logo
Thiruverumbur wards to get direct drinking water supply soon

Thiruverumbur wards to get direct drinking water supply soon

Time of India22-05-2025

1
2
Cleared/260 Words
Trichy: Nearly 10 years after a proposal to develop a separate drinking water supply scheme for added areas in Thiruverumbur in Trichy city was mooted, Trichy corporation conducted trial runs at the collector well to source drinking water for the project.
Thiruverumbur water supply improvement scheme (WSIS) will source drinking water from the Cauvery river to provide piped water connections to added wards in Thiruverumbur.
Proposed at 63.7 crore, Thiruverumbur WSIS mooted in 2016 has finally received a collector well near Kambarasampettai on the Cauvery river bank. For the past few days, corporation has been conducting trial runs to ascertain the quality of groundwater from the Cauvery riverbed.
"We will commission the drinking water project as early as possible. Unclear water sourced from the riverbed is being discharged back to the river. Overhead water tanks and installation of drinking water pipelines for the project were already completed," a senior corporation official said.
The collector well has the capacity to draw 27 million litres of water per day (MLD). Pipelines connecting the well were installed under trenchless methods without damaging the roads, officials added.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Ukraine: Unsold Sofas at Bargain Prices (View Current Prices)
Sofas | Search Ads
Search Now
Undo
Through the new pumping station, the water will be supplied to six peripheral wards 38 to 43.
Around 90,000 people in 18,000 households and commercial properties would get piped drinking water connections through the project. Thiruverumbur WSIS shall benefit erstwhile Thiruverumbur town panchayat and Pappakurichi, Ellakudi, Keela Kalkandarkottai, and Alathur village areas that were amalgamated with Trichy city in 2011. Officials said that opposition from a section of Srirangam residents and the Covid-19 pandemic had delayed the project's progress.
Thiruverumbur WSIS to progress:
Cost: Rs63.7 crore
Estimated water connections: 18,000
Beneficiary population: 90,000
Overhead water tanks: 9
Length of pipelines: 205km

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Recounting Velpur's story in ending child labour
Recounting Velpur's story in ending child labour

