
Amid opposition, GCC advances Solid Waste Processing Facility project at Kodungaiyur
In spite of great public opposition to its proposal, the Greater Chennai Corporation (GCC) has moved forward with its ₹1,268.38 crore plan to establish an Integrated Solid Waste Processing Facility (IWPF) near the dump yard at Kodungaiyur.
The civic body has initiated the process to appoint an independent engineer (IE) to supervise the implementation of the project. This was after a tender worth ₹8.53 crore in this regard was floated recently. The engineer will oversee not only the IWPF but also related infrastructure at the dump yard.
The engineer will be responsible for supervising construction of the IWPF, reviewing claims, certifying payments, monitoring key performance indicators, and inspecting the condition of project facilities. All communication with the private firm involved in the project will be routed through the Corporation, according to the GCC.
The IE is also required to conduct periodic inspections, and submit compliance reports during both the construction and operational phases
The appointment will cover a three-year term, including the construction period and part of the operations phase, with scope for extension.
Phase-wise construction planned
The IWPF project in Kodungaiyur comprises four core infrastructure components: a waste-to-energy (WtE) power plant, an automated material recovery facility (MRF), a composting unit, and a bio-CNG plant. The WtE and MRF facilities account for ₹1,026.41 crore of the total cost, while the composting and bio-CNG units are estimated at ₹142.97 crore and ₹99 crore, respectively. The capital investment for Phase I stands at ₹853.20 crore, with Phase II projected at ₹415.18 crore.
Processed waste will be handled at the site, with transportation of residual matter to a designated sanitary landfill.
Notably, a demonstration against the Waste-to-Energy component of this project was held, headed by the Federation of North Chennai Residents' Welfare Associations, from Sivasakthi Amman temple in Ezhil Nagar of Kodungaiyur on May 25.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Hindu
9 hours ago
- The Hindu
For ₹7.5 crore, Greater Chennai Corporation hires eyes to check if over 3,000 roads are relaid right
The Greater Chennai Corporation (GCC) is planning to re-engage quality controllers for monitoring the work of over 3,000 roads proposed to be relaid under various schemes across the 15 zones of the city. The six-month project, valued at ₹7.5 crore, will be executed in 16 packages under the Project Management Consultancy plan. Roads are to be relaid under 106 packages, according to an official in the Bus Route Roads Department. The consultants would be tasked with monitoring works, right from the planning and scheduling phases through to the final bill submission for relaying interior roads, bus route roads, bituminous (BT), cement concrete (CC), and interlocking pavers (ILP), according to GCC. Previously, the monitoring work was handled by local engineers of GCC. Their responsibilities include scrutinising, reviewing, and approving project execution plans, work programmes, and method statements, as well as reviewing and approving shop drawings and fabrication drawings. 'Daily inspections are mandatory for construction activities at central mixing plants and at actual work sites to ensure adherence to standards. Quality control tests will be conducted at each stage of construction, both at the central mixing plant and on-site. The operational condition of the contractors' machinery, including hot mix plants, and confirming the validity of their fitness and calibration certificates, will also be checked. Further, levelling checks before and after milling operations, as well as during profile correction will be done by the firm,' GCC official said. 'Upon relaying or construction work completion, the appointed consultants are responsible for conducting final tests and subsequently issuing either completion or provisional certificates. Also, the consultants need to ensure the accurate physical measurement of roads post-execution, furnish certified copies, and diligently enter all progress details into the GCC's Enterprise Resource Planning (ERP) system, a software to enter all progress details related to the road infrastructure projects,' the official added. The PMC services also involve assisting the GCC in procuring estimates from utility providers, aiding in dispute resolution, and offering guidance on relevant clauses of codes and practices. All test reports and field inspection reports are to be submitted in duplicate to the Bus Route Roads Department, according to GCC.


