
Cosmo First commences commercial production of new BOPP film line at Waluj
Cosmo First announced that new BOPP (Biaxially Oriented PolyPropylene) Film Line at Company's existing manufacturing plant located at Waluj, Aurangabad, Maharashtra has commissioned commercial production from 01 June 2025.
This state-of-the-art 10.4 meter width 5-layer BOPP line is one of the highest capacity line (81.2k mt per annum) in the world with most advanced technology.
With this, the Company's BOPP capacity has increased to about 277k mt per annum.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
2 hours ago
- Time of India
JSW Energy shares in focus on commissioning 281 MW renewable capacity, signing PPA for 250 MW wind project
Shares of JSW Energy are expected to be in the spotlight on Friday, June 6, following the company's announcement of the successful commissioning of 281 MW of organic renewable energy capacity, which includes 215 MW of solar and 66 MW of wind power. With this addition, JSW Energy 's total installed capacity has now risen to 12,499 MW, enhancing its ability to capitalise on the upcoming peak demand season and reinforcing its commitment to green energy. 'JSW Energy Limited ('The Company') is pleased to announce the successful commissioning of 281 MW of organic renewable energy capacity with solar capacity of 215 MW and wind capacity of 66 MW, taking the current installed capacity to 12,499 MW. This capacity addition is timely in nature and will enable the Company to benefit from the peak wind season during the year and will contribute meaningfully to overall renewable output,' the company informed via a regulatory filing. Following the addition, the company's renewable energy share in overall capacity has grown significantly, installed wind capacity now stands at 3,482 MW, solar at 1,968 MW, and hydro at 1,391 MW, pushing the renewable component to 55% of the total portfolio. In another major development, JSW Renew Energy Three Ltd, a subsidiary of JSW Energy, has signed a Power Purchase Agreement (PPA) with Adani Electricity Mumbai Ltd for a 250 MW STU-connected wind project . The PPA is valid for 25 years at a tariff of Rs 3.65/kWh. The project, located in Maharashtra, is expected to be commissioned within the next 24 months. JSW Energy also reaffirmed its robust project pipeline, with 29.9 GW of total locked-in generation capacity, including 12.5 GW operational and 12.4 GW under construction. It also boasts 29.3 GWh of locked-in energy storage capacity. Under its Strategy 3.0 roadmap, the company aims to achieve 30 GW of generation and 40 GWh of storage capacity by FY2030, while targeting carbon neutrality by 2050. JSW Energy shares on Thursday closed flat at Rs 508.15 on the BSE. ( Disclaimer : Recommendations, suggestions, views and opinions given by the experts are their own. These do not represent the views of The Economic Times)


Mint
8 hours ago
- Mint
IREDA share price dips 2% as it launches QIP to raise ₹5000 crore: Here are key details
Stock Market Today: IREDA share price declined up to 2% in the morning trade on Friday The Renewable Energy firm launched a QIP to raise ₹ 5000 crore: Here are key details As per details provided by Indian Renewable Energy Development Agency Ltd of IREDA and with reference to the meeting of Board of Directors held on January 23, 2025, followed by approval of the shareholders of the Company by way of a special resolution passed on February 24, 2025, the Board of Directors of IREDA, at its meeting held on June 5, 2025, announced details pertaining to the QIP or qualified institutional placement. The QIP dates - The Board of IREDA authorized the opening of the proposed Issue today, i.e., on June 5, 2025, to eligible qualified institutional buyers; Floor Price of the QIP- The approved the floor price for the Issue stands at ₹ 173.83 per Equity Share. The floor price was around 1.5% lower than the previous days closing levels of ₹ 176.50 for IREDA share price on the BSE. IREDA QIP discount: The company may offer a discount of up to 5% on the floor price as per the approval received from the shareholder approval. Issue Price: IREDA said that the Issue price will be determined by the Company in consultation with the book running lead managers appointed for the Issue. In the same context, the company has announced that the trading window shall remain closed for the purpose of the QIP Issue till further intimation- IREDA share price Movement - In December 2023, IREDA share price had been listed on the stocks exchange and the share price has given Multibagger returns to investors, rising by about 7 times compared to the IPO offer price of ₹ 32. While IREDA share price had risen to highs of ₹ 310 e in July 2024, it had corrected to ₹ 137 in MArch 2025. However the IREDA share price has rebounded well thereafter
&w=3840&q=100)

Business Standard
11 hours ago
- Business Standard
Ashoka Buildcon share jumps 5% on securing this deal; key details here
Ashoka Buildcon share price: Ashoka Buildcon share price was buzzing in trade in an overall subdued market, with the scrip rising up to 5.39 per cent to an intraday high of ₹230.70 per share, on Friday, June 6, 2025. At 9:27 AM, Ashoka Buildcon share was trading 3.13 per cent higher at ₹225.75 per share. In comparison, BSE Sensex was trading flat with a negative bias at 81,373.16 levels. Why did Ashoka Buildcon share price rise today? Ashoka Buildcon share price rose after the company announced that it, along with its subsidiary, has bagged letter of intent (LoI) worth ₹1,387.2 crore from the Motor Vehicles Department, Maharashtra In an exchange filing, the company said, 'Ashoka Buildcon informs that the Company and Ashoka Purestudy Technologies Private Limited (APTPL), a subsidiary of the Company, had jointly submitted bids for various projects to the Motors Vehicles Department, Maharashtra. This is to inform that Company has received Letters of Intent (LOIs) for the Circles including Nagpur; Mumbai; Pune; Marathwada; and Konkan and Western Maharashtra.' According to the order details, Ashoka Buildcon and its subsidiary have been entrusted with a comprehensive, long-term project to boost traffic management infrastructure across multiple regions in Maharashtra. As part of the contract, they will be responsible for the design, implementation, integration, operation, and maintenance of an Intelligent Traffic Management System (ITMS) across various road stretches in the Nagpur Circle for a period of 10 years. In addition to these urban regions, Ashoka Buildcon will design, implement, operate, and maintain ITMS on various blackspots and vulnerable locations in the Konkan and Western Maharashtra Circle for 10 years. A parallel scope of work will be undertaken for blackspots and critical points in the Marathwada Circle, ensuring improved road safety and traffic regulation over the same 10-year period. The project implementation period is 15 months from the date of signing of the contract and Operation & maintenance period is 10 years from the Go Live date, the company highlighted. About Ashoka Buildcon Ashoka Buildcon Limited, a Fortune India 500 company, is one of the foremost highway developers in the country, known for its strong presence in the infrastructure and construction space. Since its inception in 1976, the company has grown into a diversified and integrated player, operating across EPC (Engineering, Procurement, and Construction), BOT (Build, Operate, Transfer), and HAM (Hybrid Annuity Model) segments. The company's core business spans Highways & Bridges, Power (EPC), Railway Projects, Buildings (EPC), City Gas Distribution, and Smart Infrastructure. Ashoka Buildcon is also engaged in the production and sale of Ready Mix Concrete (RMC). With a portfolio of 41 PPP projects either completed or under execution, it has established a major footprint across more than 20 Indian states, positioning itself as a key contributor to India's infrastructure growth.