logo
To increase car loading in Railways, Union minister Vaishnaw inaugurates largest automobile in-plant railway siding in Manesar

To increase car loading in Railways, Union minister Vaishnaw inaugurates largest automobile in-plant railway siding in Manesar

Indian Express12 hours ago

In a significant step to increase the transportation of passenger vehicles or cars by Indian Railways, Union Minister for Railways, Information & Broadcasting and Electronics & Information Technology, Ashwini Vaishnaw Tuesday inaugurated the country's largest automobile Gati Shakti Multi-Modal Cargo Terminal (MMCT) at Maruti Suzuki India Ltd facility in Manesar, Haryana.
Haryana Chief Minister Nayab Singh Saini and Maruti Suzuki India's CEO and managing director Hisashi Takeuchi were also present at the inauguration.
Maruti Suzuki is the biggest manufacturer for car loading in Indian Railways. The Manesar in-plant railway siding has a total dispatch capability of 4,50,000 vehicles annually at full capacity. It is company's second in-plant railway siding facility.
Vaishnaw said the Railways undertook major reforms in 2021 to strengthen multi-modal logistics, resulting in the construction of 108 MMCT in a short span of time. 'The terminal in Haryana, where the announcement was made, is spread over 45 acres and has a cargo handling capacity of up to 4.5 lakh cars… Legacy problems accumulated in Railways over the years are now being eliminated one by one. Stations, trains, toilets, tracks, cleanliness, technology — every sector has been improved comprehensively. New facilities are being provided to passengers and integrated development is being given priority in collaboration with the industry,' said Vaishnaw while addressing the gathering.
The Manesar plant is connected to Patli railway station through a 10 km dedicated rail link. It is part of 121.7 km Haryana Orbital Rail Corridor (HORC), which is being developed by the Haryana Rail Infrastructure Development Corp (HRIDC). Officials said that the 10 km railway line was developed at a cost of Rs 800 crore, of which Rs 684 crore was paid by HRIDC and the remaining by Maruti Suzuki. HRIDC is a joint venture of the Government of Haryana (51 per cent) and the Ministry of Railways (49 per cent).
HORC is being developed to decongest the Delhi Railway Network by diverting the railway traffic not meant for Delhi.
'On June 17, the vehicles were dispatched to 17 hubs or railway slidings to cater to 380 cities. The siding at the Maruti Suzuki's Manesar plant comprises four lines and two loading platforms. The biggest benefit of new siding will be the direct loading of the car consignment from the plant. It will end the need for transportation by road to Farukhnagar, Bawal, Palhawas or Gurugram stations. In all, it will reduce a total of. 65,000 truck trips per annum, reducing the congestion on road and saving fossil fuels,' said a senior official at the Ministry of Railways.
The total loading of cars in the Indian Railways has crossed the 1 million target, the official added.
'The Rail Coefficient of India Railways has increased from 1.2 per cent in 2013-14 to 20.6 per cent in 2024-25. It means out of total car production in India, 20.6 per cent is being transported by the railways. In 2024-25, the total car production was 50.61 lakhs and out of this, 10.41 lakhs were transported by railways. It is mostly for domestic sales. Almost 50 per cent of total car loading is done by Maruti Suzuki,' said the official quoted above.
Maruti Suzuki's Manesar facility was inaugurated in February 2007. Apart from this, India's largest car manufacturer has three more plants in Gurugram, Gujarat and Kharkhoda.
'The project (in-plant railway siding) underscores our strong commitment to India's Net Zero emissions target 2070. It will contribute to avoiding 1,75,000 tonne of CO2 emissions, saving 60 million litre of fuel annually at full capacity, and reducing road congestion. Lowering carbon emissions remains a top priority at Maruti Suzuki and we aim to achieve this, by increasing the share of vehicle dispatches through railways to 35 per cent by FY 2030-31,' said Hisashi Takeuchi, MD & CEO, Maruti Suzuki India Ltd.
Dheeraj Mishra is a Principal correspondent with The Indian Express, Business Bureau. He covers India's two key ministries- Ministry of Railways and Ministry of Road Transport & Highways. He frequently uses the Right to Information (RTI) Act for his stories, which have resulted in many impactful reports. ... Read More

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

When Will Oswal Pumps IPO Allotment Be Out? A Step-By-Step Guide To Check Status Online, Latest GMP
When Will Oswal Pumps IPO Allotment Be Out? A Step-By-Step Guide To Check Status Online, Latest GMP

