logo
Erode Corporation ensures uninterrupted drinking water supply

Erode Corporation ensures uninterrupted drinking water supply

The Hindu21-04-2025

With adequate water stored at the barrage constructed across the Cauvery River at Uratchikottai in Bhavani, the Corporation has assured residents that there will be no disruption in the supply of protected drinking water during the summer.
The city spans 109.52 sq km and comprises 60 wards across four zones, accommodating a total of 1,69,913 households and 27,386 commercial establishments. Under the Dedicated Water Supply Scheme, raw water is drawn from the river at Varadhanallur near the Lower Mettur Barrage Power House – 4 at Uratchikottai and pumped into a water treatment plant with a capacity of 120 million litres per day (MLD).
Of this, 52 MLD of treated drinking water is pumped to tanks at Suriyampalayam and VOC Park, which together have a total capacity of 1.48 crore litres. From these tanks, water is distributed to residents and establishments through 69 overhead tanks located across the 60 wards. The scheme ensures a daily supply of 81.10 MLD of water to the civic body, providing 135 litres per person.
Currently, the discharge from the Mettur Dam into the river is 1,000 cusecs. The water level in the dam stands at 107.59 feet, compared to its full reservoir level of 120 feet, with a storage of 75.02 tmc ft against a total capacity of 93.47 tmc ft.
A senior Corporation engineer told The Hindu that sufficient water is regularly stored in the main well in the river at Varadhanallur and that adequate water is also available in the dam. The engineer affirmed that there is no water shortage and assured regular supply to the residents.
On Monday, Corporation Commissioner in charge and Deputy Commissioner K. Dhanalakshmi held a meeting with officials of the Tamil Nadu Water Supply and Drainage Board to ensure uninterrupted water supply.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

After Calcutta High Court order, 15-year-old eligible to get surname of stepfather
After Calcutta High Court order, 15-year-old eligible to get surname of stepfather

Indian Express

time7 hours ago

  • Indian Express

After Calcutta High Court order, 15-year-old eligible to get surname of stepfather

In Bengal, a 15-year-old's parents had separated the year he was born, 2010, and their marriage was dissolved by a civil court decree in September 2016. The only link he had to his biological father was his surname. In March 2020, his single mother remarried, and the child was subsequently cared for by both his mother and stepfather. As the biological father had no contact with the child and had been living abroad, the mother sought to change the child's surname to that of his stepfather. The mother and her second husband filed a writ petition seeking a direction to the Kolkata Municipal Corporation to change the child's surname, replace the father's name on the birth certificate, and amend the mother's surname on it. Significantly, the biological father's counsel informed the court that he had no objection to these requests — but the Kolkata Municipal Corporation opposed them. Referring to Section 15 of the Registration of Births and Deaths Act, 1969, and Sections 454 and 455 of the Kolkata Municipal Corporation Act, 1980, the Corporation argued that it 'lacks the authority' to alter names in the birth record. The KMC's counsel submitted that these statutory provisions allow only for the correction of clerical or factual errors. The counsel maintained that in cases of adoption, a 'separate register is maintained', and changes 'can only be made upon submission of a valid adoption order from a competent court'. In this case, on May 16 this year, the court found that the biological mother had the right to seek alteration of the child's name under Section 454 of the Kolkata Municipal Corporation Act, 1980, especially as the biological father did not object to the relief sought. Although the court declined to grant the prayer for changing the father's name on the birth certificate, it allowed the surname change. The order stated, 'I am not inclined to grant the prayer for changing the father's name in the birth certificate in the absence of a valid adoption order. In my view, such a change can only be considered upon the legal adoption of the minor by (the stepfather).' Justice Kaushik Chanda of the Calcutta High Court observed, 'A plain reading of Section 454 makes it evident that the Corporation has the authority to alter a child's name… In my considered view, the term 'name' under Section 454 includes both the given name and the surname. Therefore, the provision enables the Corporation to amend the child's full name, including the surname, provided that the application is submitted within 60 months from the date of registration.' The court noted, 'However, I am also of the view that the 60-month period, while statutorily prescribed, should not be treated as an absolute bar. Courts may, in appropriate cases, interpret this time frame flexibly, particularly where delays occur due to circumstances beyond the control of the applicant. If, for instance, a parent or guardian provides a valid explanation for the delay, the court may permit the change even after the 60-month period has lapsed.' The court said that the mother is at 'liberty' to make an application before the Kolkata Municipal Corporation for changing her surname and the surname of the minor child to in Corporation records, 'supported by appropriate documentation evidencing her second marriage.'

