
Historic bomber returns to Broughton factory for 80th WWII commemorations
A famous WWII aircraft has returned home to her "birthplace", now Airbus' wing building factory in Broughton 80 years on. The Avro Lancaster bomber conducted a number of flypasts over the Broughton site yesterday evening.
It was flown alongside the equally iconic Battle of Britain Memorial Flight (BBMF) Supermarine Spitfire and Hawker Hurricane fighters. It landed at the airfield to a warm welcome from Airbus employees, government officials and community leaders - near an Airbus BelugaXL.
This particular Lancaster, PA474, was built in May 1945 during the Broughton site's early years as a shadow factory for manufacturing Wellington and Lancaster bombers. During this period, the site's legacy of aerospace manufacturing excellence was written by a workforce of Broughton community members ready to meet the challenge of the day. Join the North Wales Live Whatsapp community now
More than half of them were women joining the workforce for the first time. Decades later, the site continues to set the standard for world-class manufacturing, building wings for the Airbus A320, A330 and A350 commercial aircraft families.
In a nod to this proud past and present, the BBMF Lancaster was met by an Airbus BelugaXL, the aircraft used to transport completed wings from Broughton to Airbus' Final Assembly Lines in Europe.
The Lancaster is owned and operated by the RAF's BBMF. It was the star of the recent VE Day celebrations, leading the ceremonial flypast over London.
The Officer Commanding the Battle of Britain Memorial Flight, Squadron Leader Mark Sugden, RAF, said: 'Our flying season so far this year has been memorable with the VE Day celebrations, but this is one of the highlights of the year in a visit that takes our incredible aircraft back to her birthplace.
"Thank you to the whole team at Airbus Broughton for the warm welcome.' Gareth Davies, Airbus' Head of Broughton site, said, 'We are honoured to host the BBMF Lancaster and mark her 80th anniversary as a reminder of the importance of British aerospace history in understanding who we are and where we want to go.
"Our Broughton site has a lot to be proud of, producing the wings that half the world flies on. We're a site that epitomises innovation, advanced manufacturing and a proud workforce who are at the top of their game.
"It's fantastic to be celebrating our heritage with this aircraft.'
The BBMF Lancaster which flew on Friday evening and is called PA474, rolled off the production line at Vickers Armstrong's Broughton (Chester) factory on 31 May 1945. It was one of a contract for 500 aircraft of which only 235 were delivered when production was cancelled in September 1945.
PA474 was built modified for Far East use in preparation for proposed bombing of Japan. But with the end of the war she went directly into storage.
Her later career included photographic reconnaissance, a trials aircraft and appearances in a number of feature films including "Operation Crossbow" and "The Guns of Navarone." She joined the BBMF in 1973.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Reuters
2 hours ago
- Reuters
Ethiopian Airlines considering order for at least 20 regional jets, CEO says
NEW DELHI, June 2 (Reuters) - Ethiopian Airlines is looking to order at least 20 regional or small narrowbody jets as it moves to expand its domestic fleet and replace some ageing aircraft, the airline's chief executive told Reuters on Monday. "We are evaluating three aircraft models, the E-2 from Embraer ( opens new tab, the A220 from Airbus ( opens new tab, and the 737 MAX 7 from Boeing (BA.N), opens new tab," CEO Mesfin Tasew Bekele said in an interview. The final order quantity will depend on the type chosen, he added. Boeing's 737 MAX 7, which has a larger seating capacity and sits at the bottom of a larger category than the Airbus A220 and Embraer E-2, is yet to be certified. Africa's largest carrier is experiencing strong travel demand but has been constrained by jet delivery delays and the grounding of some aircraft due to engine shortages stemming from supply chain disruptions. "We are receiving airplanes from both Boeing and Airbus, but deliveries have been delayed, some by three months, some six months, some more," Bekele said on the sidelines of an annual IATA meeting of global airline leaders. The company is also in talks with lessors to bring onboard some jets to ease capacity constraints. The airline is among several facing grounded aircraft due to bottlenecks in engine maintenance plants. Ethiopian has three Boeing 787 widebody jets grounded due to a shortage of Rolls-Royce (RR.L), opens new tab engines, with five turboprop aircraft grounded due to a shortage of RTX's Pratt & Whitney engines. "Normally engines were supposed to be repaired and returned in three months typically, but now it takes six months or even more to get them repaired and returned," Bekele said.


