logo
AFRICA OIL ANNOUNCES SHARE CAPITAL

AFRICA OIL ANNOUNCES SHARE CAPITAL

Cision Canada30-04-2025

VANCOUVER, BC, April 30, 2025 /CNW/ - (TSX: AOI) (Nasdaq-Stockholm: AOI) – Africa Oil Corp. ("Africa Oil", "AOC" or the "Company") reports the following share capital and voting rights update in accordance with the Swedish Financial Instruments Trading Act. View PDF version
View PDF
As a result of the issuance of 762,907 common shares due to a residual settlement of performance share units, triggered by the completion of the amalgamation to consolidate all of the Prime Oil & Gas Coöperatief U.A shareholding in Africa Oil, the Company has 675,436,334 common shares issued and outstanding with voting rights as at April 30, 2025.
About Africa Oil
Africa Oil is a full-cycle Independent upstream oil and gas company with interests offshore Nigeria, Namibia, South Africa and Equatorial Guinea. Its main assets are producing and development assets in deepwater Nigeria operated by Majors. The Company holds a leading position in the Orange Basin including its effective interest in the Venus light oil project, offshore Namibia, and its direct interest in Block 3B/4B, offshore South Africa. The Company is listed on the Toronto Stock Exchange and on Nasdaq Stockholm under the symbol "AOI".
Additional Information
This information is information that Africa Oil is obliged to make public pursuant to the Swedish Financial Instruments Trading Act. The information was submitted for publication, through the agency of the contact persons set out above, at 5:00 p.m. EDT on April 30, 2025.
SOURCE Africa Oil Corp.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

NiCAN Updates Exploration Plans for its Pipy South Project in Thompson, Manitoba
NiCAN Updates Exploration Plans for its Pipy South Project in Thompson, Manitoba

