logo
Shubhanshu Shukla's Axiom Mission Postponed: How Does Liquid Oxygen Leak Affect Take-Off? Explained

Shubhanshu Shukla's Axiom Mission Postponed: How Does Liquid Oxygen Leak Affect Take-Off? Explained

News183 days ago

Last Updated:
Liquid oxygen is oxygen that has been cooled to a point where it becomes a pale blue liquid and is used extensively in rocket propulsion systems and spacecraft life support systems
India may have to wait a little longer to see its astronaut Shubhanshu Shukla in Space as the Axiom-4 mission to the International Space Station, carrying three more astronauts, has been put off for the time being, with engineers seeking more time to repair a leak in the SpaceX's Falcon-9 rocket.
In a post on X, SpaceX announced that it was 'standing down" from the Falcon-9 launch of the Axiom-4 mission to allow repairs of the liquid oxygen leak identified during the post-static booster inspections. 'Once complete—and pending Range availability—we will share a new launch date," SpaceX said.
Earlier, addressing a pre-launch press conference, SpaceX Vice-President William Gerstenmaier said engineers had fixed some snags in the Falcon-9 rocket that were discovered during the static fire test and had gone unnoticed during the post-flight refurbishment of boosters.
Gerstenmaier said engineers had discovered a lock leak that was previously seen on the booster during its entry on the last mission and was not fully repaired during the refurbishment.
WHAT IS LIQUID OXYGEN?
Liquid oxygen (LOX) is oxygen that has been cooled to a point where it becomes a pale blue liquid. It's used extensively in rocket propulsion systems and spacecraft life support systems. LOX is essential for providing breathable air for astronauts, as well as being a key component in the fuel systems for launch.
During pre-launch preparations, a liquid oxygen leak was detected in the system that supplies the spacecraft with oxygen for both life support and propulsion. The leak itself wasn't catastrophic, but it posed significant safety risks for the crew and the mission. Even a small leak of LOX in spacecraft systems can be dangerous because of the extremely cold temperatures of liquid oxygen (-183°C or -297°F) and the potential for it to evaporate into gaseous oxygen, creating risks for fire or explosions in the pressurised environment.
WHY DID THE LEAK DELAY THE MISSION?
Safety Concerns: The primary reason for delaying the mission was the safety of the crew. A leak in the oxygen system, especially if it couldn't be sealed or fully contained, could lead to catastrophic failure during launch or while in orbit. Ensuring that all systems are completely operational and leak-free is critical for crewed missions, and any issue with life support or propulsion systems could jeopardize the mission.
Technical Complexities: Spacecraft systems, especially those used for crewed missions, are highly sensitive and complex. Even a seemingly minor issue, like a leak in the oxygen system, can trigger a more thorough investigation, technical fixes, and re-testing. Given the tight tolerance and precision required for these systems, any malfunction necessitates a delay to ensure that the spacecraft is fully operational and safe for launch.
Crew Oxygen Supply: The spacecraft needs a stable supply of LOX to create breathable air for astronauts during launch, orbital operations, and re-entry. If there's a leak in the LOX system, it could compromise the crew's oxygen supply, especially during the early phases of flight when the spacecraft is still in the lower atmosphere and the crew is exposed to high g-forces and other launch stresses.
Air Quality and Safety: In a crewed mission, any disruption to the life support system (like a leaking oxygen tank) is a serious concern. Spacecraft need to maintain precise levels of oxygen and pressure to ensure the crew's safety, and a leak could risk causing an unsafe environment. This would prevent the mission from launching until the leak was fixed or isolated.
Launch Pad Procedures: In space missions, there are strict procedures for handling any anomaly during pre-launch, including detecting leaks in critical systems. A LOX leak detected prior to take-off would trigger an automatic halt to the launch sequence because safety is the top priority. This means that even if the leak were small, engineers would need to address it to ensure that the spacecraft could handle the extreme conditions of take-off.
Fuelling and Pre-Flight Readiness: The fuelling process for LOX can take hours, and a leak could disrupt the timing of fuel loading. If the leak were detected during fuelling, the launch would need to be scrubbed and rescheduled after repairs, further delaying the mission.
THE AXIOM MISSION
The Axiom-4 (Ax-4) mission is part of a series of private spaceflights organised by Axiom Space, a private space company, to send private astronauts to the International Space Station (ISS). The Ax-4 mission is part of Axiom's goal to commercialise space travel and provide private citizens and researchers the opportunity to experience life in orbit and conduct research aboard the ISS.
NASA's Axiom-4 mission will 'realize the return" to human spaceflight for India, Poland, and Hungary, with each nation's first government-sponsored flight after over 40 years. While Axiom-4 marks these countries' second human spaceflight mission in history, it will be the first time all three nations will execute a mission on board the ISS. The four crew members will be led by Axiom Space's Director of Human Spaceflight, Peggy Whitson while Shukla will serve as the pilot in the mission.
This historic mission highlights how Axiom Space is redefining the pathway to low-Earth orbit and elevating national space programs globally. The space crew will carry out around 60 experiments during their 14-day stay in space, ranging from life science to technology demonstrations to diabetes research.
First Published:
News explainers Shubhanshu Shukla's Axiom Mission Postponed: How Does Liquid Oxygen Leak Affect Take-Off? Explained

