Premium Commences Resource Expansion Through Drilling and Comprehensive Metallurgy Optimization at Selkirk
Toronto, Ontario--(Newsfile Corp. - May 15, 2025) - Premium Resources Ltd. (TSXV: PREM) (OTC Pink: PRMLF) ("PREM" or the "Company") announces that a surface drilling program is underway and provides details of the work program at its past-producing copper-nickel-cobalt-platinum group elements ("Cu-Ni-Co-PGE") sulphide Selkirk mine ("Selkirk Mine") in Botswana. The drilling program is designed to demonstrate resource expansion and metallurgical flowsheet development. These initiatives are aimed at de-risking the project to support future development decisions.
Highlights of Selkirk Work Program
Drilling program initiated - A 12-hole drill program is underway at Selkirk (Figure 1), focused on twinning historical holes to validate legacy data, adding key data points to support a future resource model update, and resource expansion through continued resampling of historical core (See news release April 10, 2025).
Continued resampling of historical core - In 2024, 17 historical drill holes were resampled to obtain complete PGE analysis (See press releases dated October 28, 2024, titled: "Selkirk Deposit Provides Strong Historic Drill Core Results Including 186.25 Metres of 1.65% CuEq"). An additional 34 historical holes have been identified for resampling.
Metallurgical program ongoing - Aimed at refining orebody domains and developing a more comprehensive, de-risked metallurgical model reflected in an updated Mineral Resource Estimate ("MRE") and supporting studies.
Morgan Lekstrom, CEO of Premium Resources states: "Resampling the historical drill core has proven to be a cost-effective and impactful way to enhance our understanding of the Selkirk deposit. This phase of drilling will prove critical for resource reclassification as we rapidly advance toward restoring the project's legacy resource estimate. We remain focused on accelerating Selkirk and positioning it for near future development."
The surface drilling program will collect fresh HQ-sized core to support metallurgical flowsheet, generate material for preliminary X-ray Transmission ("XRT") ore-sorting tests, and support the potential expansion and upgrade of the National Instrument 43-101 ("NI 43-101") compliant 44.2Mt Inferred MRE to the Indicated category (see news release dated November 27, 2024).
Historical production at the Selkirk Mine took place between 1989 and 2002 with Anglo American mining high grade Cu-Ni massive sulphides and producing 1 million tonnes at 2.6% Ni and 1.5% Cu. Thereafter, in 2006, LionOre Mining International Ltd. ("LionOre") published a technical report in accordance with NI 43-101 and more recently in 2013, Norilsk Nickel Africa commissioned GiproNickel Institute to calculate an updated mineral resource estimate in accordance with JORC Code (Joint Ore Reserves Committee) that demonstrated a historical resource of 128.4 Mt 0.21% Ni, 0.23% Cu Measured & Indicated / 123.8 Mt 0.17% Ni, 0.19% Cu Inferred (See Historical Estimates).
The Company will continue to provide regular updates as drilling activities progress and metallurgical test work advances.
Figure 1 and Figure 2
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/7759/252197_joint.jpg
Premium Engages ICP Securities Inc.
The Company has engaged the services of ICP Securities Inc. ("ICP") to provide automated market making services, including use of its proprietary algorithm, ICP Premium™, in compliance with the policies and guidelines of the TSX Venture Exchange and other applicable legislation. ICP will be paid a monthly fee of C$7,500, plus applicable taxes, which will be paid from the Company's working capital. The agreement between the Company and ICP was signed with a start date of May 15, 2025, and is for four (4) months (the "Initial Term") and shall be automatically renewed for subsequent one (1) month terms (each month called an "Additional Term") unless either party provides at least thirty (30) days' written notice prior to the end of the Initial Term or an Additional Term, as applicable. There are no performance factors contained in the agreement and no stock options or other compensation securities issuable in connection with the engagement. ICP presently has no interest, directly or indirectly, in the Company or its securities. ICP and its clients may acquire an interest in the securities of the Company in the future.
