logo
Steel girder erection work at Delhi-Meerut RRTS corridor, Barapulla flyover to remain shut in nights

Steel girder erection work at Delhi-Meerut RRTS corridor, Barapulla flyover to remain shut in nights

Indian Express30-04-2025

In the view of steel girder erection for the Delhi-Meerut RRTS corridor, the Barapulla flyover will remain shut at nights till May 10, according to an advisory from the Delhi Traffic Police.
'In view of steel girder erection work for the Delhi –Meerut RRTS Corridor above Barapulla Flyover, traffic diversions will be in place on Barapulla Road (both carriageways),' the advisory reads.
'The work has been extended till 10.05.2025 — between 12:00 AM to 05:00 AM daily. Please plan your commute accordingly and follow the advisory,' it added.
The activity is expected to impact traffic movement in the surrounding areas. To ensure smooth vehicular flow, necessary diversions and arrangements have been put in place.
Depending on requirement, traffic diversions will be implemented on the following stretches:
Barapulla Flyover (Sarai Kale Khan/DND to AIIMS side):
Commuters coming from ITO, NH-24 & NH-9, Sarai Kale Khan & DND towards Maharani Bagh, Sundial, and Sidharth Extension for Lala Lajpat Rai Marg & AllMS are advised to take Ring Road.
Barapulla Flyover (AIIMS/INA/Lodhi Road to Akshardham & DND side):
Commuters coming from AlIMS, INA & Lodhi Road towards Akshardham, Greater Noida & DND are advised to use Ring Road and Lala Lajpat Rai Marg.
The 82-km RRTS corridor originates at Sarai Kale Khan in New Delhi and terminates at Modipuram in Meerut. The construction of sections — New Ashok Nagar-Sarai Kale Khan and Meerut South-Modipuram — is underway.
The girder erection work is being done at the stretch between New Ashok Nagar-Sarai Kale Khan, an official said.
The 55-km RRTS corridor between New Ashok Nagar and Meerut South with 11 stations became operational in January this year.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Dharuhera: An Emerging Real Estate Hub Moving From Periphery To Prominence
Dharuhera: An Emerging Real Estate Hub Moving From Periphery To Prominence