Reuters
7 hours ago
- Reuters
Flyadeal airline CEO blasts Airbus over 'inexcusable' delivery delays
NEW DELHI, June 2 (Reuters) - The head of Saudi budget carrier flyadeal criticised Airbus' ( opens new tab handling of delays of narrow-body jets and voiced concerns that disruption could spread to freshly ordered wide-body A330neos. CEO Steven Greenway spoke out about delays on the sidelines of an IATA airline industry summit in New Delhi, just weeks after unveiling an order for 10 A330neo long-haul planes. "Delays are becoming inexcusable. Transparency, to be frank, is lacking, and we're getting agitated. How else can we plan? I mean it is just going beyond a joke now," Greenway told Reuters. A non-excusable delay is a term used in aircraft contracts to trigger specific penalties to airlines, but these are rare. Jetmakers have consistently argued that any delays caused by supply chain problems are "excusable," industry sources say. Airbus faces some internal industrial problems, he said. Airbus declined to comment on the narrow-body delays. It has previously reported some improvement in supply chains and has said it is working to soften the impact on customers, while sticking to a target for 820 deliveries this year. Flyadeal is also among several carriers affected by a separate slowdown in arrivals of engines from CFM (GE.N), opens new tab( opens new tab on the Airbus assembly line. "I have got two (narrow-body jets) sitting on the ground in Toulouse at the moment that have been there for a couple of months and I don't have any resolution in sight," Greenway said. "We were meant to have four aircraft in the first half of the year. We've only had two, and even those two were delayed." The sister airline to Saudia is now due to have one A321neo delivered in the third quarter and three in the fourth quarter. "But I'm very three in the last quarter are going to get across the line," he said, adding: "Don't forget, this is delays on top of delays." Safran, which co-owns CFM with GE Aerospace (GE.N), opens new tab, said in April that CFM had seen improvements in supply chains and was poised to recover a slow start to 2025. Greenway's comments reflect mounting private frustration about widespread supply problems among airline CEOs gathering for their annual industry meeting. He acknowledged that aerospace had been hit by a broad exodus of labour from the manufacturing sector after COVID-19, but added: "I do think it's inexcusable that here we are three, four years later, and we still haven't got over that hump." Reuters reported last week that Airbus had warned airlines a pattern of delays would persist for another three years. Lessors have spoken of supply tensions for the rest of the decade. Greenway raised concerns that similar problems could spread to the wide-body A330neo, after flyadeal unveiled an order for 10 of the upgraded long-haul jets in April. So far there have been no reports of delivery delays to the aircraft. "Our (first) aircraft was meant to be on the final production line in December of next year. I don't know if we're going to see that or not," he said. Airbus said it was not aware of any A330neo delays. Airlines say delays disrupt decisions that must be taken well ahead like pilot and crew training and adding routes. "You can't you take the wide-bodies, I'm now assuming there is going to be a delay. I'm having to go out and work with wet-lease operators to plug that gap," Greenway said, referring to rentals of planes with crews. Philippine budget airline Cebu Pacific said last week it would wet-lease two crewed A320s to flyadeal during its lean months in July and August, a busy period for the Saudi carrier.


Reuters
a day ago
- Reuters
IATA expects sustainable aviation fuel production to double in 2025
SEOUL, June 1 (Reuters) - The International Air Transport Association said on Sunday it expects the amount of sustainable aviation fuel produced to double in 2025 to reach 2 million tonnes, representing 0.7% of airlines' fuel consumption. Influential industry body IATA has increasingly been warning that airlines will struggle to meet their sustainability goals, and has described the production of SAF - which is more expensive than conventional jet fuel - as disappointingly slow. IATA Director General Willie Walsh said that while the production increase was encouraging, the relatively small amount will add $4.4 billion globally to aviation's fuel bill. "The pace of progress in ramping up production and gaining efficiencies to reduce costs must accelerate," Walsh said in a statement. The broader aviation sector agreed in 2021 to target net-zero emissions in 2050 based mainly on a gradual switch to SAF, which is made from waste oil and biomass. Airlines are at odds with energy companies over scarce supplies of SAF, while also pointing the finger at plane makers Airbus ( opens new tab and Boeing (BA.N), opens new tab over delays in delivering more fuel-efficient jets.