
Lomiko Metals Announces Extension to Hard Dollar and Flow-Through Financing
MONTREAL--(BUSINESS WIRE)--Lomiko Metals Inc. (TSX.V: LMR) ('Lomiko' or the 'Company') announces that it will apply to the TSX to extend the closing of the hard dollar and flow-through financing to May 31, 2025, details of which were disclosed in the Company's press release April 1, 2025.
About Lomiko Metals Inc.
The Company holds mineral interests in its La Loutre graphite development in southern Quebec. The La Loutre project site is within the Kitigan Zibi Anishinabeg (KZA) First Nation's territory. The KZA First Nation is part of the Algonquin Nation, and the KZA traditional territory is situated within the Outaouais and Laurentides regions. Located 180 kilometers northwest of Montreal, the property consists of one large, continuous block with 76 mineral claims totaling 4,528 hectares (45.3 km2).
The Property is underlain by rocks from the Grenville Province of the Precambrian Canadian Shield. The Grenville was formed under conditions that were very favorable for the development of coarse-grained, flake-type graphite mineralization from organic-rich material during high-temperature metamorphism.
Lomiko published an updated Mineral Resource Estimate (MRE) in a NI 43-101 Technical Report and Mineral Resource Estimate Update for the La Loutre Project, Quebec, Canada, prepared by InnovExplo on May 11th, 2023, which estimated 64.7 million tonnes of Indicated Mineral Resources averaging 4.59% Cg per tonne for 3.0 million tonnes of graphite, a tonnage increase of 184%. Indicated Mineral Resources increased by 41.5 million tonnes as a result of the 2022 drilling campaign, from 17.5 million tonnes in 2021 MRE with additional Mineral resources reported down-dip and within marble units resulted in the addition of 17.5 million tonnes of Inferred Mineral Resources averaging 3.51% Cg per tonne for 0.65 million tonnes of contained graphite; and the additional 13,107 metres of infill drilling in 79 holes completed in 2022 combined with the refinement of the deposit and structural models contributed to the addition of most of the Inferred Mineral Resources to the Indicated Mineral Resource category, relative to the 2021 Mineral Resource Estimate. The MRE assumes a US$1,098.07 per tonne graphite price and a cut-off grade of 1.50% Cg (graphitic carbon).
The Company also holds interest in seven early-stage projects in southern Quebec, including Ruisseau, Tremblant, Meloche, Boyd, Dieppe, North Low and Carmin, covering 328 claims in total on 7 early-stage projects covering 18,622 hectares in the Laurentian region of Quebec and within KZA territory.
The stage graphite portfolio consists of 328 claims in total on 7 early-stage projects covering 18,622 hectares in southern Quebec.
Ruisseau–grades up to 27.9 percent carbon graphite ('% Cg') from four distinct high grade mineralized zones that are over 3km long;
Meloche–grades up to 13.3% Cg from two distinct mineralized clusters;
Tremblant–grades up to 11.6% Cg from numerous, widespread spot anomalies; and
Dieppe–grades up to 6.82% Cg from numerous, widespread spot anomalies and a distinct mineralized cluster.
Boyd–8 samples grades range from 5.61% Cg to 17.10% Cg with all samples above 5.00% Cg
In addition to La Loutre, Lomiko has earned-in its 49% stake in the Bourier Project from Critical Elements Lithium Corporation as per the option agreement announced on April 27 th, 2021. The Bourier project site is located near Nemaska Lithium and Critical Elements south-east of the Eeyou Istchee James Bay territory in Quebec, which consists of 203 claims for a total ground position of 10,252.20 hectares (102.52 km2), in Canada's lithium triangle near the James Bay region of Quebec that has historically housed lithium deposits and mineralization trends.
The Yellow Fox Property is located approximately 10 km southwest of the Town of Glenwood NL, and south of the Trans-Canada Highway. The Property occurs within NTS map sheets 02D/14 and 15 with excellent access along several logging and skidder roads originating from Glenwood. The main Yellow Fox showing is located in the central part of License 027536M, 5km from the western end of Gander Lake.
