Portion of Tom McCall Waterfront Park will be revamped following design competition
PORTLAND, Ore. () — A portion of Portland's Tom McCall Waterfront Park could get a major makeover in the coming years.
Leaders of the Oregon Metro, the regional agency serving Clackamas, Multnomah and Washington counties, has allocated a $750,000 Planning and Development Grant to Portland Parks & Recreation. The award will go toward revitalizing the waterfront's bowl section, located 'between RiverPlace and the Marina, south of the Hawthorne Bridge on the west side of the Willamette River.'
North Portland dumpling spot XLB will permanently shutter in April
City officials are launching a competition that asks consultants from near and far to develop a design for the new-and-improved park, which is expected to host more outdoor entertainment and cultural events.
The grant backing the competition, which is slated to span across two and a half years, comes from Metro's construction excise tax. The tax is assessed at 0.12% of the total value of improvements for different building permits in the tri-county area.
According to the parks bureau, the grant was also a joint effort between the City of Portland and its partners at the Portland Waterfront Pavilion and the Human Access Project — with both organizations aiming to increase access and programming at the waterfront.
'We feel the public is ready for a conversation around revitalizing the Tom McCall Bowl from an underutilized space to a world-class amphitheater and 'toes in the water' river park,' Human Access Project Founder and Executive Director Willie Levenson said in a . 'The objective is to create an iconic Portland park that is both a transcendent event space and green space that leverages its connection to the river — Portland's blue space.'
PDX flights to London cancelled after fire causes power outage at Heathrow Airport
The redevelopment competition will seek proposals that are ADA accessible, integrate public access to the water with a new design of a Willamette River beach and shoreline, and are environmentally sustainable.
Additionally, the design should feature an outdoor stage and connect the river to Portland's downtown core.
Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
2 days ago
- Yahoo
Columbus Government issues public meeting notice for major upcoming roadway projects
COLUMBUS, Ga. () — The Columbus Consolidated Government has issued a public meeting notice to provide details and gather feedback on two major infrastructure projects. The meeting will be on Monday, June 9 from 4:00 to 6:00 p.m. at the Annex Building located at 420 10th Street. Street Rehabilitation – Broadway from 4th to 5th StreetThe project consists of upgrading the sanitary sewer and stormwater collection system. Other local utility systems will be able to upgrade their systems at this time. The existing brick pavers will be removed and replaced as part of this project. Driveways and sidewalks will be reconnected during this project. 8th Street Improvements from Front Avenue to Veterans ParkwayThe purpose of this project is to implement traffic calming measures to make 8th Street more pedestrian friendly. The proposed improvements include raised crosswalks in all four directions at the intersection of 8th Street and 1st Avenue and the intersection of 8th Street and 3rd Avenue. A mini roundabout is proposed at the intersection of 8th Street and 2nd Avenue. Additionally, ADA accessible curb cuts (aka wheelchair ramps) will be installed or modified throughout the project limits, and sidewalk connectivity to bus stops will be added. All work will take place within existing right of way limits, and traffic calming measures will take place within the existing curb lines. Proposed construction materials (i.e. colored concrete, pavers, etc.) will be installed to resemble the colors and patterns of existing materials in the Columbus Historic District. The City encourages all residents, business owners, and stakeholders to attend the meeting, learn about the upcoming improvements, and share their feedback. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Yahoo
3 days ago
- Yahoo
Atlas Door Repair Expands 24/7 Emergency Services to Serve Commercial Centers Across Illinois and Florida
