logo
Lloyds Engineering receives order of Rs 20.67 cr from Cochin Shipyard

Lloyds Engineering receives order of Rs 20.67 cr from Cochin Shipyard

Lloyds Engineering Works announced the receipt of order for naval equipment from Cochin Shipyard. The order, valued at Rs 20.67 crore, encompass Fin stabilizer systems. The aforesaid order in respect to Next Generation Missile Vessel, signify the company's proactive stance in capturing the increasing demand resulting from the government's heightened defence spending. As new ship orders continue to rise, the order received by Lloyds Engineering serve as a promising beginning in leveraging the opportunities presented by this trend.
During the past 14 months, Company has received orders for more than Rs 130 crore in defence sector. These orders underscore Lloyds Engineering's unwavering commitment to innovation and excellence in the defence sector. They not only signify a substantial revenue boost but also represent the company's strategic shift towards emerging sectors, aligning perfectly with its vision for the future.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

UP leads with 42% of country's access-controlled e-way network
UP leads with 42% of country's access-controlled e-way network

Time of India

time27 minutes ago

  • Time of India

UP leads with 42% of country's access-controlled e-way network

1 2 3 4 Lucknow: After the inauguration of the 91-km long Gorakhpur Link Expressway on Friday, Uttar Pradesh now accounts for 42% of the country's total access-controlled expressway network, up from 38%. Once the under-construction 594km long Ganga Expressway from Meerut to Prayagraj is inaugurated, UP will be able to boast of having 62% of the country's access-controlled expressway network, a govt spokesperson said. "There are other expressways that are under construction in the state and the govt has approved several new ones as well," he said. Chief secretary Manoj Kumar Singh said that out of 2,900km of access-controlled expressways across the country, UP alone has access-controlled expressways spanning 1,200km. "The construction of Gorakhpur Link Expressway not only crossed geographical barriers but is also set to transform the socio-economic landscape of Purvanchal. Total Rs 7,200 crore was spent on its to build, with Rs 3,400 crore spent on its construction and the remaining amount was allocated for land acquisition and other expenses. For this, 1,100 hectares of land were acquired from 22,000 farmers," he said. Gorakhpur Link Expressway is the seventh expressway in UP. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch CFD với công nghệ và tốc độ tốt hơn IC Markets Đăng ký Undo Apart from this, three are under construction and eight are proposed. Those under construction are the 594-km long Ganga Expressway, the 35-km long Ballia Link Expressway, and the 63-km long Lucknow-Kanpur Greenfield Expressway. Other major projects include Chitrakoot Link Expressway, which will connect the Agra-Lucknow Expressway to Purvanchal Expressway and the Bundelkhand Expressway via Farrukhabad, and a link expressway connecting the Ganga Expressway and Jewar Airport Link Expressway.

ITI courses remain popular, 1.2L apply for admissions
ITI courses remain popular, 1.2L apply for admissions

Time of India

time27 minutes ago

  • Time of India

ITI courses remain popular, 1.2L apply for admissions

Pune: Over 1.2 lakh students have applied for Industrial Training Institutes (ITI) with an intake capacity of 1.4 lakh seats this year. Applications are 10% higher in state-run ITIs as compared to private institutes. Over the past 5-6 years, ITIs have seen a rise in demand due to work opportunities. A guaranteed apprenticeship after completion of the three-year course has raised the bar. Experts said that better job opportunities after course completion, direct second-year entry to engineering courses and new-age courses in artificial intelligence, machine learning, robotics and the traditional electronic, mechanical, and information technology diploma courses were the main drivers for students to pick ITI. Directorate of Vocational Education and Training (DVET) has also announced a revised schedule for admissions to ITIs. Students can now submit their online applications till June 26. So far, over 1.39 lakh students have registered for ITI admissions, of which 1.25 lakh have completed and submitted their applications. This admission process covers 1,007 ITIs across the state, including 419 govt-run and 588 private institutes. The online application process began on May 15 . The first merit list will be out on July 9, followed by the first round of admissions between July 10 and 15. Subsequent admission rounds will go on till Aug with the final institute-level counselling round on Aug 21. Suresh Kadu, retired principal of a govt ITI in Pune, said, "Students opt for diploma, technical courses, skill-based course or vocational education after SSC. The demand for students with ITI diplomas is high in the market for a skilled workforce. Students also want these short-term courses and there is job waiting at the end of it." Affordable fees are another attraction. They range between Rs 15,000 and Rs 16,000 for govt-run institutes and private institutes charge around Rs 25,000. Student Vishal Jadhav said, "I will set up my startup in mechanics. My uncle has been in the business for over 20 years. The ITI course will qualify me to set up the business." Key Dates For Students Last date for online application I June 26 Application confirmation and preference filling I June 27 Provisional merit list I June 30 Objection submission deadline I July 1 Final merit list I July 3 First admission list I July 9 First round of admissions I July 10–15 Second round I July 23–28 Third round begins I July 28 onwards Fourth round I Aug 4–8 Institute-level counselling I Aug 21

CBI books Tata Consulting Engineers, JNPT officials for alleged running of cartel
CBI books Tata Consulting Engineers, JNPT officials for alleged running of cartel

Time of India

time28 minutes ago

  • Time of India

CBI books Tata Consulting Engineers, JNPT officials for alleged running of cartel

MUMBAI: The Central Bureau of Investigation ( CBI ) has booked the project manager of Tata Consulting Engineers (TCE), the chief manager of the Jawaharlal Nehru Port Trust ( JNPT ) and unknown officials for allegedly causing a loss of Rs 800 crore to the exchequer by running a cartel and awarding contracts to selected international bidders. According to a first information report (FIR) filed earlier this week, Sunil Kumar Madabhavi, the chief manager (PP&D) of JNPT at the time, in conspiracy with Devdutt Bose, the then project manager of TCE, a Tata Group company, allowed complementary bidding in the tendering process. By doing so, they allowed the formation of the joint venture by the solely eligible bidders - Boskalis Smit India LLP and Jan De Nul Dredging India (also known as BSI-JDN JV). The agency has alleged that the Competition Commission of India guidelines were violated in the process. The FIR adds that a shadow bidding arrangement was put in place to support the cartel formed by Boskalis Smit India and Jan De Nul Dredging India. It said "this was allowed by Madabhavi in connivance with Bose, project manager from M/s TCE and other unknown persons, thereby allowing the said cartel to participate in the bidding process for capital Dredging Phase-ll through their joint venture namely BSI-JDN JV." ET has seen a copy of the FIR. It also said that payments amounting to Rs 348 crore in phase-ll for work already executed in phase-l, without actually performing the work, was paid, thereby causing undue advantage to BSI-JDN JV. The dredging work was carried out in two phases - Capital Dredging Project Phase I and Capital Dredging Project Phase Il. The CBI has mentioned the period of the scam as 2003 to 2019, when the two phases were executed. The FIR said "several stringent Project Qualifications (PQ) criteria and tailor-made specifications were inserted in the tender documents of Phase - ll to eliminate the Indian bidders from the competition and to the advantage of the international bidders".

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store