ICP is an arm's length party to the Company. ICP's office is located at 204 - 251 Queens Quay East, Toronto, Ontario, M5A 0X3. ICP's market making activity will be primarily to correct temporary imbalances in the supply and demand of the Company's shares. ICP will be responsible for the costs it incurs in buying and selling the Company's shares, and no third party will be providing funds or securities for the market making activities. The appointment of ICP is subject to approval by the TSX Venture Exchange.
Qualified Person
The scientific and technical content of this news release has been reviewed and approved by Sharon Taylor, Vice President Exploration of the Company, who is a "qualified person" for the purposes of National Instrument 43-101.
Technical Report
The Mineral Resource Estimate on the Selkirk Mine is supported by the technical report entitled "NI 43-101 Technical Report Selkirk Nickel Project, North East District, Republic of Botswana", dated November 1, 2024 (with an effective date of January 10, 2025) (the "Technical Report") prepared by SLR Consulting (Canada) Ltd. for PREM. Reference should be made to the full text of the Technical Report for the assumptions, qualifications and limitations set forth therein, a copy of which is available on SEDAR+ (www.sedarplus.com) under PREM's issuer profile.
Historical Estimates
Certain of the mineral resource estimates referred to in this release are historical in nature and should not be relied upon as a current mineral resource estimate. While management believes that these historical mineral resource estimates could be indicative of the presence of mineralization on the Selkirk Mine property, a "qualified person" (for purposes of NI 43-101) has not completed sufficient work to classify the historical mineral estimates as a current mineral resource estimates and the Company is not treating the historical mineral estimates as current mineral resource estimates.
About Premium Resources Ltd.
PREM is a mineral exploration and development company that is focused on the redevelopment of the previously producing nickel, copper and cobalt resources mines owned by the Company in the Republic of Botswana.
PREM is committed to governance through transparent accountability and open communication within our team and our stakeholders. Our skilled team has worked over 100 projects collectively, accumulating over 400 years of resource discoveries, mine development and mine re-engineering experience on projects like the Company's Selebi and Selkirk mines. PREM's senior team members have on average more than 20 years of experience in every single aspect of mine discovery and development, from geology to operations.
For further information about Premium Resources Ltd., please contact:
Morgan LekstromCEO and Directormorganl@premiumresources.com
Jaclyn RuptashVice President, Communications and Investor Relationsjaclyn@premiumresources.com
Cautionary Note Regarding Forward-Looking Statements
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. For the purposes of this release, forward looking information includes, but is not limited to: the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Selkirk Mine as currently contemplated; the anticipated ability of exploration activities (including drill results) to accurately predict mineralization; the timing of release of assay results; the timing and ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally, including metallurgical flowsheet development and preliminary XRT ore-sorting tests; the goal of the Company to define additional or upgrade existing mineral resource estimates on the Selkirk Mine in accordance with NI 43-101; the results of the exploration program at the Selkirk Mine and the timing and disclosures of the Company regarding same; the benefits of the Company's approach to exploration; and management's belief that the historical resource estimates disclosed in this news release could be indicative of the presence of mineralization on the deposits. These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; the ability of exploration results to predict mineralization, prefeasibility or the feasibility of mine production; the risk that the Company will not be able to advance the Selkirk Mine as currently contemplated; the risk that the Company will not be able to define additional or upgrade existing mineral resource estimates on the Selkirk Mine in accordance with NI 43-101; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; other risks involved in the mineral exploration and development industry; and those risks set out in the Company's public disclosure record on SEDAR+ (www.sedarplus.com) under PREM's issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
Follow UsX: https://x.com/prem_resources Linked in: https://www.linkedin.com/company/Premium-Resources Facebook: https://www.facebook.com/PremiumResourcesLtd
Figure 1: Location of planned drill holes
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/7759/252197_f89d084dc42ce882_004full.jpg
Figure 2: Selkirk Mining License
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/7759/252197_figure2.jpg
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/252197
