
State govt to launch Space Park project on Thursday
T'puram: The foundation stone for Kerala's ambitious Common Facility Centre (CFC) and Research & Development Centre (RDC) as part of the Space Park project will be laid on Thursday.
The event will be held at the Hyatt Regency, Thycaud, in the capital. Chief minister
Pinarayi Vijayan
will inaugurate the event. Organized by Kerala Spacepark (KSPACE), the event marks a significant step in boosting the state's aerospace and defence sectors.
Spanning 15.06 acres in Pallippuram, the project is backed by
Nabard
and aims to provide shared facilities for testing, inspection and innovation. The two-day event will also feature exhibitions, startup pitching sessions and industry-academia interactions.
Various sponsorship and exhibition opportunities are open to institutions and startups.
Registration for delegates and students is now open. The tender for the Space Park was awarded to Ircon International Ltd, a Govt of India undertaking institution under the ministry of railways.
The project was granted a Rs 241 crore loan from Nabard for the construction of the buildings and the campus. The tender was called by the Kerala State IT Infrastructure Ltd to construct two key buildings—the CFC and RDC. The estimated completion of the project is 30 months. The new facilities will be built on 3.5 acres of the 18.5 acres allotted by state govt at Technopark Phase IV in Pallipuram.
Currently, the Space Park office operates from a rented building in Pattom. The R&D facility will feature startup incubators and other research amenities.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
32 minutes ago
- Indian Express
Maharashtra: Feasibility study on water taxi routes in MMR presented; estimated capital cost Rs 2,500 crore
A techno-economic feasibility study for water taxis in the Mumbai Metropolitan Region (MMR) was presented to the state government on Monday with a plan of operating 10 routes totalling 252 kilometers with an estimated capital cost of Rs 2,500 crore. During the meeting, a discussion was also held on starting additional water taxi routes on Mumbai's Western seafront. Among the 10 routes proposed in the report include, Narangi – Kharwadeswari near Virar (1 km length), Vasai – Mira Bhayandar– Fountain Junction –Gaimukh– Nagale (16 km), Kalher–Kolshet– Mulund–Aeroli– Vashi– DCT – Gateway (50 km ), Gaimukh-Kolshet– Kalher– Mumbra– Kalyan (31 km), New airport-Belapur-Vashi (14 km), Vasai– Marve– Nariman Point (61 km), Borivali– Gorai– Essel world- Marve- Manori (6 km), Rewas- Karanja- Gateway (19 km), Belapur-Gateway-Mandwa (38 km) and Gateway-Elephanta-Nhava (17 km). The report was drafted by the Kochi Water Metro and presented to state Ports Minister Nitesh Rane. According to an official present at the meeting, the government has decided to increase the number of routes before going ahead with the Detailed Project Report (DPR). 'The study does not include key Mumbai routes such as Worli, Juhu and Varsova. It will be added and the DPR of this project will be prepared,' the officer said. Out of these routes, five are projected to be financially viable after 2029 and two would require Viability Gap Funding (VGF) by the government to turn viable. While Rs 2,500 crore was estimated as the capital cost, for the upgrade of existing water transport terminals, the estimated cost is Rs 5 crore per terminal. As per the report, by 2031, the realistic number of trips on these routes will 2.44 lakh while in 2041, it will be 3.42 lakh. Among the civil infrastructure requirements, the study report has listed terminals or jetties with passenger amenities, floating pontoons and gangways, boatyards for vessel maintenance and repairs, night parking and fueling jetties, development of access roads and parking facilities and non-motorised transport (NMT).