Cision Canada

time19 minutes ago

  • Cision Canada

NiCAN Updates Exploration Plans for its Pipy South Project in Thompson, Manitoba

TORONTO, June 12, 2025 /CNW/ - NiCAN Limited ("NiCAN" or the "Company") (TSXV: NICN) (OTCQB: NILTF) (FRA: W8Y) is pleased to provide an update on its exploration activities and plans at the Pipy South Project in Thompson Manitoba. Pipy South, which is identified in NiCAN's Exploration Agreement with Nisichawayasihk Cree Nation ("NCN"), is fully permitted for a Phase I Exploration Program, including diamond drilling and various modern geophysical surveys to test the nickel mineralization potential. Brad Humphrey, President and CEO of NiCAN, commented, "Our hearts go out to all those impacted by the ongoing wildfire situation in Manitoba. The safety and well-being of our employees, contractors, their families, our First Nation partners, and surrounding communities remain our highest priority." The upcoming exploration program will initially focus on two priority target areas where historical drilling, conducted by INCO Limited ("INCO"), intersected intervals of massive to disseminated nickel sulphides within the target Pipe Formation that hosts the nearby Thompson Nickel Deposit. Brad Humphrey continued "We are excited to begin exploring the highly prospective Pipy South Project in the Thompson region of Manitoba. This will be the first time drilling has been conducted on this portion of the Pipe Formation in the last 50 years." "The project has excellent access, with paved roads and trails crossing the property. Our exploration team has been on site locating historical drill casings for potential downhole surveys to assist in initial drill hole targeting. Once this work is completed, the Company intends to start the first diamond drill program on the property in several decades. Pipy South is particularly exciting as historical drill logs indicate the presence of nickel mineralization associated with the Pipe Formation, which hosts all the economic nickel mineralization within the Tier 1 Thompson Nickel Belt." Pipy Project Overview The Pipy Properties consist of three project areas: Pipy South, North and West, totaling 39.1 km 2 in the Thompson Nickel Camp (Figure 1). Initial exploration activities will focus on the Pipy South Project, which is adjacent to the Mystery Lake South deposit, located approximately 12 km northeast of the city of Thompson and Vale's Thompson Nickel Mine, with excellent road access and local infrastructure. Phase I Exploration Program The initial drill program will focus on fold closures at the north end of a folded host sequence (synclinorium) that geologically defines the majority of the Pipy South claims (Figure 2). Drilling by INCO in 1969 reported 8.2 metres of disseminated sulphides within which several zones were noted to contain nickel sulphides. A second INCO hole drilled 300 metres to the north intersected 30 metres of an ultramafic unit and bottomed in pegmatite without testing the lower edge of the ultramafic target. Neither of these historical holes left casing in the ground and consequently are not available for subsequent downhole electromagnetic surveys. The publicly available drill logs for the INCO holes do not contain any assay data. NiCAN plans to confirm the presence of the nickel sulphides and drill test favourable structural targets (fold closures) that are known to be excellent areas for sulphide accumulation within the Thompson camp. The second target area is focused on the eastern limb of the Pipy South fold (synclinorium) (Figure 2). In 1967, INCO reported 4.39 metres of "mineral zone breccia" in one hole and 1.3 metres of "mineral breccia" in a second hole. The holes are 800 metres apart and on strike and within the favourable Pipe Formation stratigraphy that trends north northeast. The INCO drill logs are summaries only and no assays are listed. NiCAN plans several holes to confirm the presence of the mineralized zones intersected by INCO and to test for extensions along strike and in within the target fold closures. NiCAN has also identified 21 historical INCO drill holes on the Pipy South Property that are potential candidates for downhole Electromagnetic ("EM") surveying. The holes are in areas where historical drilling successfully intersected nickel sulphides in addition to those dispersed across the claim group which may enable the exploration team to cost effectively screen a significant portion of the property for near hole nickel bearing bodies. The depths of the holes average approximately 350 metres with the deepest being more than 800 metres in length. NiCAN plans to locate as many of the historical drill holes as possible. Downhole EM technology did not exist in the 1960s when INCO initially drilled this area. A modern downhole EM survey can successfully screen and/or detect significant conductive sulphide bodies up to a 200 metre radius around a drill hole and can help search for potential mineralized bodies missed by the historical drilling. Additionally, the downhole EM data could potentially collect critical information at depths well below the penetration depth of historical airborne EM surveys. This geophysical information will be used to further refine the planned Phase I diamond drill program and define new targets. The Pipy South Project is underlain by an 8 km long folded (synclinal) structure exposing Ospwagan Group sediments including the favourable Pipe Formation that hosts the nickel deposits in the Thompson Nickel Belt. A high-resolution Unmanned Aerial Vehicle ("UAV") magnetic survey completed by NiCAN in 2022 was instrumental in reinterpreting the geology and resulted in a new structural model based on the three-dimensional inverted data. The data indicates that the syncline is significantly more structurally complicated than was historically believed and is comprised of two synclines on the east and west edges with an anticline in the middle. More importantly, the parasitic fold closures are in an ideal location to concentrate massive sulphides (Figure 3 and Figure 4). Pipy South is located on the lower limb of a refolded structure (nappe), which hosts the Thompson T1 and T3 deposits further to the west. The historical Birchtree and Pipe nickel mines (150Mt at 2.32% Ni) are on strike with Pipy South, on the same folded lower limb of the structure (nappe). Qualified Person Mr. Stanley Clemmer, a consultant to NiCAN, who is a qualified person under National Instrument 43-101 – Standards of Disclosure of Mineral Projects ("NI 43-101") has reviewed and approved the scientific and technical information in this press release. About NiCAN NiCAN Limited is a mineral exploration company, trading under the symbol "NICN" on the TSX-V. The Company is actively exploring two nickel projects, both located in well-established mining jurisdictions in Manitoba, Canada. Cautionary Note Regarding Forward-Looking Statements The information contained herein contains certain "forward-looking information" under applicable securities laws concerning the proposed financing, business, operations and financial performance and condition of NiCAN Limited. Forward-looking information includes, but is not limited to, the size and timing of the drill program, results of the drill program, interpretations of the various surveys, NiCAN's ability to identify mineralization similar to that found in prior drill holes, the benefits and the potential of the properties of the Company; future commodity prices (including in relation to NiEq calculations); drilling and other exploration potential; costs; and permitting. Forward-looking information may be characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Many of these assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking information includes changes in market conditions, fluctuating metal prices and currency exchange rates, the possibility of project cost overruns or unanticipated costs and expenses and permitting disputes and/or delays. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking information. SOURCE Nican Ltd.