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
an hour ago
- Yahoo
Wealth Minerals' Participation in Successful Consortium License Permitting Bid
Vancouver, British Columbia--(Newsfile Corp. - June 5, 2025) - Wealth Minerals Ltd. (TSXV: WML) (OTCQB: WMLLF) (SSE: WMLCL) (FSE: EJZN) (the "Company" or "Wealth") announces that a Consortium to develop the Quillagua Este Salar in the Antofagasta Region, Chile, of which Wealth is a member, has successfully submitted a CEOL (Special Lithium Operating Contract) application under the fast-track process announced by the Chilean Government in September 2024 (see press release of September 30, 2024) and expanded in December 2024. The application was admitted by the Chile licensing authorities due to the application Consortium: having more than 80% of the applicable polygon, demonstrating relevant mining experience, and demonstrating financial capacity to fund a mining project. For reference about the CEOL fast-track process, please see press release of April 23, 2025. Next steps, as per the CEOL process, are the conclusion of Indigenous consultations, negotiations with the State organs as to specific operating terms and a Presidential decree establishing the CEOL based on the application. Wealth participated with three other local partners in a joint bid (the "Consortium") to extract lithium from the Quillagua Este Salar and is to provide strategic advice and know-how to the Consortium from its long operating experience in Chile. Wealth has a 3% stake in the Consortium. The CEOL application calls for lithium production from the Quillagua Este Salar, although presently the Quillagua Este Salar lithium project of the Consortium does not have an established resource or feasibility study. Regarding the Consortium's success, Henk van Alphen, CEO of Wealth Minerals Ltd., said, "While Wealth's stake in this endeavor is modest, this news does show that the Chilean regulatory regime can be successfully navigated, while also demonstrating that the Chilean authorities support the development of new lithium projects fully privately owned. Our success working with a group to make this CEOL application further underscores our commitment to permitting our Kuska project, which is only 120 km away to the northeast of the Quillagua Este Salar." About Wealth Minerals Ltd. Wealth is a mineral resource company with interests in Canada and Chile. The Company's focus is the acquisition and development of lithium projects in South America. The Company opportunistically advances battery metal projects where it has a peer advantage in project selection and initial evaluation. Lithium market dynamics and a rapidly increasing metal price are the result of profound structural issues with the industry meeting anticipated future demand. Wealth is positioning itself to be a major beneficiary of this future mismatch of supply and demand. In parallel with lithium market dynamics, Wealth believes other battery metals will benefit from similar industry trends. For further details on the Company readers are referred to the Company's website ( and its Canadian regulatory filings on SEDAR+ at On Behalf of the Board of Directors of WEALTH MINERALS LTD. "Hendrik van Alphen"Hendrik van AlphenChief Executive Officer For further information, please contact:Marla Ritchie, Michael Pound or Henk van AlphenPhone: 604-331-0096 or 604-638-3886 For all Investor Relations inquiries, please contact:John LiviakisLiviakis Financial Communications 415-389-4670 For all Public Relations inquiries, please contact:Nancy ThompsonVorticom, 212-532-2208 | Mobile: 917-371-4053 Follow Us: Facebook - - - Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release, which has been prepared by management. Cautionary Note Regarding Forward-Looking Statements This press release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and US securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding the anticipated content, commencement, timing and cost of exploration programs, anticipated exploration program results, the discovery and delineation of mineral deposits/resources/reserves, the Company's expectation that it will be able to enter into agreements to acquire interests in additional mineral projects, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, the state of the financial markets for the Company's equity securities, the state of the commodity markets generally, variations in the nature, quality and quantity of any mineral deposits that may be located, variations in the market price of any mineral products the Company may produce or plan to produce, the inability of the Company to obtain any necessary permits, consents or authorizations required, including TSXV acceptance, for its planned activities, the inability of the Company to produce minerals from its properties successfully or profitably, to continue its projected growth, to raise the necessary capital or to be fully able to implement its business strategies, and other risks and uncertainties disclosed in the Company's latest interim Management Discussion and Analysis and filed with certain securities commissions in Canada. All of the Company's Canadian public disclosure filings may be accessed via and readers are urged to review these materials, including the technical reports filed with respect to the Company's mineral properties. To view the source version of this press release, please visit
