
Strong winds and rains cause cancellations and closures across the Maritimes
Environment Canada issued a Les Suêtes Wind Warning for Inverness County, N.S. on Friday.
Southeasterly gusts up to 100km/h are expected in Margaree Harbour to Bay St. Lawrence throughout the day but expected to slow down at night.
Environment Canada warns the winds could cause injuries or damage, saying drivers should be cautious and prepare to make alternate routes due to diminished driving conditions.
Rain and high winds have also caused several ferry cancellations across the Atlantic region, including:
the Marine Atlantic ferry between Syndey, N.S. and Port aux Basques, N.L.
the Northumberland ferry between Wood Islands, P.E.I. and Caribou, N.S.
the CAT ferry between Bar Harbor, ME and Yarmouth, N.S.
Sports fields in Charlottetown were closed for the day and the Confederation Bridge speeds have been reduced.
CTV Atlantic meteorologist Kalin Mitchell says thunderstorms and wet weather are expected to continue into the weekend. But fast-moving winds will prevent rain from staying in one area for too long.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


CBC
7 hours ago
- CBC
'Long overdue' dikeland upgrades coming to rural N.S. community
A rural Nova Scotia community on the Bay of Fundy is preparing for the most significant upgrades in decades to the dikeland system that protects it from flooding. The work has been approved for Advocate Harbour, N.S., which has been identified as being at risk due to rising sea levels caused by climate change. People who live along the shore of the coastal community got to see plans for the project at a meeting in April. "It's been a long time coming," said Linda Black, whose home is within a couple of hundred metres of the shore. "It's scary when the tide is in full and that water is up to the top of the rocks." Her neighbour Mike Berry recalls the water being at his fence line during a storm in 2019. "The cattle were stranded on the high points. There was no damage, but it just put things in perspective," Berry said. The upgrades will see the height of the dike walls increased by two metres to an elevation of 7.6 metres in some parts. They will also be extended by an additional 500 metres to provide added protection to the community. The project is equally funded by the provincial and federal governments through a disaster mitigation and adaptation fund. Climate change is the big driver for the reinforcement work, with projections in Nova Scotia showing sea levels are anticipated to rise up to one metre by 2100. "The risk currently is that we're seeing flooding in certain regions of Nova Scotia and with the dike increase in height, we would protect the town and local infrastructure and agricultural farmlands from that flooding," said Jessica LeBlanc, a project engineer for the provincial Department of Public Works. While the dikes are continually maintained, LeBlanc said there has not been extensive work on them since the 1950s. The site is one of 16 the province earmarked for upgrades based on their vulnerability. Thousands of tons of armour rock will be needed to build up the seaward side of the dike, with grass on the land side, she said. The number of trucks that will be carrying rock through the community is a concern for the owners of the Wild Caraway restaurant. They are worried that the amount of construction might spoil the experience for their guests, who could also lose some of the impressive harbour view when the dike is raised. However, they're also pleased there will be added defence from any possible storm surges. "It's always in the back of our minds," said Marchel Strong, the councillor for the area, who is also a volunteer firefighter and has been part of the flood risk committee. "It's not if, it's when we have another breach. And it could be anytime," Strong said. "So it's definitely something that is long overdue." People in the area prefer the option that is now going ahead rather than raising up the road, which Strong said could have resulted in having to relocate the post office. And she's happy that on top of the dike there will be walking trails people can explore when the tide is out. "It'll make it much more viable for tourists," Strong said, estimating the project will cost about $7 million. The Advocate Country Store, located close to the shoreline, is pleased to know the embankments will be strengthened. The residential care facility just across the street, which already has a disaster plan in place, also thinks the work is important. "If a big storm happened and the dike breached, we would be quite vulnerable as our residents would have to be transported elsewhere and the community is quite isolated," said Bernadette Frank, the administrator of Chignecto Manor. There is still some permitting and regulatory work to be done, but the province expects work will start in the fall. The sheer size of the project means it will also take some time, with the province estimating construction will last up to two years.