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

What is Zvezda module, Russian contribution to ISS further delaying Axiom-4 Mission
What is Zvezda module, Russian contribution to ISS further delaying Axiom-4 Mission

The Print

time7 hours ago

  • The Print

What is Zvezda module, Russian contribution to ISS further delaying Axiom-4 Mission

NASA and Axiom said in a statement they were postponing the launch so that, along with Roscosmos, the Russian Space Agency, they can get more time to understand the problem. The leak was detected in the Russian Zvezda module of the ISS and the three cosmonauts in the module are working to fix the issue. New Delhi: A leak detected near the rear of the International Space Station (ISS) has further delayed the launch of the Axiom-4 Mission carrying IAF Pilot Shubhanshu Shukla to space, NASA announced Friday morning. According to ISRO, the new launch date will be announced jointly by NASA and Axiom once the issue is resolved. The decision was made keeping in mind that Shukla and the three other crew members aboard Ax-4 Mission are expected to spend a minimum of two weeks living on the ISS, conducting research. Indian Space Research Organisation (ISRO) also said it was 'working closely' with Axiom Space, NASA and SpaceX to 'responsibly address' the ISS module problem. ISRO is working closely with @Axiom_Space, @NASA, @SpaceX as they responsibly address the ISS Zvezda module observation causing the Ax‑4 delay. Safety and mission integrity remain our top priorities. With regards Dr. Secretary DOS/ Chairman ISRO & Chairman Space… — ISRO (@isro) June 12, 2025 This is the fourth time the Axiom-4 Mission, which marks an Indian astronaut's return to space after 41 years, has been postponed. The mission was initially set to launch on 29 May but was pushed to 8 June because of problems identified in the SpaceX Dragon spacecraft. It was subsequently moved to 9 June because of readiness issues in the SpaceX Falcon rocket, and then again to 10 June because of unfavourable weather conditions. On 10 June, Axiom announced that it had noticed a liquid oxygen leak in the rocket during the dry run and was postponing the launch again. The mission now stands postponed with no future launch date set. Also Read: What is a LOx leak—snag that has delayed Axiom-4 mission once again What is the Zvezda module The Zvezda module, part of the Russian contribution to the ISS, was docked to the station in July 2000. It provides life support systems, living quarters, communications systems and flight control systems to Russian cosmonauts aboard the station. According to the ISS blog, cosmonauts onboard the Zvezda module recently repaired the air leak in their module. However, NASA again discovered a change in air pressure inside the ISS, indicating a leak or anomaly. The cosmonauts have checked the interior walls of the Zvezda module for cracks and sealed the suspicious areas. While the pressure inside seems to be normal, NASA and Roscosmos are still looking for a longer-term solution. The ISS is made up of different modules attached by different space agencies—NASA, JAXA, CSA, ESA, and Roscosmos. While some modules like the Permanent Multipurpose Module by the ESA are used mainly for cargo storage, others like the Cupola by NASA are used for Earth observation and space walks. However, the Zvezda, like ESA's Tranquility Module and NASA's Unity Module, is one of three ISS modules that have life support systems for astronauts in space and provide living quarters. In the event of a new mission like Axiom-4 carrying a crew to space, it is vital for the station to be fully operational and intact to prevent potential problems during the docking of spacecraft or conducting research experiments. (Edited by Sugita Katyal) Also Read: India poised for human spaceflight after 41 yrs—all about Axiom-4, Shubhanshu Shukla's 'dream come true'

After Axiom-4 delay, ISRO says ‘safety, mission integrity top priority'
After Axiom-4 delay, ISRO says ‘safety, mission integrity top priority'

Hindustan Times

time8 hours ago

  • Hindustan Times

After Axiom-4 delay, ISRO says ‘safety, mission integrity top priority'

