Every child will have a place to play at Majette Park
BAY COUNTY, Fla. (WMBB) – The county has spruced up a section of Majette Park that's sure to see a lot of activity in the future.
Today workers wrapped up a 4-day build, putting the finishing touches on a new high quality, creative playground.
The whole process took about five months from the time the county received the grant money to the final product.
Ecuadorian students receive J-1 work visa to work during Spring Break in PCB
The playground is diverse and has wheelchair-accessible components like swings. County officials say they wanted to make sure every child has a space to play.
'We wanted to make sure that everybody could use it. That's why we had some ADA equipment installed here as well, to allow people in wheelchairs to be able to come out and enjoy this as well. It's a lot of green space out here. There's a lot to do. And there's like I said, there's going to be a lot of growth here in the near future,' said Parks Division Manager, Vincent Martin.
The nearly 5-thousand-square-foot playground will be open tomorrow for kids to enjoy. And there's something in the works for parents too. The park will have benches, concrete pathways, and shaded structures shortly.
Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time Business News
5 hours ago
- Time Business News
The Hidden Engineering Behind a Perfect Sign Install
It's 4:45 a.m., and a low hum rises in the chilled morning air as a bucket truck extends toward a blank wall downtown. The crew is silent, synchronized. Tools clink. A level hovers like a compass. What looks like the final moment to a passing pedestrian—the unveiling of a new building sign—is actually the result of meticulous planning, design, and coordination. This is the part of signage no one talks about. Forget the logo for a second. Before the letters shine or the directional arrows point, there's a silent choreography happening beneath the surface. Welcome to the unglamorous but essential world of the sign install. Most people associate signage with design: the font, the colors, the message. But sign installation is its own discipline—one rooted in engineering, logistics, and on-the-ground decision-making. Installing a sign isn't just about putting something on a wall. It's about: Accounting for wall materials and structural integrity. Ensuring compliance with city codes. Managing visibility from a distance and in varied lighting. Navigating access constraints, from tight hallways to multi-story exteriors. This level of technical precision separates the professionals from the weekend DIYers. Before a single bolt is drilled, installers consult architectural drawings, elevation plans, and hardware specs. Site surveys happen weeks before install day. Load calculations are checked. Electrical pathways are planned for illuminated signs. Even a basic sign for ADA compliance—say, a bathroom label—must be mounted at a very specific height and distance from the doorframe. Precision matters. These are the silent cues that help people feel confident in a space, especially those with visual impairments or mobility challenges. The best sign companies know that a seamless experience begins long before arrival. Metal, glass, acrylic, wood—each surface responds differently to fasteners and adhesives. A sign attached to brick might require expansion anchors. One installed on drywall may need backer plates. And then there's the weather. Exterior installations in places like Raleigh must account for extreme humidity, UV exposure, and temperature shifts that cause materials to expand and contract. Choosing the right mounting system isn't just about looks—it's about durability. Companies like DesignElement Raleigh understand that longevity begins with the right material pairing and a climate-aware install. There's a delicate balance in positioning: how to make a sign visible without violating regulations or architectural harmony. For example: A corporate lobby wants a logo at eye level, but what if the wall backs into glass? A directional sign in a parking structure must be visible from moving vehicles—but not too low to obstruct pedestrian flow. Then there's accessibility. ADA signs must follow precise guidelines—typically installed 48 to 60 inches from the ground and adjacent to the latch side of a door. Misplacing even one element could make a building non-compliant. The installer becomes the final gatekeeper of legal and visual alignment. Large signage—especially those on multi-story buildings or open campuses—requires heavy equipment. Cranes, scissor lifts, or even helicopters have been used in major installs. But even small-scale projects demand smart tools: cordless drills with torque control, stud finders, laser levels, and non-abrasive adhesives for sensitive materials. It's a physical process, yes, but one built on finesse and experience. Time also matters. Install crews often work odd hours—overnight or early morning—to avoid disrupting business or traffic. And one mistake can cost more than just time: damaging a building facade or misaligned placement might mean replacing the entire sign. Once the sign is up, there's one last test. Step back. Now pretend you've never been here before. You've just pulled into the lot. You don't know where to go. Can you see the entrance sign? Does the arrow make sense? Would someone in a wheelchair find their way easily? This walk-through is more than symbolic. It's a final quality check to confirm that visibility, legibility, and logical flow align with real-world use. Great signage doesn't just deliver information—it removes confusion. Here's