logo
Medical specialist training gets legal clarity on July 1

Medical specialist training gets legal clarity on July 1

The Stara day ago

PETALING JAYA: There will be greater structure, transparency and legal clarity of both streams of specialist training – the Parallel Pathway and local Master's programmes – once the amendments to the Medical Act come into effect next month, says the Malaysian Medical Association (MMA).
Its president Datuk Dr Kalwinder Singh Khaira expressed his appreciation for the Health Ministry's commitment in strengthening the specialist medical training framework.
'We commend the ministry's clear and timely action in fulfilling its promise to implement the amended Medical Act without undue delay,' he said in a statement yesterday.
The association also thanked the ministry's Medical Develop­ment Division in making the initiative possible.
'The work that has gone into realising these regulatory changes is testament to their professionalism and dedication.
'It also reflects the urgent need to expand access to high-quality specialist training in order to meet the growing demands of our healthcare system, while maintaining patient safety and the highest standards in medical practice,' Dr Kalwinder added.
MMA, he said, looks forward to continued engagement with the ministry and all relevant stakeholders to ensure the implementation of these amendments will be smooth, fair and in the best interest of the people.
Dr RA Lingeshwaran lauded the Health Ministry's move, saying that many participants of the parallel pathway programme were appreciative of the effort.
'I believe they are all very positive that the amendments finally addressed their concerns,' said the senator, who is a former Sungai Bakap hospital director.
Independent health advocate Dr Sean Thum said most feedback from trainees and junior doctors was not solely about the amendments to the Medical Act, but about the structural bottleneck that persists before doctors can even enter specialist training programmes.
'Previously, any eligible doctor could enrol in the parallel pathway programme such as those offered by Royal Colleges abroad.
'The new framework rightly aims to standardise training quality, ensure adequate case exposure and improve supervisor-trainee ratios.
'From a public health perspective, this is a positive move towards safeguarding patient care standards,' he said.
The amendments to the Medical Act, which aim to resolve the issue of parallel pathway programmes and streamline the recognition of qualifications and specialised training, will come into effect on July 1.
In announcing this, Health Minister Datuk Seri Dr Dzulkefly Ahmad said he had signed the order to enforce the amendments to the Act, which will be resubmitted to the Attorney General's Chambers for gazettement.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Bogus dentists caught operating behind beauty salons in Selangor
Bogus dentists caught operating behind beauty salons in Selangor

New Straits Times

time2 hours ago

  • New Straits Times

Bogus dentists caught operating behind beauty salons in Selangor

s SHAH ALAM: Some fake dentists have been found disguising their illegal practices behind elite beauty salons and hair treatment centres. This tactic was exposed following months of intelligence gathering by officers from the Dental Health Division enforcement unit under the Selangor State Health Department. Investigations revealed that a woman in her 30s was the ringleader of the operation, hiding behind a beauty centre located in Section 18, Shah Alam. A source said a surprise inspection was carried out at 1.30pm yesterday, involving officers from the Malaysian Immigration Department and the Health Ministry. "The action followed suspicions that the premises was offering unregistered dental treatments and operated by unqualified individuals. "During the raid, a local woman was found performing treatment for braces on a client in a room at the back of the premises. "Various specialised dental tools used for fitting braces were also found in the room," the source said. Intelligence further revealed that the suspect had been passing on her 'skills' to Indonesian workers to perform the illegal dental procedures. "This was based on admissions made during questioning of one of the female workers at the premises. "The suspect also failed to produce valid documentation to prove that the business was a registered private dental clinic under the Health Ministry. "She also failed to show proof of registration and a valid annual practising certificate as a registered dental practitioner," the source added. Several customers present at the time were also interviewed to assist the investigation. All equipment used for illegal dental treatments was seized for further action. The suspect may be charged under Section 62(1) of the Dental Act 2018 for practising dentistry without registration, and under Section 4(1), read together with Section 27 of the Private Healthcare Facilities and Services Act 1998, for operating an unregistered dental clinic. Fake Dentists Growing Bolder on Social Media. "The existence of unqualified dental practitioners has been a problem for over a decade. But recently, they've become bolder, openly advertising their services on social media," said Islamic Dental Association of Malaysia deputy president Dr Hanif Mohd Suffian. He said these bogus dentists were now offering more advanced services, including fillings and braces installation. "The number of fake dentists is mushrooming because of the quick money they can make. "The cheaper prices they offer, coupled with promotional deals, attract many people to seek their services," he said. Hanif warned that those who opted for such services could contract dangerous infectious diseases. "Cross-contamination between patients can spread infections such as HIV, hepatitis B, hepatitis C, and tuberculosis. "These infections often occur because fake dentists do not follow proper sterilisation procedures for their equipment. "In contrast, licensed dentists never reuse instruments without thoroughly cleaning and sterilising them first," he said. He added that low treatment costs and shorter wait times, especially compared to government clinics, were other factors pushing people toward these illegal services. "There are two specific laws governing dental treatment: the Dental Act 2018 (Act 804), which clearly states that only qualified dentists can carry out dental procedures; and Act 586, which requires that all dental services be performed in facilities registered with the Health Ministry," he said.