CBC
18 hours ago
- CBC
Hot classrooms have P.E.I. teachers' union urging province to take chilling actions
Social Sharing It didn't take long for Prince Edward Island to switch from sweater weather to sweaty weather this spring. Many Island schools that have never had air conditioning became mini saunas as the high temperatures really set in with the start of June, some teachers and students say. "Some classrooms don't have fans… Even with the windows open, it just gets really hot," said Charlottetown student Joey Ho. "Sometimes I get headaches because of how hot it is." "Sometimes I get too hot and I just ask to go on walks and miss like half of the class because it's just too hot. I can't handle it in there," said Emilio Hernandez. Asking for a bathroom break, the high school student said, he will "just go on a walk and refresh myself and come back." "It gets to a point where you're sitting down and you're really uncomfortable because you're sweating," agreed Mohammad Arif. The P.E.I. Teachers' Federation has been feeling the heat too, so much so that it has come up with a multi-year plan that it wants the province to adopt to make the shoulder months of June and September more bearable. WATCH | P.E.I. schools have never needed air conditioning. That's changing, and they're sweltering: P.E.I. schools have never needed air conditioning. That's changing, and they're sweltering 29 minutes ago Duration 3:06 "As climate changes and days get hotter and hotter and more days are hotter and hotter, we need to look forward to the future and say: When is it too hot? When is the heat in the school just too much for the students and the staff to bear?" said federation president Andy Doran. Environment Canada data show temperatures in June have been above historical averages in six of the last 10 years. That's part of the reason why the union would like to see a policy in place within the next six months that sets out what will be done when classrooms and offices are too hot. In addition, it is asking the province to: Supply fans for all teachers who request them. Place at least one cooling centre in every school by 2028. Ensure all schools are climate-controlled within 10 years. Doran has vivid memories of 2021, when classes were in session while the humidex on P.E.I. reached around 40 C. "Teachers were phoning the federation looking for guidance on what to do. Kids were feeling ill. Staff were feeling ill, and that's where we got this whole idea of 'we need to get something put in place,' because there's more and more of these days every year." To illustrate the need for such a policy, the union asked teachers across the province to send in photos of thermometers in their classrooms this week. Some displayed readings as high as 31 C. MLAs invited to schools The federation also asked MLAs to visit local schools to feel the heat for themselves. "They invited me into Birchwood, so I popped in there yesterday morning and I did breakfast program there this morning," said Green MLA Karla Bernard, who was a counsellor with the Public Schools Branch before she was elected. "The difference in the temperature in one day — it was so hot in there this morning, I was sweating just from making breakfast." She said that Charlottetown intermediate school got 30 fans from the provincial government, but they haven't helped much. The Department of Education and Early Years said it has spent $125,436.73 on a total of 1,335 fans "as an interim solution" and they are currently being distributed to Island classrooms. "Teachers also have a variety of educational strategies and practices at their disposal to deliver curriculum that also balances student needs. For example, they can move to different teaching environments, add additional breaks, modify movements, etc.," the department said in an email. The Public Schools Branch told CBC News it has distributed all 1,225 of the fans it received from that tendering process.


CTV News
21 hours ago
- CTV News
Halifax's MacKay Bridge closed Friday, Monday nights
Halifax's Mackay Bridge is seen from the Bedford Basin in an undated file photo. (CTV/Dave Ead) The MacKay Bridge in Halifax will be partially closed for four hours on Friday and Monday nights. Halifax Harbour Bridges says the bridge will be closed to all Dartmouth-bound traffic from 8 p.m. to midnight on Friday. It will then be closed to all Halifax-bound traffic from 8 p.m. to midnight on Monday. 'The closures will allow crews to lower the Windmill Road Overpass after bearing replacement work is complete,' a news release from Halifax Harbour Bridges says. The Macdonald Bridge will be open to traffic during these closures. For more Nova Scotia news, visit our dedicated provincial page