
ISRO VSSC recruitment 2025: Apply for 82 Tech Assistant and other posts till June 18, details here
Vikram Sarabhai Space Centre (VSSC) has invited online applications from eligible candidates for the recruitment of Technical Assistant, Scientific Assistant, and Library Assistant posts under Advt. No. RMT335. Eligible candidates can apply for the posts at vssc.gov.in till June 18, 2025.
The recruitment drive aims to fill 82 vacancies. The applicants should be between the ages of 18 to 35 years as on June 18, 2025. Candidates can check the vacancy details, eligibility criteria, and other details available in the notification below:
Here's the official notification.
Application Fee
All applicants will have to pay a fee of Rs 750. Female / Scheduled Castes (SC) / Scheduled Tribes (ST) / Ex-servicemen [EX-SM] and Persons with Benchmark Disabilities (PwBD) candidates will be refunded full fee subject to the condition that the candidates should appear in the written test. For other candidates, an amount of Rs 500 will be refunded in due course duly deducting bank charges as applicable on appearing written test.
Steps to apply for Tech Asst. and other posts
Direct link to apply.
Selection Process
The applicants will be shortlisted on the basis of the written test and skill test.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
27 minutes ago
- Time of India
Diversification, policy reforms aid Odisha's industrial progress: CM
1 2 3 4 Bhubaneswar: Ahead of the BJP govt's one-year anniversary, chief minister Mohan Charan Majhi on Sunday said that Odisha is becoming a "diversified industrial powerhouse" and a top investment destination in the country by not just approving investments worth Rs 4.5 lakh crore but also successfully grounding projects worth Rs 1.78 lakh crore. "Odisha is no longer just a minerals and metals hub. We are becoming a diversified industrial powerhouse, where opportunity flows from port to plant, and from cities to every aspirational district," the CM said during a meeting with leading industrialists and entrepreneurs in the city. "We are not merely sanctioning projects; we are grounding them. We are not making promises; we are delivering results — at scale, with speed, and with purpose," Majhi said. Mapping the industrial growth story, he said, "In just one year, we approved over 200 large and mega projects. Odisha now stands for credibility, competitiveness and commitment to progress." The CM said industries are diversifying from minerals and metals to green energy, agro-processing, technical textiles and shipbuilding, with investments flowing into 20 sectors. He attributed the success to proactive policy push like outcome-based governance and a "whole-of-govt model" that emphasises seamless coordination between departments and agencies. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 오스템 임플란트 받아가세요 임플란터 더 알아보기 Undo Roadshows in Delhi, Mumbai and Singapore have pitched Odisha as a hub for chemical, electronics, capital goods and advanced manufacturing, while two major events, Pravasi Bharatiya Divas and Utkarsh Odisha — Make in Odisha Conclave-2025, attracted global attention and industrial giants expanding the state's economic footprint, Majhi said. Majhi also spoke about the ambitious vision for 'Samruddha Odisha' by 2036, aligning with the centenary celebration of formation of the state. He outlined four key priorities in the upcoming year, including the launch of new policies targeting emerging and sunrise sectors, expansion of land banks, logistics corridors and critical infrastructure. He emphasised revamping the single-window system with digital-first project tracking and simplification of regulatory compliances to speed up approvals and encourage entrepreneurship. To support industrial labour, the state is developing 13 workers' hostels and modernising seven industrial estates with plug-and-play infrastructure. Furthermore, 30 MSME parks and 8 new industrial areas have been initiated to empower small enterprises and entrepreneurs. Industries minister Sampad Chandra Swain, MSME minister Gokulananda Mallik, development commissioner Anu Garg, and senior officers, among others, attended the event.