the paradox: a perfectly installed sign is one you don't notice. It works so well, so naturally, that no one thinks twice. That's the sign installer's true reward—not recognition, but seamless integration. Behind every wayfinding system, room placard, and brand mark is a series of choices made by people who think five steps ahead. They sweat the millimeters so visitors don't have to. And while the design process might win awards, it's the behind-the-scenes expertise that makes the sign stay secure, readable, and relevant for years. Every building tells a story. Signs are part of that story—but only if they're installed with purpose and care. That's why thoughtful, code-compliant, and professionally installed signage remains one of the most important parts of any physical environment. Done well, it vanishes into the background while guiding, informing, and welcoming every visitor. For companies like DesignElement Raleigh, it's about much more than hanging a sign. It's about building trust—silently, securely, and expertly. TIME BUSINESS NEWS
Yahoo
2 days ago
- Yahoo
Placer County to remove lead from former gun range near Lincoln housing developments
Placer County supervisors have approved a plan to clean up a former law enforcement gun range in Lincoln, located across from the Sun City Lincoln Hills 55+ community. The $5.1 million project will remove lead and other debris and restore the soil to meet residential environmental standards. Roughly $750,000 has already been spent on assessments. The plan includes a $3.7 million budget for contracted labor and work is expected to begin later this summer, once a contract is awarded. The plan is expected to be completed by the fall. The board previously selected the residential cleanup option in 2022, following a presentation by Eric Findley, the county's real estate services manager. That method, which involves off-site storage of contaminated soil, was the most expensive of the proposed approaches but was recommended due to its long-term benefits. 'Cleaning up to residential standards and hauling it off-site is the most conservative (option) in the sense that it would provide the most flexibility for future use of the property,' Findley told the board. 'It would increase the value of the property and I think it would ... lessen the chance of litigation in the future.' The pricing estimates were developed by Sacramento-based Provost & Pritchard Consulting Group, which also prepared the project for contract bidding. The board approved a $400,000 contract extension for the firm as part of Tuesday's action. The county has owned the site since 1968. The gun and skeet ranges, once used to train police officers, have been closed since 1999. In addition to lead, the county's staff report notes the site includes bullet and clay pigeon debris that must be removed to meet residential standards. Supervisors Cindy Gustafson and Shanti Landon commended the Department of Facilities Management's work on the project, which has gone back to at least 2017. Landon, whose district includes Lincoln, commended the staff's efforts: 'It's very important for the Lincoln community that this remediation project move forward to ensure this site is safe for future generations,' said Landon, whose district includes Lincoln. Before Placer County developed the site into a police training range, it was home to a Cold War-era Titan-1 missile base. Built in 1962, the facility included three 160-foot-deep silos and miles of tunnels, which were later flooded and sealed. But the base also left behind trichloroethylene, or TCE, a cancer-causing solvent used to clean missile oxygen systems. The chemical was first discovered in the area's groundwater in 1991, according to previous Bee reporting. A Placer grand jury report last year found that 'nothing substantial' had been done to remove it and warned that the contamination plume had advanced roughly 150 feet toward Sun City Lincoln Hills. While the TCE leaks worried some residents of the Sun City development, data collected in July 2024 showed that monitoring probes near the closest homes show no signs of TCE. The Army Corps of Engineers resumed its feasibility study in 2018 and estimates a $26 million remediation effort could begin in 2027. The city of Lincoln supports an accelerated timeline, citing ongoing housing development nearby, according to previous Bee reporting. According to the county's development activity map, the area around the former range is rapidly developing. To the north is the under-construction, 233-unit Hidden Hills project. South of the site is the approved Waterfront project, which will include 271 rental units and 50,000 square feet of commercial space. Nearby is the proposed Village 1 Specific Plan, which has been in the works since 2013 and envisions more than 5,000 residential units, parks, mixed-use areas, and a golf course. Also on Tuesday, supervisors adopted a 2025-29 housing action plan with goals to increase the county's supply of 'achievable housing,' preserve housing stability and secure long-term funding. The plan sets a target of 1,300 new housing units by mid-2029. According to the county, Placer's median home price is about $665,000, while the median household income is $108,000. 'We incorporated a lot of great feedback from the board into our updated plan to consider potential community impacts and outcomes across Placer's unique regions,' Housing Manager Nikki Streegan said in a statement. 'This plan advances broad priorities like economic development, infrastructure and strategic collaboration with our partners from the state and throughout the region.'