IsoEnergy Commences Athabasca Basin Summer 2025 Exploration Program
IsoEnergy Commences Athabasca Basin Summer 2025 Exploration Program

Cision Canada

time36 minutes ago

  • Cision Canada

IsoEnergy Commences Athabasca Basin Summer 2025 Exploration Program

TORONTO, June 12, 2025 /CNW/ - IsoEnergy Ltd. ("IsoEnergy" or the "Company") (NYSE: ISOU) (TSX: ISO) is pleased to announce the commencement of its summer exploration program across its eastern Athabasca Basin uranium properties. The program is expected to encompass a total of 24 diamond drill holes for 11,000 metres of drilling on the Larocque East and Hawk projects, following up on encouraging results from the winter 2025 program at Larocque East and winter 2024 program at Hawk. Geochemical results from the winter program at Larocque East remain pending and are planned to be released once available. Highlights Larocque East Project (Figure 1) A total of 20 diamond drill holes totaling 7,600 metres are planned to follow-up up on encouraging results from the winter 2025 program, targeting both resource expansion and regional discovery. Hurricane Resource Expansion – Drilling will continue to test the potential of the Hurricane Main and South trends, focusing on step-outs near the existing deposit (the " Deposit") (Figure 1). Greenfield Targets Along the Larocque Trend – Drilling will test Target Area D, 2.8 kilometres east of the Deposit, where the Company intersected the strongest radioactivity to date outside of the main mineral resource area. Additional drilling is planned at Target E, where summer 2024 drilling intersected elevated radioactivity and hydrothermal alteration near the unconformity and, Target F. Target K, located approximately 800 metres north of the main Hurricane conductor, identified in a new geophysical interpretation will also be drill tested along the 2,500 metre trend. Hawk Project 4 diamond drill holes totaling 3,400 metres are planned to target coincident electromagnetic conductors and Ambient Noise Tomography (" ANT") velocity anomalies along a sparsely drill-tested, 12-kilometre-long prospective corridor. Previous drilling intersected structural disruption, alteration, and elevated uranium geochemistry and radiometric responses, features consistent with a setting conducive to unconformity-style uranium mineralization (Figure 3). Saskatchewan Forest Fire Situation Mobilization for the drill program has been impacted due to severe forest fire activity in Northern Saskatchewan. The program is initially operating with one drill based out of Points North. Once conditions improve, specifically when the fires near La Ronge and along Highway 102 subside and safe transport routes are restored, the Larocque East camp is expected to be opened, and a second drill is planned to be deployed to accelerate the program. Advancing Exploration Pipeline Across the Eastern Athabasca Basin Additional work is planned this summer to advance a pipeline of exploration targets across the Company's earlier-stage projects. This includes a recently completed helicopter-borne MobileMT survey at the East Rim project, acquisition and processing of satellite hyperspectral data for the Bulyea River project, and potential prospecting, sampling, and mapping at the Bulyea River, East Rim and Evergreen projects (Figure 4). Dan Brisbin, Vice President Exploration, commented, "Our summer 2024 and winter 2025 drilling returned encouraging results at both Hurricane and along the Larocque trend, with strong radioactivity having been intersected. As we await geochemistry results for recent drilling, we are excited to pick up where we left off and continue advancing the potential for resource expansion along the main and south trends and additional discoveries along the 6-kilometre segment of the Hurricane trend to the east, particularly in target areas D and E. We are also eager to test, for the first time, the 2,500-metre trend located 800 metres north of the main conductor, an area that shares key geophysical characteristics with the Deposit. Lastly, we look forward to returning to the relatively underexplored Hawk project, where planned ground electromagnetic (" EM") and ANT surveys will guide drilling later this summer." Resource Expansion Drilling at Hurricane Following the success of the 2025 winter drill program (see news release dated April 23, 2025), exploration drilling has been proposed to further test several target areas (Figure 2). The Hurricane Main trend, where winter drill holes LE25-194 and 198 intersected strong radioactivity. LE25-194, located 80 metres east of Hurricane, returned an average RS-125 spectrometer (" RS-125") reading on core of 3,100 counts per second (" cps") over 0.5 metres with a corresponding downhole probe maximum reading of 30,829 cps. LE25-198 intersected up to 625 cps on core and 26,503 cps downhole probe 180 metres east of Hurricane. The Hurricane South trend, where winter drill holes LE25-207 and LE25-210 intersected strong radioactivity. Hole LE25-207, located 240 m east of Hurricane, returned an average RS-125 reading on over 0.5 metres on core of 8,800 cps