Yahoo
an hour ago
- Yahoo
Impact Silver Announces Closing of $5.2 Million Oversubscribed Non-Brokered Private Placement Financing
Vancouver, British Columbia--(Newsfile Corp. - June 5, 2025) - IMPACT Silver Corp. (TSXV: IPT) (OTCQB: ISVLF) (FSE: IKL) ("IMPACT" or the "Company") is pleased to announce that it has closed a final tranche of the non-brokered private placement financing that was initially announced on April 15, 2025 and subsequently increased on April 18, 2025 (the "Offering"). The Company received aggregate proceeds of C$92,000 from the issuance of 460,000 LIFE units (the "LIFE Units") at $0.20 per LIFE Unit. and C$1,183,320 from the issuance of 6,574,000 units (the "Units") of the Company at C$0.18 per Unit for a total of $1,275,320. With the first tranche closing of $3,930,711, this brings the total oversubscribed financing to $5,206,031. The Units are subject to a hold period of four months and a day from the closing. Each Unit was comprised of one common share and one common share purchase warrant exercisable for three years from the closing date into a common share at a price of $0.24 per common share. The LIFE Units were comprised of one common share and one-half of one common share purchase warrant, with each whole warrant exercisable for two years from the closing date into a common share at a price of $0.26 per common share. The Company intends to use the proceeds from the Offering to accelerate exploration activity at its Plomosas high-grade zinc-lead-silver property located in Chihuahua, Mexico, further develop its prolific silver assets at its legacy Royal Mines of Zacualpan district, as well as invest in operational improvements to improve productivity and throughput as the price of silver nears 52-week highs. Exploration activities include sampling, target definition, and drilling with the intention of expanding the existing JORC mineral resource at Plomosas where exploration potential is exceptional along a 6 km-long structure. The issuance of the LIFE Units was made pursuant to the listed issuer financing exemption under Part 5A of National Instrument 45-106 - Prospectus Exemptions (the "LIFE Exemption"). The securities sold under the LIFE Exemption are not subject to a hold period in accordance with applicable Canadian securities laws. A copy of the offering document under the LIFE Exemption dated April 15, 2025, is available electronically on SEDAR+ ( under the Company's issuer profile. The Offering remains subject to final acceptance by the TSX Venture Exchange. In connection with this tranche of the Offering, the Company paid an aggregate of $62,899.20 in finder's fees and issued 347,355 finder's warrants (each, a "Finder's Warrant") to certain finders. Each Finder's Warrant is exercisable for three years from the closing date into a common share at a price of $0.24 per common share. The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act"), or any state securities laws, and accordingly, may not be offered or sold within the United States except in compliance with the registration requirements of the U.S. Securities Act and applicable state securities requirements or pursuant to exemptions therefrom. This press release does not constitute an offer to sell or a solicitation to buy any securities in any jurisdiction. ABOUT IMPACT SILVER IMPACT Silver Corp. (TSXV: IPT) is a successful producer-explorer with two mining projects in Mexico. Royal Mines of Zacualpan Silver-Gold District: IMPACT owns 100% of the 211 km2 Zacualpan project where four underground silver mines and one open pit mine feed the central 500 tpd Guadalupe processing plant. To the south, the Capire Project includes a 200 tpd processing pilot plant adjacent to an open pit silver mine with an NI 43-101 inferred mineral resource of over 4.5 million oz silver, 48 million lbs zinc and 21 million lbs lead (see IMPACT news release dated January 18, 2016 for details and QP statement); Company engineers are reviewing Capire for a potential restart of operations. Over the past 18 years, IMPACT has placed multiple zones into commercial production and produced over 13 million ounces of silver, generating revenues over $284 million. Plomosas Zinc-Lead-Silver District: Plomosas is a high-grade zinc producer in northern Mexico with exceptional exploration upside potential. The Company recently re-commenced operations and is ramping up production toward design capacity levels. Exploration potential at Plomosas is exceptional along a 6 km-long structure. This is in addition to other exploration targets on the 3,019-hectare property including untested copper-gold targets with indications of high-grade material from surface. Regionally, Plomosas lies in the same mineral belt as some of the largest carbonate replacement deposits in the world. Qualified Person and NI 43-101 Disclosure George Gorzynski, is a "Qualified Person" within the meaning of NI 43-101 and has approved the technical information contained in this news release. On behalf of IMPACT