed dramatically over the past 12 months. Over 60 nations went to the polls. Borders were redrawn, alliances tested, and economies shaken. In the Middle East, war continued to cast shadows on energy and logistics. In Europe, economic confidence stumbled. The United States had its own challenges. And yet, in the middle of all this noise, India stood apart and grew faster than any other major nation,' he said.
The group's natural resources business produced 47 million tonnes of coal and iron ore in FY25 and is estimated to achieve over 30 per cent growth by FY26.
For its cement business, the group achieved 72 per cent of its targeted capacity of 140 million tonnes per annum (mtpa) in FY25. It crossed the 100 mtpa mark during the year, with the full target expected by FY27–28.
In FY25, Adani Airports handled 94 million passengers and completed the first test flight at the greenfield Navi Mumbai Airport, worth $2.1 billion. The airport is expected to open later this year with an initial capacity of 20 million passengers, increasing to 90 million, giving the company a 35 per cent share of India's airport passenger traffic.
In FY25, the group's revenue grew by 7 per cent year-on-year and earnings before interest, taxes, depreciation and amortisation (ebitda) by 8.2 per cent. Total revenue stood at around Rs 2.71 trillion and adjusted ebitda at Rs 89,806 crore. The group's net debt-to-ebitda ratio remained at 2.6x, Gautam Adani said.
US allegations
About allegations against Adani Green Energy by the US Department of Justice and the Securities and Exchange Commission (SEC), Gautam Adani said the group is cooperating with legal processes.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
an hour ago
- Time of India
MCD to reintroduce PPP scheme for park maintenance in Delhi
New Delhi: The Municipal Corporation of Delhi intends to go back to the public-private partnership model for maintaining parks with a per-acre payment up to Rs 15,000. In the pre-unified era, the erstwhile south, north, and east municipal corporations had adopted this scheme, paying Rs 13,500 in south, Rs 8,000 in north, and Rs 8,500 in east Delhi for park maintenance. The programme was halted in 2022 when MCD couldn't settle payments under the scheme with the residents' welfare associations. "The proposed reintroduction of the PPP scheme has been sent for financial observations and will be placed in the standing committee soon," said an MCD official on Tuesday. The civic body currently has outstanding dues of Rs 16 crore on this account and instructions have been given to process the payment after receiving updated bills from RWAs. The three zones of Rohini, Keshavpuram and Narela account for around Rs 10 crore of the dues since 2019. "Due to lack of budgeting in the previous years, the pending payments could not be processed. However, the matter is under active consideration and pending dues will be cleared, subject to availability of funds," said the official. You Can Also Check: Delhi AQI | Weather in Delhi | Bank Holidays in Delhi | Public Holidays in Delhi The municipal bodies had enlisted 222 RWAs in adopting 1,315 parks under the programme. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 파고다어학원 초특가 할인 파고다어학원 더 알아보기 Undo The initiative, launched more than a decade ago, was aimed at encouraging local participation in maintaining neighbourhood parks while addressing recurring problems related to the green spaces arising from MCD's irregular staffing, said officials. "Due to bills remaining unpaid for 2-3 years, RWAs were in a quandary, unsure whether to terminate their contract or continue under the present circumstances. Some RWAs were lucky to have bills till Dec 2023 settled, though it took them dogged pursuance," disclosed an RWA member from East of Kailash. RWAs claimed that MCD lacked even the resources and personnel to remove green waste from parks or the equipment for basic pruning and mowing. Some RWAs are still paying from their own funds to maintain the parks, fearing that a break in maintenance will cause their deterioration. MCD officials revealed there is a plan under way to transfer parks bigger than three acres to private concessionaires for upkeep. "In Karol Bagh zone, we launched a pilot project and called applications from expert agencies to maintain 41 parks. The pilot phase involves allocating 94 acres of land to an agency responsible for engaging staff and planting trees at an estimated cost of Rs 3.6 crore," said an official. Similar steps will be taken in the other 11 zones where the selected agency will be responsible for maintaining greenery, cleaning and sweeping the lawns regularly and transporting the green waste to the waste processing centres. Plants will be provided by MCD from its nurseries.