Time of India
34 minutes ago
- Time of India
CM releases Rs 561 cr relief for over 11,000 families that lost breadwinners
1 2 Ambedkar Nagar: Chief Minister Yogi Adityanath released Rs 561.86 crore to 11,690 families who lost their primary breadwinners, under the Mukhyamantri Krishak Durghatna Kalyan Yojana on Monday. While the CM personally handed the amount to beneficiaries in Ambedkar Nagar, the govt released this amount to all beneficiaries across 350 tehsils in the state. E xpressing grief at the deaths, Yogi said his govt would do whatever necessary for farmers and their families. He said that there was no budgetary limitation to the scheme and more beneficiaries will continue to receive assistance as the year progresses. "Earlier, only the farmer was eligible for benefits under this scheme; the policy has been revised and sharecroppers, agricultural labourers, and family members of farmers who fall victim to disasters such as fire, storms, lightning, or floods are also covered under it. The government now provides Rs 5 lakh assistance per family in such cases," he Monday, Yogi provided financial assistance to 431 families in Ambedkar Nagar for 2025–26. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch CFD với công nghệ và tốc độ tốt hơn IC Markets Đăng ký Undo Of these, 408 individuals received Rs 5 lakh each, 10 were given Rs 2.5 lakh, one family was granted Rs 1.25 lakh, and 12 beneficiaries received Rs 1 lakh each. The total assistance amount of approximately Rs 21 crore was directly transferred to the beneficiaries' bank accounts through Direct Benefit Transfer. The Mukhyamantri Krishak Durghatna Kalyan Yojana came into effect on September 14, 2019. The CM said that in 2020-21, the government issued Rs 500 crore to 11,275 dependents. In 2021–22, assistance of Rs 600 crore was provided to 13,645 families. In 2022–23, Rs 650 crore was provided to 15,231 families. In 2023–24, 23,821 families received support of Rs 950 crore. In 2024–25, the amount was raised to Rs 1,000 crore, benefiting 25,575 dependents. In 2025–26, the fund was further increased to Rs 1,050 crore, which is currently benefiting 11,690 10 districts benefited under the scheme


Time of India
38 minutes ago
- Time of India
Banks may go for short-term G-Secs with CRR cut in Sept
ET Intelligence Group: Short-term government securities (G-Secs) are likely to report an uptick in demand with banks expected to park a chunk of their excess funds in these papers soon after the cash reserve ratio (CRR) rate cut, which will be implemented from September, injecting additional liquidity into the system. Muted credit demand and volatile bond yields may prompt banks to favour safer, short-duration instruments such as treasury bills (with maturities of less than a year) and G-Secs in the one and three-year range. "Banks are unlikely to channel the entire surplus liquidity arising from the CRR cut into the credit market immediately," said V Ramachandra Reddy, head of treasury at Karur Vysya Bank . "In the interim, to manage credit risk prudently, banks are expected to deploy a part of excess liquidity into government securities." by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Elegant New Scooters For Seniors In 2024: The Prices May Surprise You Mobility Scooter | Search Ads Learn More Undo On June 6, the RBI announced to reduce the CRR by 100 bps, releasing nearly ₹2.5 lakh crore to banks in a phased manner. This move aims to accelerate the transmission of repo rate cuts, making loans more affordable and reviving sluggish credit demand. However, bankers note that credit demand typically responds with a lag, with the full impact of a policy rate cut taking anywhere from six months to a year to materialise. Agencies Bonds Corner Powered By Banks may go for short-term G-Secs with CRR cut in Sept Following the anticipated CRR rate cut in September, banks are expected to increase their investments in short-term government securities due to muted credit demand and volatile bond yields. Banks will likely allocate a portion of the surplus liquidity into safer, short-duration instruments like treasury bills and short-term G-Secs to manage credit risk prudently. RBI accepts bids worth Rs 9,296 crore in switch auction India bond yields in narrow range as traders eye cues from oil, Fed How will RBI's STRIPS facility impact insurance companies? RBI cancels 30-year green bond auction amid high bids Browse all Bonds News with Credit growth has slowed, falling to 11% in FY25 from 20% in FY24, according to the RBI data. The trend has continued this year, with credit growth dropping to 8.9% in May from 11.4% in January. "To manage excess liquidity, banks may choose to park some funds in short-term papers until credit demand picks up," said the head of treasury at a private bank. "Once loan demand revives, these investments can be liquidated and redeployed into advances." Live Events The recent hardening of bond yields-following the RBI's shift in monetary policy stance from accommodative to neutral-has made the case stronger for short-duration securities. The yield on the 10-year benchmark government bond rose to 6.37% on June 12 from 6.25% on June 5. To mitigate potential price risk from rising yields, banks are expected to favour treasury bills and other short-term instruments. If market believes bond yields have bottomed out, banks will remain cautious about duration risks and prefer low-duration instruments. "At this juncture, staying at the shorter end of the yield curve appears to be a more prudent strategy," said Reddy. Alternatively, some funds may be parked in the RBI's standing deposit facility, which currently offers a risk-free return of 5.25%. According to experts, the release of liquidity is strategically timed with the festive season, a period marked by increased credit demand. "The funds will be released in phases starting from September. This is the time when credit demand increases due to festive demand," explained Madan Sabnavis, chief economist at Bank of Baroda .