and a corresponding downhole probe maximum reading of 30,096 cps, while LE25-210, drilled 480 metres east of Hurricane, intersected up to 3,700 cps averaged over 0.5 m on core and a corresponding downhole probe maximum reading of 20,280 cps. Regional Targets on the Larocque Trend Target Area D, 2.8 kilometres east of Hurricane, where winter drill hole LE25-202 intersected an average RS-125 reading on over 0.5 metres on core of 6,200 cps and up to 28,782 cps downhole probe within that interval – the highest radioactivity intersected on the project to date outside of the immediate Hurricane area. The LE25-202 intersection is on the western margin Target Area D at edge of an ANT seismic velocity anomaly where a new geophysical model generated earlier this year by Computational Geosciences Inc. and Convolutions Geoscience shows a potential splay in the Hurricane trend EM conductor package. Target Area E is centred on a 1 kilometre by 2 kilometre ANT anomaly located 8 kilometre east of Hurricane at the eastern edge of the property where the 2025 conductivity model suggests an east-closing fold of the Hurricane host graphitic-pyritic pelite basement gneisses have been breached by east-northeast striking faults. Drill hole LE24-192, drilled in 2024, intersected 2.0 metres at 495 ppm U-p straddling the unconformity including 0.5 metres at 1,110 ppm U-p immediately below the unconformity. Drill hole LE24-180 returned 462 ppm U-p over 0.5 m. Unconformity depth in that hole was only 175 metres compared to 325 metres at the Hurricane deposit. Target Area F, located in the northeast, is centered on the conductor corridor and aligns with roughly coincident resistivity and ANT velocity anomalies. Disruption of these geophysical patterns at the east end of Target Area F is inferred to reflect prospective structural complexity. The new geophysical model generated earlier this year by Computational Geosciences Inc. and Convolutions Geoscience from joint inversion of historic EM and resistivity survey data highlighted a previously unexplored 2,500 metres long conductive trend 800 metres north of the main Hurricane conductor trend. This is interpreted as the eastern extension of the Hurricane conductor trend northern splay that originates near drill hole LE25-202. This target, referred to herein as Target Area K, exhibits two geophysical features like those at Hurricane: a flexure from a northeast trend to and east trend, and a conductivity decrease on the southwest end potentially due to the effects of alteration on the conductive host rocks. The drilling program will be results driven, with drilling being reallocated among these target areas in response to mineralized intercepts. Drilling planned to begin at the Hawk project in August may also be reallocated to the Larocque East project if results warrant. Hawk Project Winter 2024 drill holes at the Hawk project intersected structure, alteration, and broad zones of elevated radioactivity typical of unconformity-related uranium deposits (see news release dated April 25, 2024). These holes were drilled to test EM conductors along a regional high conductivity trend mapped by Z-Axis Tipper Electromagnetic (" ZTEM") surveys and within a prominent ANT seismic velocity low interpreted to be due to structural disruption and alteration. The holes were drilled along trend to the north of 2023 drill holes HK23-03 and HK23-05A (Figure 3) that intersected structural disruption, desilicification, clay alteration, and "grey" zone sulphide mineralization with anomalous radioactivity and U-p geochemistry at the unconformity. Drill hole HK23-05A returned 168 ppm U-p over 2.0 metres in the basal sandstone including 511 ppm U-p over 0.5 metres immediately above the unconformity. HK23-08, which intersected the unconformity about 90 metres to the east, intersected 27 ppm U-p over 5.0 metres in the basal sandstone, including 99 ppm U-p over 0.5 m. Exploration work planned for summer 2025 includes: Stepwise moving loop EM surveying to more accurately locate conductors than the existing fixed loop EM surveys do. It is anticipated that this will improve drill hole targeting. ANT surveys over the northern portion of the project to test for the extension of the existing ANT velocity anomaly along the conductivity corridor in an area where there is 35 metres of unconformity elevation change between 2023 drill holes HK23-01 and HK23-02. Drill up to 3,400 metres in four holes to test targets along the Hawk conductivity corridor that will be finalized upon completion of the ground geophysical surveys. Developing Drill Targets on Additional Highly Ranked Projects Additional work is being planned for the summer of 2025 to develop a pipeline of exploration targets on the Company's earlier stage projects. An airborne MobileMT conductivity and magnetic survey was recently completed over the East Rim project. Data processing and interpretation are in progress. Acquisition of satellite hyperspectral survey data for the Bulyea River project is planned for June. This data will be used for remote mineral mapping to help guide initial geological