News18

time02-06-2025

  • News18

Dharuhera: An Emerging Real Estate Hub Moving From Periphery To Prominence

Last Updated: Dharuhera in Haryana's Rewari district is evolving from a manufacturing hub to a prime real estate corridor, attracting investors with its strategic location, say realty players. Dharuhera, which is located in Haryana's Rewari district, is gaining substantial recognition among investors. Previously seen as a manufacturing zone, the area is quickly transforming into a high-potential real estate growth corridor. Strategically positioned along the Delhi-Jaipur corridor (NH-48), Dharuhera enjoys seamless road connectivity to Gurugram, Delhi, and beyond, making it a vital junction for both industrial logistics and residential migration. Enhancing its appeal is the upcoming Delhi-Alwar Regional Rapid Transit System (RRTS), expected to be operational by April. The RRTS will significantly reduce commute times between Delhi and Dharuhera, with a dedicated station planned in the city. This transformative connectivity is set to turn Dharuhera into a true commuter suburb and investment hotspot within the NCR ecosystem. The area's real estate momentum is deeply anchored in its booming industrial ecosystem. With over 1,800 industries operating in and around the region, Dharuhera serves as a major employment hub, supporting a workforce of more than 1.6 million people. Global and domestic giants like Hero MotoCorp, Honda, Carlsberg, Gillette, Amul, and Jaquar have significant operations here, driving sustained demand for both rental and owned housing. The steady influx of industrial workers, professionals, and service providers ensures a reliable, end-user-driven real estate market, offering long-term stability for developers and investors. The region has seen one of the most compelling appreciation stories in NCR's periphery. According to data from 99 acres, residential plot prices have surged from Rs 20,000 per sq yard in 2019 to Rs 65,000-Rs 70,000 per square yard in 2025, reflecting a near threefold increase in just five years. The 2024 average stood at Rs 42,912 per sq yard, with select localities even breaching the Rs 57,000 mark. Despite this sharp rise, Dharuhera remains considerably more affordable than Gurugram, positioning it as a high-upside investment destination for early movers seeking both capital appreciation and long-term growth potential. Vishesh Rawat, vice-president & head of marketing, sales and CRM, M2K Group, said, 'From an industry standpoint, it's clear that infrastructure is the ultimate catalyst, and Dharuhera is proving that in real time. With the Delhi-Alwar RRTS construction work commencing early 2026 and NH-48 offering seamless access to Gurugram and Delhi, this region is no longer peripheral; it's pivotal." There is a classic pattern that where connectivity goes up, investor interest surges, and real estate values follow. What makes Dharuhera exceptional is that it offers all the right ingredients from mobility and affordability to industrial depth, at a reasonable price just next to Gurugram. This is not a wait-and-watch market; Dharuhera is entering its breakout phase, he added. Dharuhera's growth is driven by a balanced mix of affordability, location, and employment proximity. Residential properties yield between 2.2% and 3% annually, with consistent demand from industrial workers, young professionals, and budget-conscious families. On the commercial front, rental yields range from 6% to 8%, especially for properties located near highways and industrial clusters where footfall and utility are high. The tenant base is diverse, ranging from blue- and grey-collar workers employed in manufacturing units to IT and service professionals commuting from Gurugram, all seeking cost-effective yet well-connected rental options. Ankit Kansal, managing director of 360 realtors, said, 'From our lens, Dharuhera checks all boxes: affordability, connectivity, and growth potential. In the last five years, plot prices have more than doubled, yet remain far more accessible than Gurugram or Manesar. The RRTS and DMIC projects are not just infrastructural add-ons. Besides, investor sentiment has never been stronger, and with institutional developers entering, the region is evolving from speculative interest to end-user preference. Thus, we foresee that the market dynamics here point to sustained growth." Vineet Chellani, founder and CEO of Asset Deals, said, 'We are seeing a paradigm shift in buyer profiles in Dharuhera. Earlier dominated by blue-collar rental demand, the region is now attracting upwardly mobile families and first-time homeowners. Enhanced road and rail connectivity, policy reforms, and improved social infrastructure have pushed Dharuhera into the investment spotlight. From budget apartments to plotted developments, demand is surging across segments." With yields averaging 6-8% in commercial spaces, even small-ticket investors are actively entering the market. 'Hence, Dharuhera's growth is not speculative, it's structural, and the next five years will define Dharuhera's leap into the NCR's big league," he added. tags : real estate Location : New Delhi, India, India First Published: June 02, 2025, 17:58 IST News business » real-estate Dharuhera: An Emerging Real Estate Hub Moving From Periphery To Prominence

Long queues at CNG stations add to commuters' woes
Long queues at CNG stations add to commuters' woes