This property is on the same trend as the past-producing antimony mine Beaver Brook, which is located 25km southwest of the property. Yellow Fox is an early-stage exploration property prospective in antimony, gold, and silver where historic works returned samples anomalous in gold (Au), antimony (Sb), lead (Pb), zinc (Zn), and silver (Ag). The trenching exposed the rocks, resulting in grab samples to 59.43g/t Au, 11.10% Sb, 7.00% Zn, 72.90g/t Ag, and 5.50% Pb in arsenopyrite-stibnite veins within altered monzogranite. (See Metals Creek assessment report at https://gis.geosurv.gov.nl.ca/geofilePDFS/Batch2016/002D_0779.pdf)
On behalf of the Board,
Gordana Slepcev
CEO & President and Director, Lomiko Metals Inc.
For more information on Lomiko, review the website at www.lomiko.com.
Cautionary Note Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. The information in this news release about the Company; and any other information herein that is not a historical fact may be "forward-looking information" ('FLI'). All statements, other than statements of historical fact, are FLI and can be identified by the use of statements that include words such as "anticipates", "plans", "continues", "estimates", "expects", "may", "will", "projects", "predicts", 'proposes', "potential", "target", "implement", 'scheduled', "intends", "could", "might", "should", "believe" and similar words or expressions. FLI in this new release includes, but is not limited to: the total gross proceeds of the offering, the use of proceeds of the offering, the timing and successful completion of the offering; the Company's ability to successfully fund, or remain fully funded for the implementation of its business strategy and for exploration of any of its projects (including from the capital markets);, and the expected timing of announcements in this regard. FLI involves known and unknown risks, assumptions and other factors that may cause actual results or performance to differ materially.
The FLI in this news release reflects the Company's current views about future events, and while considered reasonable by the Company at this time, are inherently subject to significant uncertainties and contingencies. Accordingly, there can be no certainty that they will accurately reflect actual results. Assumptions upon which such FLI is based include, without limitation: the Company's, ability to implement its overall business strategy and to fund, explore, advance and develop each of its projects, including results therefrom and timing thereof, the impact of increasing competition in the mineral exploration business, including the Company's competitive position in the industry, and general economic conditions, including in relation to currency controls and interest rate fluctuations.
The FLI contained in this news release are expressly qualified in their entirety by this cautionary statement, the 'Forward-Looking Statements' section contained in the Company's most recent management's discussion and analysis (MD&A), which is available on SEDAR+ at www.sedarplus.ca. All FLI in this news release are made as of the date of this news release. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on such forward-looking information. The Company does not undertake to update or revise any forward-looking information contained herein to reflect new events or circumstances, except as may be required by applicable securities laws.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
an hour ago
- Yahoo
Soybean Pressure Continuing on Wednesday Morning
The soybean market is trading with losses of 4 to 6 cents. Soybeans fell back another 9 to 12 cents on Tuesday. Preliminary open interest was up 17,807 contracts on Tuesday with the exception to July (down 26,088 contracts). The cmdtyView national average Cash Bean price was down 9 3/4 cents at $10.01 3/4. Soymeal futures were $1 to $2.10/ton lower. Soy Oil was down 96 to 114 points on the day. Crude oil losses, down $3.50/barrel, added to the bean oil weakness. The forecast continues to look less threatening to the US, with rains of at least an inch from the Northern Plains to the Eastern Corn Belt over the next week. Coffee Prices Plummet as Frost Risks in Brazil Subside Robusta Coffee Prices Are Still Falling. Are We Finally at an Inflection Point? Coffee Prices Slammed as Frost Risks in Brazil Recede Markets move fast. Keep up by reading our FREE midday Barchart Brief newsletter for exclusive charts, analysis, and headlines. Brazil's soybean exports for June are expected to total 14.99 MMT according to ANEC, which is up from the 14.36 MMT previous estimate. Jul 25 Soybeans closed at $10.46 3/4, down 12 cents, currently down 5 cents Nearby Cash was $10.01 3/4, down 9 3/4 cents, Aug 25 Soybeans closed at $10.50 1/4, down 11 3/4 cents, currently down 4 3/4 cents Nov 25 Soybeans closed at $10.37, down 9 3/4 cents, currently down 5 1/2 cents New Crop Cash was $9.84 3/4, down 9 1/4 cents, On the date of publication, Austin Schroeder did not have (either directly or indirectly) positions in any of the securities mentioned in this article. All information and data in this article is solely for informational purposes. This article was originally published on