mapping, prospecting and sampling planned for late summer to follow up on historic highly anomalous uranium lake sediment geochemistry and radiometric anomalies detected by both historic and 2024 surveys completed for IsoEnergy by RAMP Geological Services Inc. Qualified Person Statement The scientific and technical information contained in this news release was reviewed and approved by Dr. Dan Brisbin, IsoEnergy's Vice President, Exploration, who is a "Qualified Person" (as defined in NI 43-101 – Standards of Disclosure for Mineral Projects). See the press releases referred to above for additional information, including data verification and quality assurance/quality control procedures, as well as the complete exploration results from the previous programs disclosed herein. For additional information regarding the Company's Larocque East Project, including the current mineral resource estimate for IsoEnergy's Hurricane Deposit, please see the technical report entitled "Technical Report on the Larocque East Project, Northern Saskatchewan, Canada" dated August 4, 2022, available on the Company's profile at About IsoEnergy Ltd. IsoEnergy (NYSE American: ISOU andTSX: ISO) is a leading, globally diversified uranium company with substantial current and historical mineral resources in top uranium mining jurisdictions of Canada, the U.S. and Australia at varying stages of development, providing near-, medium- and long-term leverage to rising uranium prices. IsoEnergy is currently advancing its Larocque East project in Canada's Athabasca basin, which is home to the Hurricane deposit, boasting the world's highest-grade indicated uranium mineral resource. IsoEnergy also holds a portfolio of permitted past-producing, conventional uranium and vanadium mines in Utah with a toll milling arrangement in place with Energy Fuels. These mines are currently on standby, ready for rapid restart as market conditions permit, positioning IsoEnergy as a near-term uranium producer. Cautionary Statement Regarding Forward-Looking Information This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of U.S. securities laws (collectively, "forward-looking statements"). Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". These forward-looking statements may relate to the Company's properties, planned exploration activities for summer 2025 and the anticipated results thereof; and any other activities, events or developments that the Company expects or anticipates will or may occur in the future. Forward-looking statements are necessarily based upon a number of assumptions that, while considered reasonable by management at the time, are inherently subject to business, market and economic risks, uncertainties and contingencies that may cause actual results, performance or achievements to be materially different from those expressed or implied by forward-looking statements. Such assumptions include, but are not limited to, assumptions that the results of planned exploration activities are as anticipated and will be reported when anticipated; the anticipated mineralization of IsoEnergy's projects being consistent with expectations; the price of uranium; the anticipated cost of planned exploration activities; that general business and economic conditions will not change in a materially adverse manner; that financing will be available if and when needed and on reasonable terms; and that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company's planned activities will be available on reasonable terms and in a timely manner. Although IsoEnergy has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Such statements represent the current views of IsoEnergy with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by IsoEnergy, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Risks and uncertainties include, but are not limited to the following: negative operating cash flow and dependence on third party financing; uncertainty of additional financing; no known mineral reserves; aboriginal title and consultation issues; reliance on key management and other personnel; actual results of technical work programs and technical and economic assessments being different than anticipated; changes in development and production plans based upon results; availability of third party contractors; availability of equipment and supplies; failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena; other environmental risks; changes in laws and regulations; regulatory determinations and delays; stock market conditions generally; demand, supply and pricing for uranium; other risks associated with the mineral exploration industry; and general economic and political conditions in Canada, the United States and other jurisdictions where the Company conducts business. Other factors which could materially affect such forward-looking statements are described in the risk factors in IsoEnergy's most recent annual management's discussion and analysis and annual information form and IsoEnergy's other filings with securities regulators which are available under the Company's profile on SEDAR+ at and on EDGAR at