The Hindu

time2 hours ago

  • The Hindu

Recounting Velpur's story in ending child labour

Every year, June 12 is observed as World Day Against Child Labor (WDACL) under the auspices of the International Labour Organization (ILO). In an attempt to draw the attention of the world on the issue of child labour, the day brings together governments, employers and workers' organisations as well as civil society to work towards ending child labour. Though Sustainable Development Goal Target 8.7 calls on the global community to take effective measures to end child labour in all its forms by 2025, we are far from achieving this. Child labour is prevalent all over the world, robbing many children of their basic right to live with dignity, enjoy their childhood and attain their full development potential. Across the world, 160 million children are estimated to be involved in child labour — which is almost one among 10 children. The Africa, Asia and the Pacific regions together account for almost nine out of every 10 children being in child labour. The COVID-19 pandemic exacerbated the situation for many underprivileged children, when their schools closed, and their parents lost their jobs/wages. Many children who dropped out of school, and who were forced to work to supplement their family income, have not returned to school. The extent of child labour in India India has a significant incidence of child labour. Census 2011 estimated that 43.53 lakh children in the age group of five to 14 were involved in child labour due to factors such as poverty, non-accessibility and illiteracy. Child labour is preferred in beedi, carpet-weaving and firework factories. India enacted the Child Labour (Prohibition and Regulation) Act (CLPRA) in 1986, while the National Policy on Child Labour, 1987 sought to adopt a gradual and sequential approach with a focus on rehabilitation. Its action plan included strict enforcement of the CLPRA and implementation of the National Child Labour Project (NCLP) in areas where there is a high incidence of child labour. The CLPRA was replaced with the Child Labour (Prohibition and Regulation) Amendment Act, 2016, which prohibited the employment of children below 14 and had provisions for the prohibition on employment of adolescents (14-18 years) in scheduled hazardous occupations. The Right to Education now mandates that the state shall provide free and compulsory education to all children in the age group six to 14 years. Most drives against child labour have been effective but only for a short time. There are several instances of children who were engaged earlier in labour and who dropped out of school returning to their workplace. But there is a success story. The Velpur model Velpur Mandal (tehsil) of Nizamabad district in erstwhile Andhra Pradesh (now Telangana), was once notorious for child labour. But in a dramatic way it became a rare exception of shunning child labour due to the total control, the commitment and the involvement of the local community. In June 2001, a drive involving the community was started in Velpur to ensure that all children in the age group of five to 15 years went to school and that no child would be engaged as labour in any form. After a sustained campaign for about 100 days, Velpur was declared to be a 'child labour free mandal', on October 2, 2001. Twenty-four years later, there is 100% retention in schools and no child labour in a mandal once notorious for it. The campaign to identify and track every out-of-school child and enrol them in schools was initially led by a committed set of officials. But the fact is that there was large-scale resistance in the beginning. Canards were spread that the teams moving in villages were part of a nationwide racket to kidnap children and sell their organs such as kidneys and eyes. Hotels refused to serve even tea, with those in hotels making sarcastic remarks that all their servers had joined school. But after persistent efforts and discussions with the people, the tide began to turn. People began to cooperate and even transformed it as their movement. Children who were seen in work places were sent to bridge schools under the NCLP. Public meetings emphasised the necessity of education and the need for children to go to school. In these meetings, children recognised their (former) employers who let them stop work and go to school. Under peer pressure, former employers also made a public announcement of writing off the balance amount (principal, the interest and penal interest) owed to them by the parents who took hand loans from them (the children were used as mortgage and as child labour till the amount was repaid). They even distributed school stationery to the children. A study found that a total amount of about ₹35 lakh was written off — the price for a good cause. All sarpanchs signed a memorandum of understanding (as in the provisions of the Andhra Pradesh Compulsory Primary Education Rules, 1982), with the government (district education officer in the presence of the District Collector) to ensure that all children in the five to 14 age group in their village were sent to school. The government in turn undertook to provide access, infrastructure and teachers. This was the first time that such an agreement had been signed between sarpanchs and the government. There is no child labour — an achievement that is very zealously guarded by the community. To cherish this proud achievement of being the first mandal in the State to be declared child labour free and to remind them of their commitment to sustain it, villagers erected boards in every village with the words, 'There is no child labour in our village'. On October 8, 2021, as a part of the 'Azadi ka Amruth Mahotsav', the V.V. Giri National Labour Institute, (VVGNLI) Noida, Uttar Pradesh (under the Ministry of Labor and Employment, Government of India) organised a programme in Nizamabad. The event was to celebrate 20 years of successful intervention 'to eliminate child labour and the declaration of Veilpur Mandal, as Child labour free'. All sarpanchs, caste elders, zilla parishad members and people involved in the campaign were honoured for their role in sustaining it. The challenge made to the local media to identify at least one child who was not in school had no takers. A leading news magazine had an exclusive report on this event. The Velpur story is well documented and has been appreciated by the ILO and the media. Velpur has been visited by many experts in the fields of education and child labour. The former President of India, A.P.J. Abdul Kalam, and members of the National Human Rights Commission India sent letters of appreciation. The Velpur model, where there was the complete participation of the community in sustaining the fight against child labour, is an integral part of all training programmes that are organised by the VVGNLI. Made aware of its sustained success, the Parliamentary Standing Committee on Labour, Textiles and Skill Development asked the then District Collector, who led this campaign, to make a presentation before it on November 24, 2022. The Parliamentary Standing Committee appreciated and acknowledged its success. What is vital This is a community-led success story that is testimony of the axiom that social issues can be successfully and sustainably addressed only if they metamorphose into a people's movement. It is a proud moment for this writer to have been associated with it. He was the Collector of Nizamabad district, when this drive against child labour was taken up in Velpur in 2001. Asok Kumar G. is a former Indian Administrative Service (IAS) officer, and is currently a senior faculty member in the Centre for Policy Research

Gujarat's tree cover records 17% decline over six years
Gujarat's tree cover records 17% decline over six years

