
Lincolnshire level crossings set to be modernised
Four level crossings in Lincolnshire will benefit from nearly a million pounds being spent by Network Rail on renewal work. The resurfacing will be carried out at Holton le Moor, Brigg, Butterswood and Little London. The crossings will be closed and some rail services will be affected while the work is carried out.Network Rail said the upgrades will "make future maintenance more efficient and cost effective."
The work will be completed in phases between 31 May to 8 June. Network Rail said the resurfacing will renew "decades-old features which are now life expired."There will be some changes to train services, with rail replacement buses running between Cleethorpes and Barnetby on some dates, the organisation said. Passengers have been advised to check with their rail operator before they travel.
Listen to highlights from Lincolnshire on BBC Sounds, watch the latest episode of Look North or tell us about a story you think we should be covering here.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

The National
4 hours ago
- The National
Highland railway line to close for 3 weeks as £11.5m work to begin
The Far North Line, which dates to the 19th century, is the UK's northernmost railway and is seen as a vital transport link for communities across the Highlands. A five-mile stretch between Brora and Helmsdale, and nearly nine miles of track between Invergordon and Fearn, will be closed from Sunday to allow repair work to be undertaken. Network Rail, which is carrying out the work, said that with some track components approaching 100 years old, it is essential that some upgrades are made to maintain the lines' safety and performance for the future. READ MORE: Plans approved to demolish Scottish town's old police station Ross Moran, route director at Network Rail Scotland, said he is grateful to passengers for their patience and understanding while the line is closed. He said: 'The Far North Line plays a crucial role in connecting remote communities, as well as welcoming visitors to one of Scotland's most scenic regions. 'While closing the line is never ideal, this concentrated period of work allows us to deliver the vital upgrades efficiently and avoid prolonged disruption over a longer timeframe. 'I'm grateful to passengers for their patience and understanding, and we look forward to reopening the line with improvements that will benefit everyone who travels on it.' To allow engineers to carry out the work safely and efficiently, the line will be closed between Sunday, June 8, and Monday, June 30, with changes to train services during this period. Mark Ilderton, ScotRail service delivery director, said there will be a rail replacement plan in operation, with buses and limited train services running where possible. He said: 'We understand that this work will mean some temporary disruption to journeys, however, it's a vital investment in the long-term future of the route. 'To keep customers moving throughout the works, we'll have a rail replacement plan in operation, with buses and a limited train service running where possible. 'We thank our customers for their patience, and look forward to welcoming them back on the line when the works complete.'


Sky News
a day ago
- Sky News
Why is there a row about the railway line between Oxford and Cambridge?
A row has broken out about the railway line between Oxford and Cambridge. The East West Rail Project is set to make travel across Britain easier, according to Network Rail, by re-establishing a link between the two university towns. But it is classed as an England and Wales project, meaning that Wales does not get a share of funding, unlike in Scotland and Northern Ireland. Opposition parties have called for the project to be changed to England-only. Rail infrastructure in Wales is a reserved matter, which means it is the responsibility of the UK government rather than the Welsh government. The Liberal Democrats said Wales would get more than £300m if the government changed the project to England-only. Wales would get that money through the Barnett Formula - the population-based method which decides how much money devolved governments get to spend. Politicians have similarly called on Wales to get "up to £5bn" of consequential funding from the HS2 project, which has also been classed as England and Wales. Wales's first minister, Eluned Morgan, told Sky News earlier this year she was expecting an "uplift" in money for Welsh railways and branded the HS2 funding "unfair". 11:36 In a landmark speech last month, Baroness Morgan called for a "fair deal" for Wales as she sought to reset the relationship between the Welsh and UK governments. David Chadwick, Liberal Democrat MP for Brecon, Radnor and Cwm Tawe, said it was "HS2 all over again". "All we want is Wales to be treated fairly, to receive the same treatment as Scotland and Northern Ireland," he said. Ben Lake, Plaid Cymru 's MP for Ceredigion Preseli, said neither the East West Rail Project or HS2 have been "designed to deliver benefits to communities in Wales". "The UK government has previously designated large rail projects in England, such as Cross Rail in London, as projects benefitting England alone, and if it were to reclassify HS2 and the Oxford to Cambridge projects in the same way, Wales could stand to gain billions in consequential funding," he added. Sam Rowlands, the Welsh Conservatives ' shadow transport secretary, said the project highlighted "further unfairness in funding". "The Welsh Conservatives have consistently called for Wales's fair share of HS2 funding and maintain that this new project must also deliver fair consequential funding," he added.


BBC News
2 days ago
- BBC News
Alfreton railway station's £6.75m upgrade completed
A £6.75m project to improve accessibility for passengers at a Derbyshire railway station has been lifts were added at each side of the track as part of the work at Alfreton station, while the ageing footpath was upgradedThe changes are aimed at making it easier for passengers who have limited mobility, use wheelchairs or have heavy luggage, bikes or pushchairs with Midlands Railway said the lifts will be in use at certain times of the day throughout June as part of a trial period and they will not be working on Sundays. A new ramp and steps connecting the car park with the station entrance have also been provided as part of the platforms were fully resurfaced as part of the work, with tactile paving. New CCTV and new lights have also been installed. The project was delivered as part of the Department for Transport's Access for All scheme to deliver accessibility improvements at railway stations, with a portion of funding also coming from Network Matthews, Network Rail head of operations delivery, said: "We are delighted to bring the new lifts at Alfreton into use, complementing the upgraded footbridge and bringing step-free access to the station for the first time."We hope the improvements will encourage more people to travel by train."Amber Valley MP Linsey Farnsworth added: "This significant investment will make a real difference for local residents and visitors, ensuring that everyone, regardless of mobility, can travel with greater comfort and independence."She also thanked Alfreton Town Council which has "campaigned tirelessly" for improved access at the station for decades.