News18

time40 minutes ago

  • News18

When Will Oswal Pumps IPO Allotment Be Out? A Step-By-Step Guide To Check Status Online, Latest GMP

Oswal Pumps IPO GMP: Unlisted shares of Oswal Pumps are trading at Rs 674 apiece in the grey market, which is 9.7% premium over IPO price of Rs 614, signalling mild listing gains. Oswal Pumps IPO Allotment Status: Even as the Oswal Pumps IPO has concluded with a strong 34.42 times subscription, all eyes are on its allotment, which is expected to be finalised today, June 18, in the evening. Once the basis of allotment is finalised, investors will start receiving bank debit messages. They can also check the allotment status on websites of the BSE, the NSE and registrar Link Intime. The Oswal Pumps IPO allotment will take place on today, June 18. The IPO allotment status can be checked online by following these steps: 1) Go to the official BSE website via the URL — 2) Under 'Issue Type', select 'Equity'. 3) Under 'Issue Name', select 'Oswal Pumps Ltd' in the dropbox. 4) Enter your application number, or the Permanent Account Number (PAN). 5) Then, click on the 'I am not a robot' to verify yourself and hit the 'Search' option. Your share application status will appear on your screen. You can also visit directly on the registrar Link Intime's portal — and check the Oswal Pumps IPO allotment status. According to market observers, unlisted shares of Oswal Pumps Ltd are currently trading at Rs 674 apiece in the grey market, which is a 9.77 per cent premium or GMP over the upper IPO price of Rs 614. It indicates listing gains for investors on June 20, the tentative listing date. The GMP is based on market sentiments and keeps changing. 'Grey market premium' indicates investors' readiness to pay more than the issue price. Oswal Pumps IPO Listing Date The shares of Oswal Pumps Ltd will be listed on both BSE and NSE on June 20, 2025. Oswal Pumps IPO: Final Subscription Status, Other Details The IPO is a combination of a fresh issue of shares valued at Rs 890 crore and an offer-for-sale (OFS) of 81 lakh stocks worth Rs 497.34 crore at the upper end of the price band, by promoter Vivek Gupta. This aggregates the issue size at Rs 1,387.34 crore. The initial public offering was open for subscription between June 13 and June 17. The Rs 1,387.34-crore mainboard IPO received a strong 34.42 times subscription, garnering bids for 55,80,42,696 shares as against 1,62,12,980 shares on offer. The retail and NII participation stood at 3.60 times and 36.70 times, respectively. Its qualified institutional buyer (QIB) category got a 88.08 times subscription. The IPO received subdued response on Day 1 and Day 2 with 0.42 times and 1.65 times subscriptions, respectively. However, it received a massive response on the final day of bidding amid higher participation from NIIs (who invest more than Rs 2 lakh) and QIBs (which include mutual funds). The price band was fixed in the range of Rs 584-614 apiece. Most analysts gave 'subscribe for long-term' rating to the IPO. They said Oswal Pumps is one of India's fastest-growing names in solar-powered solutions, and reported a CAGR of 45.1% between FY22 and FY24. The company is expected to grow at a rate of 11% in the next five years. However, the analysts also mentioned some risks, including the company's dependent on its top-10 customers (who account for nearly 80% of revenue from operations), government funding changes or policy changes (as the significant portion of Oswal Pumps' revenue is derived from turnkey solar pumping systems under PM-KUSUM), and the concentration of all of its manufacturing facilities at one place (Karnal, Haryana). The company recorded one of the highest EBITDA margins among peers in FY24 (30.1% in 9MFY25), up from 10.7% in FY22, showcasing clear operating leverage gains. However, competition from established peers and its dependency on tenders for its revenue, remain key risk factors to consider. Oswal Pump's competitors include Kisloskar Brothers, Shakti Pumps, WPIL, and Roto Pumps. Oswal Pumps plans to utilise the IPO proceeds for capital expenditure (Rs 89.86 crore), investment in subsidiary Oswal Solar for new units in Karnal (Rs 272.76 crore), repayment of company borrowings (Rs 280 crore), repayment of Oswal Solar's loans (Rs 31 crore), and towards general corporate purposes. top videos View all IIFL Securities, Axis Capital, CLSA India, JM Financial, and Nuvama Wealth Management are the book-running lead managers to the issue. Oswal Pumps Limited, founded in July 2023, manufactures a wide range of pumps and related products for domestic, agricultural, and industrial use. tags : initial public offering (IPO) IPO Location : New Delhi, India, India First Published: June 18, 2025, 10:55 IST News business » ipo When Will Oswal Pumps IPO Allotment Be Out? A Step-By-Step Guide To Check Status Online, Latest GMP

