
694 flushes per minute end up at Mitchell's new $15.3M north wastewater facility
Feb. 7—MITCHELL — Safety, technology and cleanliness are staples of Mitchell's new $15.3 million north wastewater treatment plant.
The wastewater treatment plant opened in March 2024, and provides safe disposal of Mitchell's flushed items. The plant's automated software enables city workers to remotely monitor systems and the new screening hardware replaces the need for workers to manually remove human waste products.
"When you flush, it all comes here," said Jon Vermeulen, Mitchell's utility superintendent for water, sewer and stormwater.
The wastewater plant has a design peak of 5.8 million gallons. The average flow is 1.6 million per day, which is 66,666 gallons per hour or 1,111 gallons per minute.
The average shower in America is 8 minutes and uses 16 gallons of water. The average toilet flush uses 1.6 gallons. In other words, in one minute in Mitchell, there's 694 toilet flushes, or for every eight-minute block of time, there's 555 showers.
Previously, the solid waste removal process would allow sediment and small pieces of waste to leave the facility and travel along with the wastewater to a holding basin, where the sediment would gather.
"The new system is 40% more efficient," said Terry Johnson, Mitchell's engineering project supervisor.
The old way of cleaning required workers to wear masks with oxygen tanks and wade into a large holding basin to clear out the solids with a high-powered vacuum. The new system eliminates this duty.
"They're standing in a couple of feet of sewage. Most people would not do that," Vermeulen said.
The city funded the project with a $15.3 million loan from the South Dakota Clean Water State Revolving Loan Fund (SRF) program.
"We ended up saving about $700,000 on this project," said Vermeulen, who has been with the utilities department for 31 years.
The city's utilities department is an enterprise fund, which means it acts as a business and collects revenue. Collections and loans are used to pay for pipes and upgrades to facilities.
Each resident's water bill has a sewer charge, which is a base fee of $30.66 per 750 gallons used and $4.22 per volume as of Oct. 1, 2024.
The City Council recently voted to increase the rates for water and sewer services.
The sewer charge has $26.22 built into it to cover various capital improvement projects, such as the waste water treatment plant, the Dailey Drive lift station in 2022, and the Sanborn Boulevard project in 2020, which all required SRF loans to complete.
"Our base fee is how we pay for our projects. The more SRF projects you have, the higher the base fee. So that kind of tells you what you're spending money on for sewer," Vermeulen said.
The city has two wastewater facility locations. The north wastewater plant off East Havens Avenue, which originally had a November 2023 completion date, separates solid organic waste from wastewater. The
$32 million south wastewater treatment plant
, which is by Mitchell's Regional Landfill and was also funded through an SRF loan, has a fall 2026 completion date. The new facility will dehydrate any leftover sludge and send it to the landfill, which will finish the process of making the organic material in the wastewater safe for release.
The team of 12 utility department workers who keep all of Mitchell's various lift stations, sewer lines, and storm drains flowing will have an easier time maintaining the new wastewater plant than the previous one. Automated technology and safety alerts play a big part in daily operations.
The utility department uses Mitchell-based Dakota Pump's software platform that controls the hardware of the valves, monitors water flow, and alerts workers when a system is down or needs maintenance. From a dashboard, a digital display of each lift pump station and how much water is flowing can be seen, as well as how much water is flowing through the facility at any given time.
The plant sees high consumption times, with mid-day as the slowest for city-wide water usage. Morning has a peak and then slows by 11 a.m., and then picks up again between 7 p.m. to 11 p.m. Peak times see a 30% increase in usage, according to Vermeulen.
Green or red lights outside of doorways indicate the safety of the air inside the building. A green light means the air is safe, a red light means that personnel should not enter. Additionally, alarms sound inside the building if the air quality becomes life-threatening.
This usually occurs when a hauled waste contractor empties a septic tank on site, which releases toxic air.
"You get out of the building, and usually within 5 to 10 minutes, the air has turned itself over and it's safe to enter," Vermeulen said.