LUCA ANNOUNCES LEADERSHIP GROWTH AND BOARD TRANSITION
LUCA ANNOUNCES LEADERSHIP GROWTH AND BOARD TRANSITION

Cision Canada

time37 minutes ago

  • Cision Canada

LUCA ANNOUNCES LEADERSHIP GROWTH AND BOARD TRANSITION

VANCOUVER, BC, June 12, 2025 /CNW/ - Luca Mining Corp. ("Luca" or the "Company") (TSXV: LUCA) (OTCQX: LUCMF) (Frankfurt: Z68) is pleased to report that Mr. Ramon Mendoza, currently Luca's interim Chief Operating Officer will assume the position of permanent COO effective as of June 01, 2025. Mr. Mendoza will also continue to be the Company's Chief Technical Officer. Mr. Mendoza has over 35 years of senior experience in the mining industry, with expertise in mine development, process optimization, and a highly successful track record of managing both underground and open-pit operations. He has played a pivotal role in the successful transformation of Luca's operations at the Campo Morado and Tahuehueto mines in Mexico into consistent producers of gold, silver and base metals with significant growth potential. Prior to joining Luca, Mr. Mendoza worked as a mining consultant and spent many years at First Majestic Silver Corp., where he was a member of the senior leadership team, focusing on strategic management and project execution. The Company also announces that Mr. David Rhodes will be stepping down as Chairman effective as of June 10, 2025 but will remain a valued member of Luca's Board of Directors. Well known in the financial industry, including as the Managing Director of Endeavour Financial, Mr. Rhodes' guidance and expertise will continue to be of great benefit to the Company. Mr. Peter Damouni will step into the role of Chairman of the Board. He brings over 20 years of global corporate and investment banking experience with a focus on the natural resources sector. Mr Damouni has served as an executive and director of several public companies listed on the TSX, TSXV, and LSE. Throughout his career, he has played a key role in developing and executing corporate strategies, including equity and debt financings, restructurings, joint ventures, acquisitions and sale processes. Mr. Damouni has been a Director of Luca since 2024 and has demonstrated outstanding leadership to the Company, fostering a shared sense of purpose, initiative and positivity. Mr. Dan Barnholden, CEO, commented, " I believe that Luca has a team that is second to none. Ramon Mendoza and Peter Damouni are highly effective, strong leaders who are focused on growing Luca in a safe, sustainable way. Peter is very much welcomed as Chair as we continue to build and execute our corporate strategies. He is an excellent team-builder and his guidance will be critical as our growth accelerates. I would like to thank David Rhodes for his support and expertise during his time as Luca's Chair. Luca is fortunate that David will remain as a Director. Ramon has excelled on the operational front since joining Luca and will build upon this success in his new position as COO. He is a role model to the teams in Mexico and under his leadership Luca's two mines have consistently performed well. His expertise has facilitated successful optimizations at the Company's operations leading to increased production, cash flow and market performance." About Luca Mining Corp. Luca Mining Corp. (TSX-V: LUCA, OTCQX: LUCMF, Frankfurt: Z68) is a Canadian mining company with two wholly owned mines located in the prolific Sierra Madre mineralized belt in Mexico. These mines produce gold, copper, zinc, silver, and lead and generate strong cash flow. Both mines have considerable development and resource upside as well as significant exploration potential. The Company's Campo Morado Mine hosts VMS-style, polymetallic mineralization within a large land package comprising 121 sq km. It is an underground operation, producing gold, silver, copper, zinc, and lead. The mine is located in Guerrero State. The Tahuehueto Mine is a large property of over 75 sq km in Durango State. The project hosts epithermal gold and silver vein-style mineralization. Tahuehueto is a newly constructed underground mining operation producing primarily gold and silver. The Company has successfully commissioned its mill and is now in commercial production. For more information, please visit: On Behalf of the Board of Directors (signed) "Dan Barnholden" Dan Barnholden, CEO Cautionary Note Regarding Production Decisions and Forward-Looking Statements Statements contained in this news release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, estimated production guidelines for 2025 and other possible events, conditions or performance that are based on assumptions about the proposed exploration program and its anticipated results; the timing and costs of future activities on the Company's properties, such as production rates and increases and sustaining capital expenditures; success of exploration, development, and metres to be drilled in exploration on the Tahuehueto Mine site and the Campo Morado Mine site. In certain cases, Forward-Looking Information can be identified using words and phrases such as "plans"," expects", "scheduled", "estimates", "forecasts", "intends", "anticipates" or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the Company will be able to raise additional capital as necessary; the current exploration, development, environmental and other objectives concerning the Tahuehueto Mine can be achieved; that consistent and sustainable mill feed at Campo Morado Mine will be achieved; the continuity of the price of gold and other metals and economic and political conditions. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. SOURCE Luca Mining Corp.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store