The Print
9 hours ago
- The Print
Good news very soon on India-Oman trade agreement: Goyal
The talks for the agreement, officially dubbed as the Comprehensive Economic Partnership Agreement (CEPA), formally began in November 2023. The negotiations received a much-needed impetus after the visit of Goyal to Muscat in January this year. Paris, Jun 2 (PTI) Commerce and Industry Minister Piyush Goyal has said that negotiations between India and Oman for the proposed free trade agreement (FTA) are progressing, and some 'good news' may come 'very soon' on that. 'I think you will see some good news very soon on the Oman FTA,' the minister told reporters here when asked whether the FTA talks with Oman can be concluded this year. Goyal is here on an official visit to hold talks with French leaders and businesses to boost trade and investments. He will also attend a mini-ministerial meeting of the World Trade Organization (WTO) on June 3. In such agreements, two trading partners either significantly reduce or eliminate customs duties on a maximum number of goods traded between them. They also ease norms to promote trade in services and attract investments. Oman is the third-largest export destination among the Gulf Cooperation Council (GCC) countries for India. India already has a similar agreement with another GCC member UAE which came into effect in May 2022. The bilateral trade was about USD 10.5 billion (exports USD 4 billion and imports USD 6.54 billion) in 2024-25. India's key imports are petroleum products and urea. These account for over 70 per cent of imports. Other key products are propylene and ethylene polymers, pet coke, gypsum, chemicals, and iron and steel. Taking about such agreements, the minister said these FTAs not just promote trade in goods and services, but also strengthen supply chain, bring confidence in businesses of both sides about stable polices, and predictability. 'So in a way, it's a big message when you conclude an FTA,' he added. When asked if India could see further domestic reforms as a result of these agreements, the minister said FTA stands on their own footing and have no relationship to 'our own' domestic efforts to make the country more attractive. 'These agreements are more towards opening markets on both sides which lead to greater competitiveness, improved productivity and efficiency in all processes,' he said. Goyal said the National Manufacturing Mission, announced in the Budget, may come up soon. It will further bring an 'orderly shape' to how states and the Centre work together in the direction of promoting manufacturing in India, he added. PTI RR ANU ANU This report is auto-generated from PTI news service. ThePrint holds no responsibility for its content.


The Hindu
11 hours ago
- The Hindu
Trial run of modern abattoir to begin on environment day in Thiruvananthapuram
A step towards addressing the issues of illegal slaughtering and dumping of meat waste in the capital city will be made on this World Environment Day, on Thursday, as the Thiruvananthapuram city Corporation begins the trial run of the modern abattoir at Kunnukuzhy. The major infrastructural work of the slaughterhouse has now been completed with only some painting works and landscaping remaining. Meanwhile, the civic body on Friday floated a tender calling for contract bids from professional firms for operation and maintenance and overall management of the modern abattoir. The selected agency will be required to utilise the mechanised system of slaughtering and handling of meat carcasses to make available hygienically slaughtered wholesome meat to the local population as per the slaughter charges to be fixed by the bidder in the bid. The plant, built at a cost of ₹15 crore, has a capacity to handle 75 larger animals and 50 small animals per day. It will also have a capacity to hold 75 livestock. The solid waste will be treated at site using a biogas plant. The rendering plant will be used to process the non edible soft tissues and bones. The byproduct from the effluent treatment plant will be supplied to industries involved in the manufacture of animal food. Remaining fine solids and wash water from the slaughterhouse will go to an effluent treatment plant. Trial run The trial run will be done using materials of weight equivalent to live animals to check the proper functioning of the different units of the abattoir. After the trial run, the plant is expected to be fully functional by the end of the month. The Corporation will stop all illegal slaughter in its limit from the date of starting of the modern slaughterhouse. No meat without a seal of the corporation will be allowed to be sold in the meat stalls within the city. The civic body will register all the meat stall owners/butchers in the corporation and will provide approval for bringing animals to the slaughterhouse for custom slaughter. The Kerala Electrical and Allied Engineering Company Limited (KEL) is the implementing agency for the project. The project to set up a modern slaughterhouse at Kunnukuzhy has now become a long-running story stretching for eleven years, during which many proposals were dropped even before implementation began. The Kunnukuzhy slaughterhouse was closed in February 2013, as it failed to manage the waste generated in a scientific way in the absence of a centralised waste treatment plant. The Pollution Control Board ordered its closure for non-compliance in setting up plants to treat slaughter waste.