Yahoo
2 days ago
- Yahoo
Groundbreaking held for Grandmothers' Garden outdoor classroom pavilion
WESTFIELD — Mayor Mike McCabe, Ward 3 Councilor Bridget Matthews-Kane, School Committee member Kathleen Hillman, board members and friends of the Grandmothers' Garden performed a ceremonial groundbreaking on Wednesday for the new outdoor classroom pavilion set to begin construction this week. Friends of Grandmothers' Garden board member Allen Steiger thanked everyone involved in helping to get the project to this point, singling out the mayor, councilors, the Conservation Commission and all of the volunteers. 'More to come as this takes place,' he said. Jackie McDowell, outreach coordinator for Grandmothers' Garden, said the silt fence will go up later this week, and excavation will begin next week by R.A. LaPlante Construction and Rob Levesque of R. Levesque Associates, architect. McDowell said the Westfield Technical Academy's horticulture department will be doing the landscaping and planting design, under department head Nate Sperry. McDowell said the project should be completed, including an attached restroom, by September or October. In February, the City Council unanimously approved the Community Preservation Commission's funding of $528,200 for the new outdoor classroom pavilion and rest area at Grandmothers' Garden, which sits in a portion of the 10-acre Chauncey Allen Park. At the groundbreaking, McDowell said the project is a wonderful collaboration with Westfield Public Schools. The 30-by-40-foot wood pavilion will be used by local schools for nature-based programs, STEM instruction, arts, photography and community field trips. For Westfield Technical Academy across the street, they foresee class instruction for students of horticulture, construction, technology, history, science and environmental studies; and for Westfield State University, for students and faculty who are pursuing biology studies, visual arts education, environmental sciences and urban planning to use the facility. The pavilion will also be available for private classes, social and special events, small gatherings, picnics, meetings and reunions. At the groundbreaking, McDowell said the project is a wonderful collaboration with Westfield Public Schools. Elementary school STEM Coach Lindsey Ayers, also present at the groundbreaking, said with both the Westfield River and Highland elementary schools nearby, the new outdoor classroom will be a wonderful setting for studies students are already conducting on erosion and ponds. 'Doing those activities over here in an actual environment, and being able to bring students here to do projects, is really going to enhance their [education].' An ADA-compliant restroom will be built on one end of the pavilion classroom, and a paved area for seating, just outside the other end. 'A lot of people put in a lot of work, so we're thankful,' said Friends of Grandmothers Garden board member Dan Florence. 'We're looking to grow the community of Grandmothers' Garden with what we're doing here. It's gorgeous — one of the best kept secrets in Westfield,' he added. 'I'm just thrilled. It's going to make this space even more available to the community. It's a wonderful addition,' said Ward 3 Councilor Bridget Matthews-Kane. Read the original article on MassLive.