logo
Delhi-Dehradun expressway: What's the cost and when will it open?

Delhi-Dehradun expressway: What's the cost and when will it open?

Time of India25-05-2025

Delhi-Dehradun expressway update: Delhi-Dehradun Expressway updates: The much-awaited Delhi-Dehradun Expressway is nearing completion and is expected to transform travel between the national capital and Uttarakhand's capital. Once fully operational, this expressway will reduce travel time from 6.5 hours to just 2.5 hours, offering faster, smoother, and more convenient journeys.
Project Overview: A Game-Changer for North India
The Delhi-Dehradun Expressway, officially known as National Highway 709B, is one of India's most ambitious infrastructure projects. It stretches across 210 kilometres, starting from Akshardham in Delhi and passing through Baghpat, Shamli, and Saharanpur in Uttar Pradesh, before reaching Dehradun in Uttarakhand.
The expressway aims to improve regional connectivity and boost tourism, trade, and transport between Delhi and the hill states.
Delhi-Dehradun Expressway Cost: A Massive Rs 12,000 Crore Investment
The total cost of the Delhi-Dehradun Expressway is estimated at Rs 12,000 crore, as reported in PIB. This huge investment includes the construction of highways, tunnels, bridges, service roads, and other infrastructure.
Another related project—a 26-km elevated road in Dehradun—is also in the pipeline. This corridor will connect the expressway directly to Mussoorie, with an additional cost of Rs 6,100 crore, which includes both construction expenses and compensation for displaced residents.
Key Features of the Delhi-Dehradun Expressway
The expressway is packed with modern features designed to ensure safety, speed, and comfort:
113 underpasses for smooth traffic flow
5 railway overbridges for uninterrupted travel
76 km of service roads
16 entry and exit points
29 km of elevated road sections
62 bus shelters for public transport accessibility
A 340-metre-long, three-lane tunnel at Datkali in Dehradun
Designed for a speed of 100 km/h
When Will the Delhi-Dehradun Expressway Open?
According to reports on May 17, Union Minister of State for Road Transport and Highways, Harsh Malhotra, visited the entire route and confirmed that most parts of the expressway are already complete. Regional Officer of the NHAI Delhi Region, Mohammed Saifi, stated that the final sections would be ready within 2 to 3 months.
Testing of the completed stretches has been finalised, and the final report is expected soon. The expressway is likely to open by late June or early July 2025.
Challenges and Delays in the Project
While most of the construction is complete, some delays occurred due to land disputes and technical issues:
A legal dispute over land in Mandola, Ghaziabad—a two-storey house lies on a key section, and authorities are awaiting court orders.
A pillar collapsed in Saharanpur in March 2025, which was quickly addressed and managed without major consequences.
Delhi to Mussoorie in Just 4 Hours?
Another major benefit of this project is the planned 26-km elevated road that will connect Dehradun to Mussoorie. This new link will allow travellers to reach the hill station from Delhi in just 4 hours, as reported in Livemint.
The elevated corridor will cross the Rispana and Bindal rivers and will require land acquisition in 26 localities. Over 2,600 houses along the riversides will be demolished to make way for the project. This corridor aims to offer seamless travel to popular destinations in the hills.
Boost to Char Dham and Religious Tourism
The expressway will also connect to the Char Dham Highway, improving access to major pilgrimage sites in Uttarakhand. It is expected to significantly boost religious tourism by reducing travel time and ensuring better road safety.
The Delhi-Dehradun Expressway is set to be a landmark project that will not only reduce travel time but also improve connectivity, promote tourism, and strengthen the economy in northern India. With a cost of Rs 12,000 crore and cutting-edge features, it is all set to open by mid-2024, bringing Delhi, Dehradun, and even Mussoorie closer than ever before.
For the latest and more interesting financial news, keep reading Indiatimes Worth. Click here.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

'Had a good darshan': Farooq Abdullah visits Maa Vaishno Devi shrine; calls Vande Bharat train 'biggest gift' to J&K
'Had a good darshan': Farooq Abdullah visits Maa Vaishno Devi shrine; calls Vande Bharat train 'biggest gift' to J&K

Time of India

time2 hours ago

  • Time of India

'Had a good darshan': Farooq Abdullah visits Maa Vaishno Devi shrine; calls Vande Bharat train 'biggest gift' to J&K