Cranes and hatchways in floors allow for heavy pumps, pipes and the like to be maintained and replaced. There is a redundancy of lift pumps, generators, and waste disposal systems so that one machine can be under maintenance while the other is able to keep the city running.
Fourteen lift stations pump sanitation waste through the city until it arrives at the lowest point in Mitchell, the new wastewater treatment plant. Here, it goes through an enormous roto-screener to remove anything larger than an eighth of an inch. The city discourages the flushing of toys, feminine care products and adult wipes, even ones labeled flushable, because they do not break down in the same way as organic items.
Solids are dumped onto a conveyor belt headed to an open-top trailer.
Smaller items, such as human waste and toilet paper, are gravity fed to channels underneath the plant that lead to a cone, which slowly separates the water out until only a grit remains and can then be sent back up to above ground level. The grit classifier, which is fed by conveyor belt, sifts silt, small particles and undigested corn and then deposits into the same trailer.
Every Monday morning, the trailer is emptied of about 1 to 2.5 tons of solid waste at the Mitchell regional landfill. During the summer, when tourists visit the Corn Palace or stay in hotels, there is an increase in the amount of solid waste that is deposited at the landfill, according to Vermeulen.
Wastewater, with some sediment, then travels to an aeration basin to remove ammonia. Afterward, it is pumped 2 miles to the south wastewater treatment facility, currently under construction, to undergo additional mixing and breakdown before being emptied into the city lagoons. The aeration process allows for greater oxygen coverage so that microbes, which require oxygen to live, can eat the organic waste.
There are five city lagoons, at various depths, covering a 240-acre area holding about 700 million gallons of water.
Three farmers have long-term contracts with the city of Mitchell to channel nutrient-rich lagoon water through nine pivots to irrigate their farms.
Lagoon water is transferred from one lagoon to the next, with a focus on moving top water with the least amount of sediment. In the spring and the fall, the lagoons are emptied into the James River by permit from the South Dakota Department of Agriculture and Natural Resources.
"The guys out there are working hard. They don't complain about it being cold. I feel really blessed to work with them and I'm glad I'm given the opportunity," Vermeulen said.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

Yahoo
an hour ago
- Yahoo
Saco voters approve $80.4 million municipal and school budget
Jun. 10—Saco voters approved the proposed $80.4 million combined municipal and school budget during the June 10 municipal election. The vote was 708 in favor and 209 opposed. The Saco City Council adopted the municipal and school budget during a meeting on May 12. The budget represents an increase of $6.8 million, or 9.2%, over the current budget. The tax rate is expected to increase to $14.20 per $1,000 of property value, a 15-cent or 1.1% jump. This means that the annual tax increase for a median single-family residential home valued at $420,000 is $63. The 15-cent increase is below the rate of inflation and 55 cents lower than the $14.75 property tax rate set in the 2024 fiscal year, according to a release from the city of Saco. "We are required to adopt a balanced budget," City Administrator John Bohenko said at a meeting. The primary cost driver of the new budget is costs associated with salaries and benefits to employees, accounting for 72% of the budget. These increases include adjustments to bring union wages in line with market value, cost of living adjustments for non-union jobs, four new positions, and anticipated increases in benefits costs, such as health insurance premiums. Increases also include funding for a seacoast resilience project, a Ferry Road culvert replacement, and funding for the Dyer Library and Saco Museum. Copy the Story Link
Yahoo
an hour ago
- Yahoo
San Diego City Council approves 2026 fiscal year budget
SAN DIEGO (FOX 5/KUSI) — The highly scrutinized San Diego city budget for the 2026 fiscal year has finally been passed. After facing more than a quarter of a billion-dollar shortfall, city council voted to approve an amended budget, all while saving some of the key programs and services Mayor Todd Gloria chose to cut. There has been passion and heated opinions from the public for months, including on decision day Tuesday when city council was set to approve an amended budget. 