Contractors still responsible for defects at RM375m ESG-built Pasir Gudang hospital, says Works D-G
Contractors still responsible for defects at RM375m ESG-built Pasir Gudang hospital, says Works D-G

Malay Mail

time3 hours ago

  • Malay Mail

Contractors still responsible for defects at RM375m ESG-built Pasir Gudang hospital, says Works D-G

JOHOR BARU, June 29 — Contractors have been reminded to act swiftly and responsibly in addressing any complaints during the defects liability period for the Pasir Gudang Hospital (HPG) project, said Public Works Department (PWD) director-general Datuk Roslan Ismail. He said that despite full building management and control being handed over to the Health Ministry (MoH) following the hospital's completion on June 12, contractors are still responsible for correcting any defects. 'Contractors must continue to fulfill their obligations throughout the defects liability period as stipulated in the contract. 'Therefore, I would like to remind contractors to carry out preventive maintenance according to schedule and to act promptly and responsively in addressing and rectifying any complaints,' he said during the project handover ceremony of the hospital here today. Also present was Health Minister Datuk Seri Dr Dzulkefly Ahmad. Roslan said the original completion date for the 20.653-hectare hospital was Sept 15 last year, with a total project cost of RM375.5 million, following site possession on Sept 15, 2020. The Certificate of Completion and Compliance (CCC) was issued on May 27 this year, followed by the Certificate of Practical Completion (CPC) on June 12. He attributed the project's completion to the cooperation of various stakeholders, despite facing numerous challenges, including on-site disruptions and operational delays due to the COVID-19 pandemic. Roslan said the project adopted the Design and Build method and followed Environmental, Social and Governance (ESG) principles, making it sustainable, resilient and environmentally friendly. The hospital is expected to improve access to healthcare facilities for local residents, with 304 beds and 14 specialist services, which will help reduce overcrowding at Hospital Sultanah Aminah (HSA) and Hospital Sultan Ismail (HSI). The project scope included construction of the main hospital block, staff quarters, nurses' dormitory, plant and support buildings, 1,507 parking bays, 320 motorcycle lots and 32 parking spaces for persons with disabilities. — Bernama

Hospital Pasir Gudang to open Aug 1, fully operational next July, says Dr Dzul
Hospital Pasir Gudang to open Aug 1, fully operational next July, says Dr Dzul

The Star

time3 hours ago

  • The Star

Hospital Pasir Gudang to open Aug 1, fully operational next July, says Dr Dzul

JOHOR BARU: Hospital Pasir Gudang (HPG) will officially open its doors to the public on Aug 1, says Datuk Seri Dr Dzulkefly Ahmad. The Health Minister said the RM500mil public hospital will open in phases, with the first phase making up 30% of the facility's overall capacity. 'HPG is the eighth major public hospital in Johor, offering 304 beds and 14 specialist disciplines in total, including general surgery, pediatrics, obstetrics and gynaecology as well as staff quarters. 'We are aiming for the hospital to be fully operational by July next year,' he said after witnessing the handover of the project from the Public Works Department (JKR) to the Health Ministry at HPG, located in Bandar Seri Alam, Pasir Gudang on Sunday (June 29). He noted that HPG is also equipped with 20 units of on-call suites for doctors - a first in the country's public healthcare facility - in a bid to boost their welfare and morale. 'HPG, which was completed on time with state-of-the-art facilities, is the Health Ministry's trophy asset and should be made a benchmark for its future healthcare projects. 'At full capacity, the hospital is expected to help decongest and reduce the bed occupancy rate at Hospital Sultanah Aminah (HSA) and Hospital Sultan Ismail in Johor Baru by at least 10%. 'We also aim to reduce the waiting time for elective surgery at HSA by about 30% in the first two years,' he added. The project, which kicked off in 2020, was completed on June 12 this year.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store