
Relief from jarring rides: Kolkata lifeline to get mastic asphalt coat
Kolkata: After the
along SP Mukherjee Road,
(KMC) is now set to relay the thoroughfare with
keeping in mind the motorists' woes during the monsoon. The mastic asphalt will be transported through a special thermal container from a mastic asphalt plant in Rajarhat.
Tired of too many ads? go ad free now
This exercise is being followed as per WBPCB guidelines.
"We have asked the agency concerned to transport mastic asphalt through a thermal container to abide by WBPCB guidelines," said a KMC roads department official.
The road restoration work will be taken up in two phases. First, the civic body will relay the stretch between Hazra and Rashbehari intersection. After completing this stretch, the KMC roads department will proceed with the restoration of the stretch between Rashbehari crossing and Tollygunge rail bridge.
According to a civic official, KMC has selected a private firm through an e-tender and now needs to issue a work order for the project, the cost of which is estimated at Rs 18 crore.
A proposal to give SP Mukherjee Road a healing touch was passed at a recent mayor-in-council meeting and subsequently in the KMC monthly meeting. According to a KMC roads department official, major stretches of the arterial road need restoration as hurried repairs in the past have made SP Mukherjee Road a motorist's nightmare.
The roads department has also proposed a special plan for the concretisation of a 1km stretch on the flank that leads to Rashbehari crossing from Hazra. The stretch where the KMC's water booster pumping station is located will be specially paved. At present, this segment develops craters frequently due to water seepage.
Indiscriminate digging followed by unscientific repair is also one of the reasons why motorists suffer bumpy rides on SP Mukherjee Road, conceded a KMC roads department senior official.
Tired of too many ads? go ad free now
SP Mukherjee Road, along with Asutosh Mukherjee Road, Jawaharlal Nehru Road, and Chittaranjan Avenue, is a crucial alignment that connects Tollygunge in the south with Bagbazar in the north. "Since SP Mukherjee Road has become cratered, many motorists now prefer taking the narrow Sadananda Road and Pratapaditya Road. Now, if we are assured of a smooth ride, we may take SP Mukherjee Road more often," said Debasish Das, a Mudiali resident.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
2 hours ago
- Time of India
Sipara-Mahuli stretch complete: Minister
Patna: The elevated road being constructed between Sipara and Mahuli has been completed, with the work of ramp over at Bhupatipur, said road construction minister Nitin Nabin during an inspection of the Mithapur-Mahuli road project on Saturday. He said the Rs 1,400 crore project would benefit lakhs of residents in south Patna. The minister said the 9 km stretch from Bhupatipur to Punpun would be inaugurated soon. Once operational, the travel time between Sipara and Mahuli, covering 11 km, would be reduced to just 10 minutes, Nabin said. The minister was accompanied by RCD secretary Sandeep Kumar R Pudakalkatti and other senior officials from the Bihar State Road Development Corporation Limited, including CGM Bablu Kumar and project DGM Prem Shankar. "The project is being executed in two phases. Phase-I, covering the Sipara to Ram Gobind Singh Mahuli road, is complete. Phase-II includes additional provisions for a 2.10 km elevated four-lane road from Mithpur to Sipara and a 2.20 km four-lane road from Mahuli to Punpun," Nabin said. This infrastructure development is part of a larger four-lane closed circuit corridor connecting Patna to Gaya, Biharsharif and Bakhtiyarpur via NH-83, NH-82, NH-31, and NH-30. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Pierce Brosnan's Wife Lost 120 Pounds - This Is Her Now Patna: The elevated road constructed between Sipara and Mahuli has been completed, with the work of ramp over at Bhupatipur, said road construction minister Nitin Nabin during an inspection of the Mithapur-Mahuli road project on Saturday. He said the Rs 1,400 crore project would benefit lakhs of residents in south Patna. The minister said the 9 km stretch from Bhupatipur to Punpun would be inaugurated soon. Once operational, the travel time between Sipara and Mahuli, covering 11 km, would be reduced to just 10 minutes, Nabin said. The minister was accompanied by RCD secretary Sandeep Kumar R Pudakalkatti and other senior officials from the Bihar State Road Development Corporation Limited, including CGM Bablu Kumar and project DGM Prem Shankar. "The project is being executed in two phases. Phase-I, covering the Sipara to Ram Gobind Singh Mahuli road, is complete. Phase-II includes additional provisions for a 2.10 km elevated four-lane road from Mithpur to Sipara and a 2.20 km four-lane road from Mahuli to Punpun," Nabin said. This infrastructure development is part of a larger four-lane closed circuit corridor connecting Patna to Gaya, Biharsharif and Bakhtiyarpur via NH-83, NH-82, NH-31, and NH-30.


NDTV
9 hours ago
- NDTV
Electric Scooters To Consider Over Ather Rizta, And Why?