Silver Corp. "Frederick W. Davidson" President & CEO For more information, please contact: Jerry Huang CFO | Investor Relations (604) 664-7707 or inquiries@ (778) 887 6489 Direct Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Forward-Looking and Cautionary Statements This IMPACT News Release may contain certain "forward-looking" statements and information relating to IMPACT that is based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. All statements, other than statements of historical facts, included herein, including, without limitation, statements relating to future silver prices, interpretation of drill results, future work plans, proceeds received and use of funds, the potential of the Company's projects, and potential and plans for the Plomosas project, are forward looking statements. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Such statements include, but are not limited to, statements with respect to the expected use of proceeds of the Private Placement. Such forward-looking information involves known and unknown risks and assumptions, including with respect to, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement, except as required by law. The Company's decision to place a mine into production, expand a mine, make other production related decisions or otherwise carry out mining and processing operations, is largely based on internal non-public Company data and reports based on exploration, development and mining work by the Company's geologists and engineers. The results of this work are evident in the discovery and building of multiple mines for the Company and in the track record of mineral production and financial returns of the Company since 2006. Under NI 43-101 the Company is required to disclose that it has not based its production decisions on NI 43-101 compliant mineral resource or reserve estimates, preliminary economic assessments or feasibility studies, and historically such projects have increased uncertainty and risk of failure. 303-543 Granville Street Telephone (604) 664-7707 Vancouver, BC, Canada V6C 1X8 NOT FOR DISTRIBUTION TO U.S. NEWS SERVICES OR FOR DISSEMINATION IN THE UNITED STATES To view the source version of this press release, please visit Sign in to access your portfolio
Yahoo
2 hours ago
- Yahoo
ReconAfrica Announces Upsize of Underwritten Offering to C$16.5 Million
The Base Shelf Prospectus is accessible, and the Prospectus Supplement will be accessible within two business days, through SEDAR+ Calgary, Alberta--(Newsfile Corp. - June 5, 2025) - Reconnaissance Energy Africa Ltd. (TSXV: RECO) (OTCQX: RECAF) (FSE: 0XD) (NSX: REC) (the "Company" or "ReconAfrica") announces that, in connection with its previously announced overnight marketed public offering of units of the Company (the "Units"), it has increased the size of the offering due to strong investor demand and has entered into an underwriting agreement with Research Capital Corporation as the lead underwriter and sole bookrunner, on behalf of a syndicate of underwriters, including Canaccord Genuity Corp. and Haywood Securities Inc. (collectively, the "Underwriters"), pursuant to which the Underwriters have agreed to purchase 33,000,000 Units at a price of C$0.50 per Unit for aggregate gross proceeds of C$16,500,000 (the "Offering"). In connection with the Offering, indications of lead orders have been received from BW Energy Limited ("BW Energy"), directors and management members of ReconAfrica, and certain other investors, expecting to purchase over C$4,000,000 of Units. BW Energy has agreed to a follow-on strategic equity investment in the Company of approximately C$2,000,000 under the Offering, reaffirming it's previously announced strategic partnership with ReconAfrica. The Units purchased by BW Energy under the Offering will be subject to a six-month lock-up agreement. Each Unit will be comprised of one common share of the Company ("Common Share") and one Common Share purchase warrant of the Company ("Warrant"). Each Warrant will entitle the holder thereof to purchase one Common Share at an exercise price of C$0.60 at any time up to 24 months from closing of the Offering. In addition, the Company will use commercial reasonable efforts to obtain the necessary approvals to list the Warrants on the TSX Venture Exchange (the "Exchange"). The net proceeds from the Offering will be used for exploration activities, working capital and general corporate purposes. The primary exploration activity to be funded with net proceeds from the Offering will be the drilling of Prospect I, which has been named the Kavango West 1X well. Work on the access road and drill site is currently being completed while the Company awaits receipt of the remaining requisite permits. The rig move to the Kavango West 1X well drilling location is scheduled in late June, with drilling to begin thereafter. The Company has granted to the Underwriters an option (the "Over-Allotment Option"), exercisable, in whole or in part, in the sole discretion of the Underwriters, to purchase up to an additional number of Units, and/or the components thereof, that in aggregate would be equal to 15% of the total number of Units to be issued under the Offering, to