2025 Maruti Grand Vitara CNG launched: What's new, pricing & mileage
2025 Maruti Grand Vitara CNG launched: What's new, pricing & mileage

Time of India

time42 minutes ago

  • Time of India

2025 Maruti Grand Vitara CNG launched: What's new, pricing & mileage

2025 Maruti Grand Vitara CNG launched. Maruti Suzuki has reintroduced the Grand Vitara CNG in India after a brief pause in sales. Now back on the market, the CNG version comes equipped with enhanced safety features and added equipment. Recently, the company had launched the updated version of the standard model. Here's a quick look at everything that you need to know. 2025 Grand Vitara CNG: All you need to know The Grand Vitara CNG is offered in the Delta and Zeta trims, priced at Rs 13.48 lakh and Rs 15.62 lakh, ex-showroom, respectively. These were the same variants available earlier, but the big update now is the inclusion of six airbags as standard across both. Maruti Suzuki Swift AMT Long-term Review: Buy or Not? | TOI Auto by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch xu hướng AUD/USD? IC Markets Đăng ký Undo Under the hood, nothing has changed. The SUV continues with Maruti's 1.5-litre, four-cylinder petrol motor, which belts out 88 hp and 121.5 Nm of torque in CNG mode. It is paired with a 5-speed manual gearbox and delivers a claimed fuel efficiency of 26.6 km/kg. In terms of features, the Grand Vitara CNG remains well-equipped. It gets a 9-inch SmartPlay Pro+ touchscreen with wireless Android Auto and Apple CarPlay, wireless charging, ventilated front seats, automatic climate control with rear AC vents, auto-folding ORVMs, and more. In addition to six airbags, the SUV comes with ESP, Hill Hold Assist, ABS with EBD, a tyre pressure monitoring system, front and rear disc brakes, a rear-view camera, and ISOFIX child seat mounts. Stay tuned to TOI Auto for latest updates on the automotive sector and do follow us on our social media handles on Facebook, Instagram and X.

Benchmarks trade near flat line; auto stocks gear up
Benchmarks trade near flat line; auto stocks gear up

Business Standard

timean hour ago

  • Business Standard

Benchmarks trade near flat line; auto stocks gear up

The key domestic indices continued to trade with small gains in morning trade, despite ongoing geopolitical tensions between Israel and Iran. Geopolitical developments are expected to continue influencing the market direction, as investors will closely monitor crude oil prices, developments from the G7 summit and the outcome of the upcoming U.S. Federal Reserve meeting. The Nifty traded above the 24,850 mark. Auto shares staged a rebound after declining in the previous trading session. At 10:25 IST, the barometer index, the S&P BSE Sensex added 33.95 points or 0.04% to 81,626.51. The Nifty 50 index rose 26.75 points or 0.11% to 24,881.35. In the broader market, the S&P BSE Mid-Cap index rose 0.10% and the S&P BSE Small-Cap index fell 0.20%. The market breadth was positive. On the BSE, 1,945 shares rose and 1,505 shares fell. A total of 237 shares were unchanged. Buzzing Index: The Nifty Auto index jumped 1.39% to 23,549.35. The index declined 0.60% in the previous trading session. Maruti Suzuki India (up 2.14%), Eicher Motors (up 2.13%), Mahindra & Mahindra (up 1.97%), TVS Motor Company (up 1.58%), Bajaj Auto (up 1.47%), Hero MotoCorp (up 1.29%), Bosch (up 0.85%), Bharat Forge (up 0.75%), Samvardhana Motherson International (up 0.6%) and Tata Motors (up 0.53%) advanced. Stocks in Spotlight: Manba Finance added 1.05% after the NBFC said that its board will meet on Friday, 20 June 2025, to consider a proposal for issuing debt securities amounting to Rs 200 crore. EMS rose 0.90%. The company has secured the lowest bidder status by UP Jal Nigam (Urban) for construction of various components for sewerage and sewage treatment scheme zone-1 Fatehpur, Uttar Pradesh. The order is worth Rs 183.81 crore. Sanghvi Movers shed 0.56%. The company informed that Ministry of Corporate Affairs has approved the change of name of wholly owned subsidiary company from Samo Renewables to Sangreen SioRenew with effect from 17 June 2025.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store