Time of India

time2 hours ago

  • Time of India

Gujarat's tree cover records 17% decline over six years

Ahmedabad: Gujarat's tree cover has recorded a stark 17% decline over six years, falling from 8,034sq km in 2015-16 to 6,632sq km in 2021-22, in sharp contrast to other industrialised states, most of which reported substantial gains in the same period. According to data presented in a Ministry of Statistics and Programme Implementation (MOSPI) report, Maharashtra led the growth with a 47.7% growth in tree cover — from 9,831sq km to 14,525sq km. Andhra Pradesh recorded a 42.3% expansion, Karnataka recorded a 36.1% increase, while Telangana, Haryana and Tamil Nadu saw their tree cover grow by 31.8%, 19.6% and 15% respectively. All these states have substantially industrialised. A senior forest official from Gujarat revealed the state's tree cover has experienced a long-term decline — shrinking from 8,358sq km in 2013 to 6,632.29 sq km, as per the latest Forest Survey of India (FSI) 2023 report, marking a 20.65% decrease over seven years. "The steepest fall came between 2019 and 2021 when the cover shrunk from 6,912sq km to 5,489sq km, largely due to diversion of reserve forests and open lands for industrial projects, including solar power," the official said. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 5 Books Warren Buffett Wants You to Read In 2025 Blinkist: Warren Buffett's Reading List Undo Even as the overall forest cover in Gujarat declined, the situation improved since 2021, according to forest officials. "We registered the highest increase in tree cover in the FSI 2023 report compared to the FSI 2021 report. Gujarat's tree cover currently stands at 3.38% of its geographical area, up from 2.8% earlier," said A P Singh, principal chief conservator of forests. In fact, Ahmedabad City, he added, has been the biggest loser of green cover among major cities in Gujarat since 2011. Environment experts blame it on rapid urbanisation and industrialisation. Environmentalists attribute the loss to rapid urbanisation and unchecked industrial growth. "The pace of industrialisation in Gujarat has been extremely rapid in recent years," said Mahesh Pandya, environmental engineer and director of Paryavaran Mitra. "As a result, forest land was often diverted for industrial use. Replantation and greening efforts haven't kept up with the pace of loss. Though we saw some recovery from 2021 to 2023, earlier gaps caused lasting depletion. What is urgently needed is focused, long-term intervention from the govt, complemented by community participation." Pandya also flagged future risks tied to ecological degradation. "Our mangrove belts are not dense enough to provide strong natural barriers. While survival rates of plantations improved, earlier negligence left coastal areas vulnerable. In the event of cyclones, the impact on the land side could be severe, with increased risk of salinity ingress," he warned. Environmental experts say Gujarat must urgently adopt a more decentralised and sustained greening approach to address climate vulnerabilities and ecological loss.

Experts flag indiscriminate vegetation removal along Vishwamitri
Experts flag indiscriminate vegetation removal along Vishwamitri

Time of India

time3 hours ago

  • Time of India

Experts flag indiscriminate vegetation removal along Vishwamitri

Vadodara: The group of experts appointed by the Gujarat State Human Rights Commission (GSHRC) to monitor the Vishwamitri river project has raised concerns over the indiscriminate removal of vegetation along the riverbanks. The group also noted that a comprehensive plantation plan for the river is yet to be developed. In its recent report submitted to the commission, the committee shared observations based on field visits, meetings with officials, and information provided by the Vadodara Municipal Corporation (VMC) and other stakeholders. The report highlighted issues related to vegetation loss and riverbank stabilisation. It pointed out that vegetation had been unnecessarily removed from several areas along the riverbanks, even where there were no signs of debris or solid waste. This removal has resulted in steep to vertical slopes, making the banks vulnerable to erosion during the monsoon season. The report further noted that the clearing was carried out despite prior recommendations against disturbing such areas. A supplementary report later submitted by the group emphasized that several stretches on the eastern banks of the river had healthy vegetation and no visible debris. It recommended that these areas should remain untouched. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Switch to UnionBank Rewards Card UnionBank Credit Card Apply Now Undo At the same time, the report called for the systematic removal of invasive plant species along the river. The experts also noted the ecological importance of emergent and floating vegetation in the river, particularly for crocodile hatchlings. They advised that such vegetation should not be removed. The report added that biodiversity-rich islands have emerged in the river as a result of ongoing work and should be preserved. A high-level committee appointed by the state govt for flood mitigation in the city had earlier suggested initiating plantation efforts along the river. The GSHRC-appointed group echoed this recommendation but pointed out that, despite repeated suggestions, a scientifically designed plantation plan has yet to be prepared. The report recommended engaging an ecological consultant to develop, implement, and monitor such a plan in a systematic and scientific manner.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store