Business Wire
2 hours ago
- Business Wire
Contineum Therapeutics Provides Update on Phase 1b Positron Emission Tomography (PET) Trial of PIPE-791
SAN DIEGO--(BUSINESS WIRE)--Contineum Therapeutics, Inc. (NASDAQ: CTNM) (Contineum or the Company), a clinical-stage biopharmaceutical company pioneering differentiated therapies for the treatment of neuroscience, inflammation and immunology (NI&I) indications, today announced an update on its Phase 1b positron emission tomography (PET) trial of PIPE-791, a selective antagonist of the lysophosphatidic acid 1 (LPA1) receptor. The Company has completed enrollment of the healthy volunteer and progressive multiple sclerosis (PrMS) cohorts of this trial. The screening and enrollment of idiopathic pulmonary fibrosis (IPF) patients to participate in this trial is ongoing. 'In early June, consistent with our protocol, we enrolled two additional PrMS patients to assess PET imaging of the brain,' said Timothy Watkins, M.D., Chief Medical Officer and Head of Development, Contineum Therapeutics. 'While adding these additional patients to the trial has led to a modest delay in reporting our topline data, we believe the enhanced clinical understanding of PIPE-791 in patients is important to the program. This trial builds on our compelling preclinical data and improves our understanding of receptor occupancy in healthy volunteers and patients, helping guide our dose selection in the next stages of clinical development. We now anticipate reporting topline data from these fully enrolled cohorts in the third quarter of 2025.' The Phase 1b, open label, single-center trial is designed to assess the correlation between pharmacokinetics and LPA1 receptor occupancy using PET imaging in healthy volunteers, as well as IPF and PrMS patients. To date, 12 healthy volunteers and four PrMS patients have participated in this trial. More information on this trial can be found at (NCT06683612). About Contineum Therapeutics Contineum Therapeutics (Nasdaq: CTNM) is a clinical-stage biopharmaceutical company pioneering novel, oral small molecule therapies for NI&I indications with significant unmet need. Contineum is advancing a pipeline of internally-developed programs with multiple drug candidates now in clinical trials. PIPE-791 is an LPA1 receptor antagonist in clinical development for idiopathic pulmonary fibrosis, progressive multiple sclerosis and chronic pain. PIPE-307 is a selective inhibitor of the M1 receptor in clinical development for relapsing-remitting multiple sclerosis and major depressive disorder. For more information, please visit Forward-Looking Statements Certain statements contained in this press release, other than historical information, constitute forward-looking statements within the meaning of the federal securities laws. Forward-looking statements include, but are not limited to, statements regarding the Company's clinical trial and product development plans and timelines, including, but not limited to, those regarding the anticipated timing and results of topline data from the healthy volunteer and PrMS cohorts from the Company's ongoing Phase 1b PET trial; the potential of the Company's Phase 1b PET trial to improve the Company's understanding of target occupancy of PIPE-791 or to guide dose selection for further clinical development, or to predict future clinical outcomes or results; the indications, anticipated benefits of, and market opportunities for its drug candidates; its business strategies and plans; and the quotations of the Company's management. These statements involve known and unknown risks, uncertainties and other important factors that are in some cases beyond the Company's control and may cause its actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. These risks and uncertainties, include, but are not limited to, the following: the Company is heavily dependent on the success of PIPE-791 and PIPE-307, both of which are in the early stages of clinical development, and neither of these drug candidates may progress through clinical development or receive regulatory approval; the results of earlier preclinical studies and clinical trials, including those conducted by third parties, may not be predictive of future results and unexpected adverse side effects or inadequate efficacy of the Company's drug candidates may limit their development, regulatory approval and/or commercialization; the timing and outcome of research, development and regulatory review is uncertain; clinical trials