ISRO on Friday asserted that safety and mission integrity were its top priority as NASA and Axiom Space said they were working to address an issue related to a leak at the International Space Station, even as SpaceX chief Elon Musk voiced concerns over the long-term safety of the orbital lab and suggested it be brought down in two years. India's Shubhanshu Shukla, along with three other astronauts, is scheduled to travel to the ISS as part of the Axiom-4 commercial mission that has now been put on indefinite delay, as space agencies address various issues that have cropped up ahead of the launch. "Safety and mission integrity remain our top priorities," ISRO Chairman V Narayanan said in a post on X. He said ISRO is working closely with Axiom Space, NASA and SpaceX, as they responsibly address the ISS Zvezda module observation causing the delay. Meanwhile, Musk said some parts of the ISS were "simply getting too old and obviously that risk grows over time." "There are potentially serious concerns about the long-term safety of the @Space_Station. Some parts of it are simply getting too old and obviously that risk grows over time," Musk said. "Even though @SpaceX earns billions of dollars from transporting astronauts & cargo to the ISS, I nonetheless would like to go on record recommending that it be de-orbited within 2 years," Musk said. NASA and other international partners plan to retire the ISS by 2031 and de-orbit the laboratory soon after. Axiom Space is among the few private space companies that are vying to build a successor to the ISS. India's return to spaceflight as part of the Axiom-4 private mission has run into further delay as NASA announced on Thursday that it was examining a leak onboard the ISS' Russian module. "NASA and Axiom Space are postponing the launch of Axiom Mission 4 to the International Space Station," a NASA statement said. The astronauts were originally scheduled for lift-off on May 29, which was put off to June 8, June 10 and June 11, when SpaceX, the providers of the launch rocket and the space capsule, detected a liquid oxygen leak in the Falcon-9 rocket. Former NASA astronaut and director of human spaceflight at Axiom Space, Peggy Whitson, will command the commercial mission, while Indian Space Research Organisation (ISRO) astronaut Shubhanshu Shukla will serve as pilot. The two mission specialists are European Space Agency (ESA) project astronaut Slawosz Uznanski-Wisniewski of Poland and Tibor Kapu of Hungary. The 14-day mission will "realise the return" to human spaceflight for India, Poland and Hungary. "Setbacks and delays are a normal part of spaceflight. Our Ax-4 crew remains upbeat and looking forward to a safe and successful flight to the Space Station," Whitson said in a post on X.

ISRO working with NASA, Axiom, SpaceX to address AX-4 mission to ISS piloted by Indian astronaut
ISRO working with NASA, Axiom, SpaceX to address AX-4 mission to ISS piloted by Indian astronaut

United News of India

time8 hours ago

  • United News of India

ISRO working with NASA, Axiom, SpaceX to address AX-4 mission to ISS piloted by Indian astronaut

Chennai, June 13 (UNI) The Indian Space Research Organisation (ISRO) on Friday said it was working with Axiom Space, NASA and SpaceX to address the technical glitch--leakage of LOX fuel--that led to the deferment of Axiom-4 mission to the International Space Station (ISS) piloted by decorated Indian astronaut Subhanshu Shukla, carrying the hopes and dreams of billions and conducted seven key microgravity experiments ISRO said Safety and mission integrity remain its top priorities. In a post on X, ISRO Chairman V Narayanan said "ISRO is working closely with Axiom Space, NASA, SpaceX as they responsibly address the ISS Zvezda module observation causing the Ax-4 delay. Safety and mission integrity remain our top priorities." The launch was scheduled to take off to ISS on a 14-day docking at ISS involving four crew members from India, US, Hungary and Poland, but was deferred after the LOX leak was detected during post static fibre booster inspections. After addressing the glitch, the fresh launch dates would be announced SpaceX and Axiom said and that the launch window availability was still available till June end and July. This is ISRO first mission in over 40 years and Group Captain Shubhanshu Shukla will be India's second national astronaut to go to space since 1984 after Rakesh Sharma in 1984. Meanwhile, in another update, chronicling the mission's key developments, ISRO said "The launch of Axiom Mission-04 (Ax-04), which includes the launch of India's first astronaut Shubhanshu Shukla to the International Space Station, has been postponed. The launch originally targeted on May 29, 2025 was deferred due to observation in electrical harness in Crew Dragon Module, to June 8, 2025 The launch was postponed by one day to June 09, 2025 due to delay in preparedness of the Falcon 9 vehicle for the launch from Florida. The launch date was further postpone to June 10, 2025, due to unfavourable weather in the ascent corridor. Additional observation of oxygen leakage in the engine bay was observed during the preparation for hot fire test conducted on June 08, 2025. Moreover, there was an observation of an anomaly in one of the engine actuator which was replaced along with the controller. Anticipating the quick resolution of LOX leak issue, the launch was rescheduled to June 11, 2025. During the appraisal of technical issues by Axiom & SpaceX to ISRO delegation on June 10, 2025, ISRO recommended to carry out in-situ repairs or replacement and conduct a low-temperature leak test to validate system performance and integrity, before proceeding with launch clearance. On June 11, 2025, NASA informed that they are working with Roscosmos to evaluate a new pressure signature indicating a leak in the aft most segment of the ISS Zvezda Russian service module, after the recent repair attempt. In order to assess the situation and determine the need for further troubleshooting, the launch of Axiom-4 mission is being postponed. The revised launch schedule will be announced by NASA and Axiom after the activities and technical reviews are satisfactorily completed. UNI GV 2142

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store