Since its launch in July 2024, the Ather Rizta has gained popularity, selling over 100,000 units and earning praise for its family-friendly design and good range. However, as the electric scooter market grows, other models are emerging that provide better technology, performance, and value. In this article, we will look at three electric scooters that could be a good alternative to the Ather Rizta. Ultraviolette Tesseract The Ultraviolette Tesseract is an electric scooter built for those who crave speed and advanced features. It comes with different battery options, allowing for a range of up to 261 km on a single charge and a top speed of 125 km/h. The EV scooter is packed with modern features, including radar-based safety systems (ADAS), dual dashcams, wireless phone charging, a 7-inch touchscreen dashboard, and haptic feedback alerts for added rider safety. Also Read: KTM 450 Rally Replica Unveiled Alongside Special Sanders Edition In addition to its performance, the Tesseract offers 34 litres of under-seat storage and can charge from 20 per cent to 80 per cent in just 30 minutes. It's a great choice for anyone looking for more than just a basic scooter. Initially, the scooter was offered at an introductory price of Rs 1.20 Lakh (ex-showroom) for the first 50,000 buyers. Currently, the price of the electric scooter starts from Rs 1.45 Lakh (ex-showroom). TVS iQube If you need a dependable scooter for everyday commuting, the TVS iQube is a great option, offering 2.2 kWh, 3.5 kWh, and 5.3 kWh battery packs, making it perfect for city travel. One of its biggest advantages is TVS's wide network of dealerships and service centers, which gives buyers confidence. The iQube also comes with useful features like regenerative braking, app diagnostics, reverse assist, and smart connectivity, all designed to be user-friendly. For anyone seeking a reliable brand with strong performance, the iQube is a good choice. The TVS iQube S starts at Rs 1.09 lakh (ex-showroom) for the five-inch screen model and Rs 1.17 lakh (ex-showroom) for the seven-inch version. It has a 3.5 kWh battery for a range of 145 km. The TVS iQube ST costs Rs 1.28 lakh (ex-showroom) for the 3.5 kWh battery model, while the larger 5.3 kWh variant, offering up to 212 km of range, is priced at Rs 1.59 lakh (ex-showroom). Bajaj Chetak The Bajaj Chetak Electric combines a classic scooter look with modern EV technology. It has a range of 153 kilometres and a top speed of 73 km/h, which is perfect for city commuting. The affordable price tag of the electric scooter comes at the cost of a few features. However, it still has a feature list aimed at fulfilling owners' requirements. The list includes hill hold assist, a colour LCD cluster with Bluetooth and music control, call management, ride modes (Eco & Sports), LED headlights, and more. The Bajaj Chetak is available from a starting price of Rs 1.07 Lakh (ex-showroom) and goes up to 1.37 Lakh (ex-showroom).


News18
11 hours ago
- News18
Car Insurance May Get Costlier, Here's How Much You'll Need To Pay
Last Updated: The Road Transport Ministry is likely to decide on the proposal in 2–3 weeks. A draft notification will be issued for public feedback once it gets approval The government is considering an imminent increase in the motor third-party insurance premium, based on recommendations from the insurance sector regulator, IRDAI. According to a CNBC-TV18 report, this proposal has led to a significant rise in the shares of companies such as ICICI Lombard General Insurance, Go Digit General Insurance, and New India Assurance Company. IRDAI has suggested an average premium increase of 18 percent, with some vehicle categories seeing hikes of up to 20 to 25 percent. The Ministry of Road Transport and Highways (MoRTH) will make the final decision on this proposal, expected within the next 2 to 3 weeks. Once approved, a draft notification will be issued for public consultation, followed by a review process before implementation. Moneycontrol published this report, and due to its impact, the shares of insurance companies saw a rise. Shares of ICICI Lombard rose by 7 percent, reaching the highest level in the last three months. Shares of Go Digit Insurance rose by about 5 percent, marking the highest level in the last six months. At the same time, shares of New India Assurance Company rose by about 2 percent. What Is Third Party Insurance? Motor third-party insurance compensates for damages to a third party in a road accident, covering expenses if a person is injured or their property damaged by your vehicle. This insurance is mandatory under the Motor Vehicle Act, 1988, ensuring that the insurance company covers the costs if someone else is harmed by your vehicle. There has been no change in the premium for the last three to four years, despite various uncertainties in the sector. Experts believe that a 20 percent premium increase could enhance the performance of insurance companies and provide relief to the sector. For the financial year 2024-25, IRDAI has outlined the proposed increases based on engine capacity (cc) for private vehicles, including cars and two-wheelers. Private vehicles mainly include private cars and two-wheelers. IRDAI determines the premium based on engine capacity (cc). The following is the estimated hike based on current rates and the proposed 18–25 percent increase for the financial year 2024–25. The current premium for private cars up to 1000 cc is Rs 2,094. With an 18% increase, it will rise to Rs 2,471, and a 25% hike will raise it to Rs 2,618. For cars with engine capacity between 1000 cc and 1500 cc, the current premium is Rs 3,416. An 18% increase will take it to Rs 4,031, while a 25% hike will raise it to Rs 4,270. For cars above 1500 cc, the current premium is Rs 7,897. With an 18% hike, it will become Rs 9,318, and with a 25% increase, it will reach Rs 9,871. In the case of two-wheelers, the premium for bikes up to 75 cc is currently Rs 538. An 18% increase will make it Rs 635, while a 25% hike will raise it to Rs 673. For bikes between 75 cc and 150 cc, the current premium stands at Rs 720. An 18% rise will increase it to Rs 850, and a 25% hike will bring it to Rs 900. For bikes between 150 cc and 350 cc, the premium is Rs 1,366. An 18% hike will take it to Rs 1,612, while a 25% increase will raise it to Rs 1,708. For bikes above 350 cc, the premium is currently Rs 2,804. With an 18% hike, it will go up to Rs 3,309, and a 25% increase will raise it to Rs 3,505. First Published: June 06, 2025, 19:23 IST