Proposed air enclave a work in progress, set to boost Coast Guard's capabilities: DG S. Paramesh
Proposed air enclave a work in progress, set to boost Coast Guard's capabilities: DG S. Paramesh

The Hindu

time16 hours ago

  • The Hindu

Proposed air enclave a work in progress, set to boost Coast Guard's capabilities: DG S. Paramesh

Coast Guard Director General S. Paramesh on Saturday described the long-pending proposal for an air enclave for the maritime law enforcement agency in Thiruvananthapuram as a 'work in progress.' Once all the approvals are secured and it gets commissioned, the enclave will give a fillip to the Coast Guard's charter of duties including search and rescue (SAR) operations in the southern region, he said. According to him, the enclave will permanently station helicopters, considerably enhancing operational preparedness and response to emergencies out at sea. 'Fixed-wing aircraft can come here on detachment and operate from here,' the Flag Officer told The Hindu on Saturday after inaugurating a new, 76.7-m-long jetty for Coast Guard vessels at Vizhinjam. Although the Coast Guard Station at Vizhinjam is equipped with fast patrol vessels and interceptor boats, air support has to come from Kochi, where the Coast Guard has its regional headquarters. The commissioning of a major seaport at Vizhinjam, SAR related to fishing vessels and maritime emergencies such as the recent sinking of the container ship MSC Elsa underscore the need for the increased presence of the Coast Guard in the southern part of Kerala. Expanded Coast Guard presence in Thiruvananthapuram district will definitely help during incidents such as the sinking of MSC Elsa since it is the first responder to maritime emergencies, Mr. Paramesh said. 'It (the sinking of MSC Elsa) is a very unfortunate incident. The matter is being investigated by the Director General Shipping. Once they finish the investigation, we will come to know the reasons that caused the ship to flounder and sink,' he said. The new Coast Guard jetty at Vizhinjam is expected to enhance the Coast Guard's operational preparedness significantly, the Flag Officer said. The construction of the jetty, though started in September 2019, had been delayed on account of the presence of a half-submerged tug at the was resumed in April 2024.

Nageswara Rao Park to be renovated at a cost of ₹11.64 crore
Nageswara Rao Park to be renovated at a cost of ₹11.64 crore

The Hindu

timea day ago

  • The Hindu

Nageswara Rao Park to be renovated at a cost of ₹11.64 crore

The Greater Chennai Corporation proposes to renovate the iconic K. Nageswara Rao Pantulu Park, popularly known as Nageswara Rao Park, in Mylapore under the Namakku Naame scheme at an estimated cost ₹11.64 crore. P.S. Kumaraswamy Raja, Premier of the Madras Presidency, inaugurated the park on October 20, 1949. The Corporation's publication, Caring for Chennai, notes that the park was once a waterbody, called Arathakuttai, and it was gifted to the civic body by private owners for development. The park was named after Kasinathuni Nageswara Rao, better known as Nageswara Rao Pantulu, a freedom-fighter and resident of the area. Raghunathan, a long-time resident of Mylapore, says the park was serene and calm those days. 'People of all age groups visit this park even now. The implementation of the Metro Rail project has made the park dusty. But I am sure after the renovation and the completion of the Metro Rail project, the park will be among the most attractive spots,' he says. According to the Corporation, the renovation will be completed in three months. It involves civil infrastructure upgrade, landscaping, installation of new fixtures, and development of pedestrian pathways and play areas. Baskar Seshadri, a social activist and resident of Mylapore, says the park needs attention in certain areas. 'There is no compound wall on the eastern side. While there is a gym, food kiosks, toilets, and seating are required. They could be located outside the park to prevent littering, without inconveniencing pedestrians,' he says.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store