Time of India
44 minutes ago
- Time of India
BMC imposes Rs 8 lakh fine on engrs, contractors for piling up debris
1 2 3 4 5 Bhubaneswar: When it comes to disposal of construction and demolition waste, it looks like a govt department has been frequently penalised by the Bhubaneswar Municipal Corporation (BMC) for allowing debris to pile up at work sites. BMC officials said the works department and contractors who had taken up projects on its behalf were penalised to the tune of Rs 8 lakh this month for piling up debris during construction and repair of govt quarters and buildings "Executive engineers of division-2 and division-4 of the works department under Bhubaneswar circle were fined Rs 2 lakh each for piling up construction and demolition (C&D) waste. A construction company was fined Rs 3 lakh, and two contractors Rs 50,000 each," said BMC assistant commissioner N Ganesh Babu. According to BMC rules, waste generated through construction, repair, transportation, remodelling and demolition of private and govt establishments, households, roads and drains should be handled properly to avoid piling up on roads. He said the enforcement squads spotted the debris stacked for days on the roadside, thus encroaching on public spaces and causing inconvenience to pedestrians and motorists. The piled-up waste is an eyesore and can choke drains during monsoon. "In view of monsoon, the squads have intensified enforcement activities," Babu added. Dhyanchand Naik, chief engineer (roads) of the works department, said he would look into the matter and issue necessary directions to the divisions concerned to clear C&D waste. "I will look into what construction and repair works had created debris and the fine imposed," he told TOI. Last year, BMC issued a notice to educate people on how to handle C&D waste. "There are a lot of stakeholders as far as C&D waste litter and disposal are concerned. Through the notice, we conveyed to people that if they don't follow the norms of handling C&D waste, they will have to pay a penalty. Yet, we see both private and govt agencies keeping debris on roads," a BMC official said. BMC officials said they have provision for designated spaces for dumping such waste. "We have also given a toll-free number (1929), which can be used by owners of C&D waste to ask for BMC vehicles to clear the waste. For the removal, a certain amount will have to be paid. If they don't use BMC resources and take C&D waste to the designated station on their own, they won't have to pay anything," an official said. In another development, the civic body said payments will be withheld for city-based contractors unless they show certificates of clearance of C&D waste from work sites. "City engineers have been asked to write to the contractors to abide by C&D disposal rules; otherwise, their payments will be held back," a BMC sanitation official said.


Time of India
an hour ago
- Time of India
Delhi to get 3 new water treatment plants, additional supply of 235 MGD
New Delhi: To address the growing water demand of its expanding population, Delhi will see the construction of three new water treatment plants, senior officials of (DJB) have said. Tired of too many ads? go ad free now These facilities will be located at Iradat Nagar, near Narela, Najafgarh in south-west Delhi, and Chhatarpur in south Delhi. Collectively, the new plants are expected to supply an additional 235 million gallons per day (MGD) of treated water to the capital. The Iradat Nagar and Chhatarpur plants will each have a capacity of 80 MGD, while the Najafgarh plant will have a capacity of 75 MGD. There are also proposals to source water for these plants from dams in Himachal Pradesh and Uttarakhand. Officials said a dam proposed on the Giri River in Himachal Pradesh is expected to supply 275 MGD of water to the capital. DJB has already provided Rs 214.84 crore to the Himachal Pradesh Power Corporation Limited (HPPCL) for the project. Similarly, DJB has also made financial commitments toward other proposed dams: Rs 8.1 crore for the Kishau Dam on the Tons River in Uttarakhand and Rs 7.7 crore for the Lakhwar Vyasi Dam on the Yamuna River, also in Uttarakhand. According to DJB officials, the city's current population exceeds 2.5 crore. Based on the standard requirement of 50 litres per person per day, Delhi requires about 1,250 MGD of water. However, the current supply falls short at around 990 MGD. At present, the city's nine water treatment plants together supply approximately 1,000 MGD. The new projects are part of a broader effort to bridge the supply gap and ensure consistent water availability amid rising demand. Tired of too many ads? go ad free now In recent years, several areas in Delhi have faced disruptions in water supply due to elevated ammonia levels in the Yamuna River, which hindered the operations of existing treatment plants. These ammonia surges resulted in periodic supply cuts, leaving some localities with little or no water. Last winter, the Wazirabad water treatment plant operated at half capacity due to contamination, while output from the Chandrawal plant was cut by 10%. The Haiderpur, Bawana, and Dwarka facilities also experienced reductions ranging between 5% and 10%, impacting large parts of the city. DJB's 2023 Economic Survey noted only a marginal increase in the capacity of the city's water treatment plants—from 943 MGD in 2022 to 946 MGD in 2023, a rise of just 0.31%. Despite supply challenges, Delhi govt continues to provide up to 20 kilolitres of free water monthly to households with metered water connections. To further strengthen the infrastructure, Delhi Jal Board will undertake a new Rs 300-crore project to lay an 11-kilometre pipeline. This initiative aims to mitigate intermittent water supply issues stemming from high ammonia levels in the Yamuna. The planned conduit will run from the Haiderpur Water Treatment Plant to the Wazirabad barrage, with work underway on detailed specifications and cost estimates.