and preclinical studies may not proceed at the time or in the manner expected, or at all; the potential for the Company's programs and prospects to be negatively impacted by developments relating to the Company's competitors, including the results of studies or regulatory determinations relating to the Company's competitors; risks associated with reliance on third parties to successfully conduct clinical trials and, in the case of PIPE-307, the Company's reliance, pursuant to a global license and development agreement, upon Janssen Pharmaceutica NV, a Johnson & Johnson Company, to develop PIPE-307 for any other indication other than relapsing-remitting multiple sclerosis (RRMS) and, after completion of the Company's PIPE-307 Phase 2 VISTA trial, Janssen Pharmaceutica NV's decision, in its sole discretion, whether or not to further develop PIPE-307 for relapsing-remitting multiple sclerosis (RRMS); the Company has incurred significant operating expenses since inception and it expects that its operating expenses will continue to significantly increase for the foreseeable future; the Company's license agreement with Janssen Pharmaceutica NV may not result in the successful development of PIPE-307; the Company may be unable to obtain, maintain and enforce intellectual property protection for its technology and drug candidates; and unstable macroeconomic and market and economic conditions and uncertainty caused by, among other things, geopolitical conditions, tariffs or threatened tariffs, inflation volatility, and military conflict may adversely affect the Company's business and financial condition and the broader economy and biotechnology industry. Additional risks and uncertainties that could affect the Company's business, operations and results are included under the captions, 'Risk Factors' and "Management's Discussion and Analysis of Financial Condition and Results of Operations' in the Company's periodic filings and in other filings that the Company makes with the Securities and Exchange Commission (SEC) from time to time, which are available on the Company's website at under the Investor section and on the SEC's website at Accordingly, readers should not rely upon forward-looking statements as predictions of future events. Except as required by applicable law, the Company undertakes no obligation to update publicly or revise any forward-looking statements contained herein, whether as a result of any new information, future events, changed circumstances or otherwise.
Yahoo
2 hours ago
- Yahoo
Hyundai's exports from US plunge in May and June
Hyundai Motor Company reported that its US vehicle manufacturing subsidiary, Hyundai Motor Manufacturing Alabama (HMMA), has sharply cut back on exports in the last two months as the plant prioritized domestic sales following the introduction of 25% duties on all vehicles imported into the US earlier this year. Hyundai Motor exported a total of 637,000 vehicles from South Korea to the US last year, but the company is having to readjust its global production strategies in response to the recent changes in US foreign trade policy. This includes 'redirecting' US-made vehicles to the domestic market instead of exporting them, to help reduce the company's exposure to US import tariffs. HMMA exported a total of 22,600 vehicles last year, including the Tucson, Santa Fe, Santa Cruz and Genesis GV70 SUVs, to other markets in the region. Exports in May plunged by 45% to 1,303 units from 2,386 units a year earlier, while in June the company exported just 14 vehicles. This is the first time monthly exports have fallen below 100 units since 2020. Production at the Alabama plant is also being expanded, to replace US imports from the company's Mexican operations. Earlier this year, a Hyundai spokesperson told reporters that, "in order to minimize the impact of US tariffs, we have implemented measures to shift Tucson production from Mexico to HMMA and have moved HMMA's Canadian-bound production to Mexico." Hyundai Motor Group (HMG) also completed construction of a new 300,000 unit/year plant in the US state of Georgia last year, with production ramping up this year as new Hyundai and Kia models are added. HMG has also confirmed that it will expand the Georgia plant's production capacity to 500,000 units per year later in the decade. "Hyundai's exports from US plunge in May and June" was originally created and published by Just Auto, a GlobalData owned brand. The information on this site has been included in good faith for general informational purposes only. It is not intended to amount to advice on which you should rely, and we give no representation, warranty or guarantee, whether express or implied as to its accuracy or completeness. You must obtain professional or specialist advice before taking, or refraining from, any action on the basis of the content on our site.