'Investing in them tell San Diegans they matter. Mayor Gloria's budget tells San Diegans that only some of them matter. It cuts funding for libraries, parks and rec centers, youth programs, the arts, equity offices and climate justice initiatives,' said Noah Yee Yick, researcher and policy advocate at the Center on Policy Initiatives. Councilmembers presented amendments to Gloria's final budget, saving several items on the chopping block that drew heavy criticism from the community. Fire pits have been saved due to county funding. Monday hours will be available at more than a dozen libraries and all rec centers hours will be restored. In addition, the Office of Race and Equity and $450,000 in funding for arts, culture and community festivals nonprofits grants will be restored. Access will not be lost to Lake Murray and Lake Miramar and public restrooms near the beaches and Balboa Park will remain open. After Gloria largely blamed the public for not passing the most recent proposed tax increase, the money for these restorations had to come from somewhere. That includes cutting administrative positions totaling $3 million, plans to start charging for parking at Balboa Park and a newly approved monthly trash fee, which is expected to generate $80 million annually. 'With that behind us and those revenues that we can count on for the next year, it is allowing us to do the extraordinary changes that our residents, our constituents, our neighborhoods, need and demand and deserve,' said Council President Joe LaCava. Even with the budget passing with a majority 7 to 2 vote, the city's independent budget analyst acknowledges how narrow the margin is for any error. 'If we do hit an economic downturn, even if all of these good things, these new revenues come to fruition, we will be faced with the need for immediate cuts,' Charles Modica said. The budget goes into effect on July 1. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Yahoo
2 hours ago
- Yahoo
Othello park rental fee revision sparks heated discussion
Jun. 10—OTHELLO — Park rental fees in Othello have been amended after some confusion led to an overcharge of the Othello Chamber of Commerce and a spirited discussion between Othello City Council members and city employees Monday. The confusion involved garbage fees for events sponsored by the Othello Chamber of Commerce, which brought Chamber Manager Jackie Wilhelm to the May 27 council meeting to ask about them. "I discovered that with (the city's solid waste contractor) the city of Othello receives dumpster services at no charge under an existing contract," Wilhelm said. "Despite this, the Chamber was billed $2,814 last year for 12 dumpsters, dumpsters the city had already requested and received for free." Wilhelm said the fees charged for 2025 were going to be higher and asked for an explanation. She talked to the contractor, she said, and was told the garbage containers were provided to the city at no charge, but heard from city officials that the fees were actual expenses. "I feel like when we signed that, I wasn't getting transparency from the city," Wilhelm said. Council members voted to review the fees, and city officials released a letter a few days later saying some incorrect information from the garbage contractor caused a mistake when calculating them. "Once the issue was brought to our attention, we immediately investigated and confirmed the miscommunication. We appreciate the Chamber raising the concern so it could be addressed properly," the letter said. Revised fees were presented for council consideration Monday; the garbage container fees were reduced. Parks and Recreation Coordinator Valerie Hernandez said the contractor did not know the events were sponsored by outside organizations and not the city, which changed the price structure. A fee on smaller garbage containers added for community events drew vehement protest from council member Corey Everett. They are, he said, similar to containers provided to individual residences, and the proposed fee was similar to the monthly charge for individual households. "The city is not getting charged for those (containers)," he said. "Fred down the street is almost paying (that) for monthly service, a little bit over, and we're going to charge that for one (use)." Public Works Director Robin Adolphsen said that while the garbage containers themselves are free, it still takes time for city staff to monitor and dump them. Each venue already has containers, she said, and event organizers are only being charged for any extra garbage cans required. Everett said he thought the city shouldn't charge for the extras at all. "That's something that's given to the city that we're turning around and charging the nonprofits for," he said. Everett said that while the city spends money for city employees to monitor the park, event organizers do pay for at least some employee time. "Regardless, we're charging for something that the city is receiving for free," he said. Council member John Lallas agreed, saying it would be different if the city owned them. Hernandez said the council had the option to change the fee schedule. Lallas said in his opinion, city officials should ask for as much as the city pays, and no more. "If they provide a charge to us, then that's all we charge them for the event. That's all we ask them to pay for," he said. Charging for city labor is a different discussion, Lallas said.