cover over-allotments, if any, and for market stabilization purposes, exercisable at any time and from time to time up to 30 days following the closing of the Offering. The closing of the Offering is expected to occur on or about the week of June 16, 2025 (the "Closing"), or such other earlier or later date as the Underwriters may determine. Closing is subject to the Company receiving all necessary regulatory approvals, including the acceptance of the Exchange to list, on the date of Closing, the Common Shares, and the Common Shares issuable upon exercise of the Warrants and the Underwriters' broker warrants, on the Exchange. In connection with the Offering, the Company intends to file a prospectus supplement within two business days, to the Company's short form base shelf prospectus dated February 29, 2024, with the securities regulatory authorities in each of the provinces of Canada (except Québec). Copies of the base shelf prospectus and any supplement thereto to be filed in connection with the Offering, are and will be available under the Company's profile on SEDAR+ at The Units are being offered in each of the provinces of Canada (except Québec) and may be offered in the United States to "qualified institutional buyers" (as defined in Rule 144A under the United States Securities Act of 1933, as amended (the "U.S. Securities Act")) or "accredited investors" (as defined in Regulation D promulgated under the U.S. Securities Act) on a private placement basis pursuant to an appropriate exemption from the registration requirements under applicable U.S. law, and outside of Canada and the United States on a private placement or equivalent basis. This press release is not an offer to sell or the solicitation of an offer to buy the securities in the United States or in any jurisdiction in which such offer, solicitation or sale would be unlawful prior to qualification or registration under the securities laws of such jurisdiction. The securities being offered have not been, nor will they be, registered under the U.S. Securities Act and such securities may not be offered or sold within the United States or to, or for the account or benefit of, U.S. persons absent registration or an applicable exemption from the registration requirements of the U.S. Securities Act and applicable U.S. state securities laws. About BW Energy Limited BW Energy is a growth E&P company with a differentiated strategy targeting proven offshore oil and gas reservoirs through low risk phased developments. The Company has access to existing production facilities to reduce time to first oil and cashflow with lower investments than traditional offshore developments. The Company's assets are 73.5% of the producing Dussafu Marine licence offshore Gabon, 100% interest in the Golfinho and Camarupim fields, a 76.5% interest in the BM-ES-23 block in, a 95% interest in the Maromba field in Brazil and a 95% interest in the Kudu field in Namibia, all operated by BW Energy. BW Energy, 74% owned by BW Group Ltd., was created as the E&P arm of Oslo listed BW Offshore, a company with more than four decades of experience in operating advanced offshore production solutions and executing complex projects. Since its origin, BW Offshore has executed 40 FPSO and FSO projects. About ReconAfrica ReconAfrica is a Canadian oil and gas company engaged in the exploration of the Damara Fold Belt and Kavango Rift Basin in the Kalahari Desert of northeastern Namibia, southeastern Angola and northwestern Botswana, where the Company holds petroleum licences comprising ~13 million contiguous acres. In all aspects of its operations, ReconAfrica is committed to minimal disturbance of habitat in line with international standards and implementing environmental and social best practices in its project areas. Neither the TSXV nor its Regulation Services Provider (as that term is defined in policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. For further information contact:Brian Reinsborough, President and Chief Executive OfficerMark Friesen, Managing Director, Investor Relations & Capital Markets Email: admin@ Inquiries Email: investors@ Inquiries Email: media@ Tel: +1-877-631-1160 Cautionary Note Regarding Forward-Looking Statements: Certain statements contained in this press release constitute forward-looking information under applicable Canadian, United States and other applicable securities laws, rules and regulations, including, without limitation, statements with respect to the expected use of proceeds from the Offering, including spudding of the Kavango West 1X well following final completion of the access road and drill site preparation, receipt of all required permits and the rig being moved to the drilling location, which has been scheduled for late June 2025, the well being drilled to a planned total depth of approximately 3,800 metres (12,500 feet) and targeting 255 million barrels of unrisked prospective oil resources or 1,350 billion cubic feet of unrisked prospective natural gas resources, the expected closing date of the Offering, the completion of the Offering being subject to the receipt of all necessary regulatory approvals, including acceptance of the Exchange, any potential