The Print
an hour ago
- The Print
Leverage AI to search for job opportunities across globe for Andhra youth: Naidu to officials
'Leverage Artificial Intelligence in the state's skill portal 'Naipunyam' to identify and consolidate job openings not just within Andhra Pradesh but across India and international markets,' said Naidu in an official press release. Reviewing the skill development department at the secretariat, the chief minister noted that it has to work towards providing 20 lakh jobs to the state's youth. Amaravati, Jun 24 (PTI) Andhra Pradesh Chief Minister N Chandrababu Naidu on Tuesday directed officials to utilise artificial intelligence (AI) to search for job opportunities available in the state, country and across the world to host that information on 'Naipunyam' website, which can be accessed by the youth of the state. The portal will also feature an automated resume builder, generating professional profiles for registered candidates based on their qualifications. The CM emphasised that skill training must align with emerging technological advancements and global industry requirements to ensure employability. To directly link job seekers with employers, the government will organise large-scale job fairs, with the immediate goal of facilitating 1,500 placements per constituency this year, said the press release. The state government has already secured commitments for Rs 9.5 lakh crore in investments that are projected to create 8.5 lakh jobs. PTI STH AMJ AMJ This report is auto-generated from PTI news service. ThePrint holds no responsibility for its content.


The Print
an hour ago
- The Print
Uttar Pradesh trying to make village panchayats self-reliant: CM Adityanath
Adityanath said that to create a self-reliant state that contributes to India's self-reliance, Uttar Pradesh has adopted a bottoms-up approach. The state is trying to make the village panchayats self-reliant by providing employment to 5-7 people in each. Speaking at the 25th Central Zonal Council meeting held in Varanasi, Adityanath said, 'Operation Sindoor, a symbol of the indomitable valour of Indian soldiers, has introduced to the world the resolve and strength of the 'New India'. The last 11 years, dedicated to service, good governance and welfare of the poor under the successful leadership of Prime Minister Narendra Modi, gives us a new inspiration.' He said that the Prime Minister's exhortation to work as 'Team India' to make the country developed by 2047 shows a new path to cooperative federalism, and under the guidance of Union Home and Cooperation Minister Amit Shah, the regional councils are moving forward in this direction with full vigour. Lucknow, Jun 24 (PTI) India has created a new identity in every field in the last 11 years, Uttar Pradesh Chief Minister Yogi Adityanath said on Tuesday. Gram Sachivalaya, Model Fair Price Shop (Annapurna Bhawan), BC Sakhi, Self-Help Group, Caretaker for maintenance of community toilets and Consulting Engineer — all would become medium for self-reliance and employment generation at the panchayat level, he said. The chief minister said that more than 330 services are being delivered online through Gram Sachivalayas and all villages are covered with banking facilities. He said that Uttar Pradesh ranks first in the country in terms of the implementation of Pradhan Mantri Jan Dhan Yojana and about 40,000 BC Sakhis have made financial transactions worth over Rs 36,600 crore. For the safety and convenience of working women, Adityanath said, eight working women's hostels are being constructed. Under the Chief Minister's Shramik Ahilyabai Holkar Women's Hostels Scheme, construction of hostels have been proposed in seven districts. With the aim of improving secondary education, Project Alankar is being run for government secondary schools. Loans worth Rs 3,132.06 crore were distributed to 3.76 lakh farmers at 3 per cent interest through Primary Agricultural Credit Society committees in the cooperative department, he said. The power generation capacity of the state was 15,916 Mega Watts (MW) till 2017, which increased by 8,952 MW to 24,868 MW during the tenure of the current government, Adityanath said. Planned action was taken keeping in mind the future needs of the cities, he said, adding that currently 89 master plans have been approved. PTI NAV MAN RUK RUK This report is auto-generated from PTI news service. ThePrint holds no responsibility for its content.