Strategic multi-city expansion improves emergency response times and compliance for automatic and sliding doors in underserved regions PLAINFIELD, Ill. and LAKELAND, Fla. and INTERLACHEN, Fla., June 6, 2025 /PRNewswire/ -- Atlas Door Repair, a leader in commercial automatic and sliding door repair, announced its 24/7 emergency services across three key markets: Plainfield, Illinois; Lakeland, Florida; and Interlachen, Florida. This move strengthens the company's ability to provide rapid-response door repair for businesses in fast-growing commercial zones that have historically lacked qualified specialists. "We're solving a critical problem for property managers," said Sofia Torrentt, Operations Director at Atlas Door Repair. "When a sliding or automatic door fails, it's not just an inconvenience—it's a security issue, a liability, and a potential ADA violation. Our local teams can now respond in under 30 minutes in most cases." Each of Atlas's new service centers is staffed with certified technicians trained in ADA compliance, fire-rated hardware, and advanced automatic door systems, including hospital and retail systems. Targeted City Coverage The Plainfield, Illinois hub will serve Naperville, Oak Brook, Schaumburg, and Rosemont—suburbs with dense commercial infrastructure. In Central Florida, the Lakeland team supports the Winter Haven to Brandon corridor. The Interlachen office now services Northeast Florida, including Palatka, Green Cove Springs, and Gainesville. "Florida's humidity, wind loads, and seasonal spikes in traffic stress door systems," explained David Torrentt, Technical Director. "We're seeing an increase in roller failures, track corrosion, and sensor issues in hotel and medical facilities especially. Our team is trained to fix it all." Services Provided at All Locations: 24/7 emergency repair for sliding and automatic doors ADA compliance inspections and upgrades Hollow metal door repair and retrofits Preventive maintenance programs for commercial property managers Locations and Service Area Pages: Plainfield, IL: Lakeland, FL: Interlachen, FL: About Atlas Door Repair: With over 30 years in the industry, Atlas Door Repair specializes in emergency service and maintenance of automatic, sliding, and commercial ADA-compliant door systems. The company is known for fast response, expert technicians, and long-term relationships with national retail and healthcare clients. Media Contact: Melvin N. Dumanlang Marketing Director Atlas Door Repair Phone: (866) 889-3091 Email: info@ Website: PHOTO link for media: Caption: A newly serviced commercial automatic sliding door in Illinois—one of Atlas Door Repair's growing 24/7 service areas like Florida. This release was issued through Send2Press® on behalf of the news source. For more information, visit Send2Press Newswire at View original content: SOURCE Atlas Door Repair Error in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data
Yahoo
3 days ago
- Yahoo
Cardano's ADA Finds 'Strong Support' After Dramatic Price Swings Amid Heightened Volatility
The cryptocurrency market is experiencing heightened volatility amid an escalating feud between President Donald Trump and his former head of the Department of Government Efficiency, Elon Musk, over the state of the U.S. economy. Cardano's ADA ADA has also seen extreme price swings amid market uncertainties. After dropping from $0.688 to $0.621, ADA found strong support and rebounded, forming an ascending channel with resistance at $0.644, according to CoinDesk Research's technical analysis model. The technical indicators suggest a potential renewed bullish momentum as the cryptocurrency reclaims the $0.640 level with decreasing volatility. At press time, ADA is trading at $0.66, down about 1.8% over the past 24 hours, while the broader market gauge CoinDesk 20 Index fell 1%. Some recent news within the ADA ecosystem has provided the market with potential catalysts for the token. Institutional interest in the Cardano blockchain continues to grow, with Franklin Templeton, a $1.6 trillion asset manager, now running Cardano nodes. Additionally, Norway's NBX has recently partnered with Cardano to build Bitcoin-based DeFi, highlighting the blockchain's secure design for institutional adoption. The successful execution of the first Bitcoin-to-Cardano transaction involving Ordinals marks a significant milestone that could potentially unlock $1.5 trillion in cross-chain trading opportunities. Technical Analysis Highlights Sharp decline from $0.688 to $0.621 (10.29% drop) occurred on exceptionally high volume. Strong support zone established at $0.620-$0.623 where buyers aggressively stepped in. Recovery formed an ascending channel with resistance at $0.644. Overall range of $0.070 (10.29%) highlights the extreme market conditions. Potential renewed bullish momentum as ADA reclaimed the $0.640 level with decreasing volatility. Hourly price action showed a possible recovery pattern from $0.641 to $0.643. Short-term resistance level established at $0.643-$0.644. Disclaimer: Parts of this article were generated with the assistance from AI tools and reviewed by our editorial team to ensure accuracy and adherence to our standards. For more information, see CoinDesk's full AI Policy.