Farooq Abdullah after visiting the Maa Vaishno Devi shrine NEW DELHI: A day after travelling on the newly launched Vande Bharat train from Srinagar to Katra, Jammu and Kashmir National Conference chief Farooq Abdullah visited the Vaishno Devi shrine and offered prayers on Wednesday. "I had a good darshan and I hope that we will get what I prayed for. We want prosperity, unity, brotherhood. We all want India to grow so that we can be part of that," the former Jammu and Kashmir chief minister said. Farooq Abdullah also praised the Vande Bharat train service, calling it the "biggest gift" for the people of Jammu and Kashmir as it connects the territory with the entire country. "This is the biggest gift to connect Jammu and Kashmir with the entire country... I had tears in my eyes when I crossed the Chenab Bridge. Finally, the day has come when we can travel to the country from Kashmir by train. I want to congratulate all the workers and engineers who built this bridge..." he said. Abdullah reached Shri Mata Vaishno Devi Katra railway station on Tuesday after boarding the Vande Bharat train from Nowgam (Srinagar) Railway Station. Speaking to reporters, the NC chief said that his eyes became "teary" after the train crossed the Chenab Bridge. Notably, the Chenab Bridge, the highest railway arch bridge in the world, stands as a milestone project for Indian Railways , completed after years of overcoming challenges in the difficult Himalayan terrain. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Gelsenkirchen: Gutes Hören sucht 700 Testhörer für Hörgeräte ohne Zuzahlung Gutes Hören Undo T he two Vande Bharat Express trains from Katra Railway Station, flagged off by Prime Minister Narendra Modi on June 6, directly connect the Jammu division with Kashmir. The new service significantly cuts down the travel time between Katra and Srinagar to about three hours, saving two to three hours compared to existing options. The trains are specially designed to operate in the cold climate of the Kashmir Valley. The route also includes passage through the Anji Khad Bridge, India's first cable-stayed railway bridge, and the Chenab Bridge, the world's highest railway arch bridge, standing 359 metres above the river. The 1,315-metre-long steel structure has been engineered to withstand seismic activity and strong winds. The Vande Bharat train service is part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, a 272-kilometre-long corridor constructed at a cost of around Rs 43,780 crore. The project features 36 tunnels spanning 119 kilometres and 943 bridges, enabling all-weather, seamless rail connectivity between the Kashmir Valley and the rest of India. It is expected to revolutionize regional mobility and contribute significantly to socio-economic integration. Expressing his happiness over the train service, Abdullah told news agency ANI, "I am very happy with the train service that has begun. More people will come to receive the darshan of Maa Vaishno Devi, and it will help the tourism as well."

Good news for people going to airport from East Delhi... 8km tunnel to connect Delhi-Meerut Expressway and..., it will reduce travel time by...
Good news for people going to airport from East Delhi... 8km tunnel to connect Delhi-Meerut Expressway and..., it will reduce travel time by...

India.com

time2 hours ago

  • India.com

Good news for people going to airport from East Delhi... 8km tunnel to connect Delhi-Meerut Expressway and..., it will reduce travel time by...

Good news for people going to airport from East Delhi... tunnel to connect Delhi-Meerut Expressway and Gyarah Murti, it is... (Picture for representation purpose) In order to provide relief from traffic jams in Delhi and to reduce the traffic load coming from East Delhi or South Delhi to the Ring Road, Pragati Maidan and Lutyens Zone, the Gyaara Murti (Dandi March Statue) located at the Delhi-Meerut Expressway and Sardar Patel Marg T-junction will be connected by a tunnel of about 7-8 km. New plan for relief from traffic jam At the same time, the proposed elevated corridor from near INA to the airport under Barapullah Phase-4 is another important project. The purpose of the flyover construction is to smoothen the traffic to the airport for commuters from Lutyens Delhi and East Delhi. A few days ago, a high-level meeting was held between Road Transport and Highways Minister Nitin Gadkari and Delhi government ministers. What is the complete plan of the government During this time, the officials of the ministry presented a plan to decongest Delhi through parts of different national highways and new projects . In the future, the government has planned a 128 km long project, on which an estimated expenditure of Rs 23,850 crore is expected. During the meeting, many traffic problems in Delhi were also mentioned, one of which was mentioned in front of the Subroto Park police post near Dhaula Kuan. NHAI has shifted the police post from here and demanded 1300 square meters of land so that a 3-lane wide service lane can be built to go towards Narayana.

IRCTC's Special Offer: Vaishno Devi Trip At Rs 1,700 Per Day, AC Travel And Meals Included
IRCTC's Special Offer: Vaishno Devi Trip At Rs 1,700 Per Day, AC Travel And Meals Included

News18

time3 hours ago

  • News18

IRCTC's Special Offer: Vaishno Devi Trip At Rs 1,700 Per Day, AC Travel And Meals Included

Last Updated: This 4-day, 3-night IRCTC tour from Delhi to Jammu via Rajdhani Express covers travel, stay, local transport, and meals - everything arranged for a hassle-free trip The Indian Railway Catering and Tourism Corporation (IRCTC) has launched an affordable and attractive monsoon travel package for devotees planning a trip to Mata Vaishno Devi. The all-inclusive offer covers AC travel, meals, and a luxurious stay in a five-star hotel — all for as little as Rs 1,700 per day. The journey begins on June 15. This four-day, three-night package includes a round trip from Delhi to Jammu and back via Rajdhani Express. Once booked, travellers don't have to worry about accommodation, local transport, or food as everything is arranged by IRCTC. Budget-Friendly Options Although the train travel will be in Third AC, accommodation costs in Katra will vary based on room-sharing preferences: Triple occupancy: Rs 6,990 Double occupancy: Rs 8,100 Single occupancy: Rs 10,700 Child (5–11 years) with bed: Rs 6,320 Child (5–11 years) without bed: Rs 5,255 Day 2: Arrival in Jammu at 5:00 AM, followed by a vehicle transfer to Katra. Check-in at a five-star hotel (Taj Vivanta or equivalent), enjoy breakfast, then travel by IRCTC-arranged transport to Banganga. From there, devotees can either walk or hire a horse for the uphill climb to the shrine. Return to the hotel by evening for dinner and overnight stay. Day 3: Check-out by 12 noon, then proceed to Jammu by bus. Sightseeing includes visits to Raghunath Temple and Bagh-e-Bahu Garden. In the evening, the bus will drop you at Jammu railway station. With everything planned to perfection, this IRCTC tour is an ideal, hassle-free way to seek blessings at Mata Vaishno Devi while enjoying comfort and convenience at a reasonable cost. First Published: June 11, 2025, 09:01 IST

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store