acceleration of the expiry date of the Warrants, the listing of the Warrants, and the Company's commitment to minimal disturbance of habitat, in line with best international standards and its implementation of environmental and social best practices in its project areas. These statements relate to future events or future performance. The use of any of the words "could", "intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on ReconAfrica's current belief or assumptions as to the outcome and timing of such future events. There can be no assurance that such statements will prove to be accurate, as the Company's actual results and future events could differ materially from those anticipated in these forward-looking statements as a result of the factors discussed in the "Risk Factors" section in the Company's annual information form ("AIF") dated April 29, 2025 for the financial period ended December 31, 2024, available under the Company's profile at Actual future results may differ materially. Various assumptions or factors are typically applied in drawing conclusions or making the forecasts or projections set out in forward-looking information. Those assumptions and factors are based on information currently available to ReconAfrica. The forward-looking information contained in this release is made as of the date hereof and ReconAfrica undertakes no obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein. Disclosure of Oil and Gas Information: The Resource Report and the prospective resource estimates contained therein and in this press release were prepared by NSAI, an independent qualified reserves evaluator. The Resource Report was prepared in accordance with the definitions and guidelines of the Canadian Oil and Gas Evaluation Handbook maintained by the Society of Petroleum Evaluation Engineers (Calgary Chapter) and National Instrument 51-101 - Standards of Disclosure for Oil and Gas Activities. Prospective resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from undiscovered accumulations by applying future development projects. Prospective resources have both an associated chance of discovery and a chance of development. Prospective resources are further categorized according to the level of certainty associated with recoverable estimates assuming their discovery and development and may be subclassified based on project maturity. The prospective resources included in Resource Report and in this press release should not be construed as reserves or contingent resources; they represent exploration opportunities and quantify the development potential in the event a petroleum discovery is made. A geologic risk assessment was performed for these prospects and leads, as discussed in the Form 51-101F1 - Statement of Reserves Data and Other Oil and Gas Information ("Form 51-101F") dated April 29, 2025 and effective as of December 31, 2024, available under the Company's profile at The Resource Report is also available under the Company's profile at The Resource Report does not include economic analysis for these prospects and leads. Based on analogous field developments, it appears that, assuming a discovery is made, the unrisked best estimate prospective resources in the Resource Report have a reasonable chance of being economically viable. There is no certainty that any portion of the prospective resources will be discovered. If they are discovered, there is no certainty that it will be commercially viable to develop and produce any portion of the prospective resources. For additional information concerning the risks and the level of uncertainty associated with recovery of the prospective resources detailed herein and in the Resource Report, the significant positive and negative factors relevant to the prospective resources estimates detailed herein and in the Resource Report and a description of the project to which the prospective resources estimates detailed herein and in the Resource Report applies are contained within the Form 51-101F1. The prospective resources shown in herein and in the Resource Report have been estimated using probabilistic methods and are dependent on a petroleum discovery being made. If a discovery is made and development is undertaken, the probability that the recoverable volumes will equal or exceed the unrisked estimated amounts is 90 percent for the low estimate, 50 percent for the best estimate, and 10 percent for the high estimate. Low estimate and high estimate prospective resources have not been included in the Resource Report. For the purposes of the Resource Report, the volumes and parameters associated with the best estimate scenario of prospective resources are referred to as 2U. The 2U prospective resources have been aggregated beyond the prospect and lead level by arithmetic summation; therefore, these totals do not include the portfolio effect that might result from statistical aggregation. Statistical principles indicate that the arithmetic sums of multiple estimates may be misleading as to the volumes that may actually be recovered. **NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES** To view the source version of this press release, please visit Sign in to access your portfolio