Time of India

time13-05-2025

  • Time of India

Long queues at CNG stations add to commuters' woes

Bhopal: Visit any CNG (Compressed Natural Gas) fuel station in the city, and you will find long queues of vehicles, including autos, cabs, cars, SUVs, and even buses, waiting for their turn to refill. This has become a daily scene outside nearly every CNG pump in the the city having around 35 CNG refill stations, both in and out of the city, they are proving grossly inadequate to meet the fuelling demands of the rising number of registered CNG kit-fitted vehicles. This imbalance has led to frequent congestion at pumps, with drivers often waiting over half an hour just to worsens the situation further is the underutilisation of the available resources. Many stations operate with only one or two active vending machines, even when four or more are installed. This limited operational capacity contributes significantly to longer wait times and mounting frustration among vehicle owners."The line of vehicles stretches on the road outside the refill station during peak hours. If all machines worked, the crowd could be managed better," said Faizan, an auto-rickshaw driver waiting in line at a official associated with the CNG pump said that the popularity of CNG vehicles continues to rise, fuelled by significantly lower running costs compared to petrol-driven vehicles. According to industry estimates, running a vehicle on CNG is nearly fifty percent cheaper than petrol, which is prompting many private vehicle owners and commercial operators to switch to the eco-friendlier Saxena, a CNG car owner, told TOI that he purchased the CNG car for his daughter. Its running cost is as low as a scooter running on petrol. But refuelling the CNG in the car is increasingly becoming cumbersome. There are two CNG fuel stations located near his home, one in TT Nagar and another on Bhadbhada Road. Whenever he visits these fuel stations, he finds a long queue of vehicles. Most of the time, he finds that one of the vending machines is not working. When he raises objections, the workers make excuses, either that the machine is not working or there is a shortage of staff. They do not want to increase said, "I'll not go to a pump located on the city outskirts just to refill gas in my car. The situation at most of the CNG pumps located in the city area is nearly the same. One will find long queues of vehicles."Another car owner, Yogesh Mehra, a resident of Awadhpuri, told TOI that whenever he visits a CNG station for refuelling, he has to wait for at least 30 minutes. He said that refilling gas in a vehicle takes a minimum of five minutes, but the number of vehicles already waiting for their turn remains Rai, a resident of Katara Hills, said that there is a CNG pump in the Katara Hills area where he goes for refuelling his car. Many times, he finds a long queue of vehicles waiting for their turn. Sometimes, the pump goes out of gas, so he has to visit Gyarah Meel or near AIIMS for refuelling. "But I'll not go to Gyarah Meel to refuel my car. And the pumps located in the city remain clogged with vehicles," he added that while the number of CNG vehicles grows steadily, infrastructure expansion has not kept pace, and the common man has to face the consequences. Unless the number of refill stations and operational vending units is increased urgently, the situation will worsen, especially with more people opting for CNG amid rising fuel prices.

Delhi-Meerut rapid rail corridor: Installation of precast slab track complete, says NCRTC
Delhi-Meerut rapid rail corridor: Installation of precast slab track complete, says NCRTC

Indian Express

time12-05-2025

  • Indian Express

Delhi-Meerut rapid rail corridor: Installation of precast slab track complete, says NCRTC

The National Capital Region Transport Corporation (NCRTC) has completed the installation of all 169 track km (TKM) of precast slab track on the Delhi-Ghaziabad-Meerut corridor of India's first semi-high-speed Regional Rapid Transit System (RRTS). Precast slabs are those that are manufactured elsewhere and then brought to the site, instead of being manufactured on the site. According to NCRTC, the work involved the production and laying of nearly 47,000 high-precision precast concrete slabs that will form the base of the railway tracks. These have been installed across both elevated and underground sections of the corridor. For the first time in India, precast track slabs have also been used at track turnouts — junctions where trains can switch from one track to another. A total of 135 such turnouts, involving eight different configurations and 15 slabs each, have been installed. In total, the project used slabs of 140 different types, making logistics and inventory management a major challenge during execution. The track system is designed to support trial speeds of up to 180 kmph and an operational speed of 160 kmph. At present, trains are undergoing trial runs at higher speeds on certain sections. Officials said that the track's performance is critical to safety and reliability in a high-speed rail system, especially since such systems lack redundancy — there is usually no backup track available in case of failure. The slab track system was selected through a detailed process involving international technology transfer. From design and equipment selection to training and troubleshooting, the system provider was involved throughout the implementation phase. Currently, 55 km of the corridor — from New Ashok Nagar in Delhi to Meerut South in Uttar Pradesh — has been commissioned and is operational. Trial runs are underway on other stretches, with the entire 82-km corridor expected to become fully operational by June 2025. A timeline of the project -October 2023: 17-km Priority Section between Sahibabad and Duhai Depot inaugurated -March 2024: 17 km stretch between Duhai and Modinagar North inaugurated -August 2024: Meerut South RRTS Station operationalised -January 2025: 13 km stretch between Sahibabad and New Ashok Nagar inaugurated by PM Narendra Modi -June 2025: Complete Delhi-Meerut corridor expected to be operational

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store