
Precautionary Evacuation Advised For Spring Creek Tomorrow Morning
An Orange Heavy Rain Warning was issued by MetService New Zealand earlier today for Marlborough, running from 9am Thursday 26 June to 6pm Friday 27 June.
The region is expecting significant rainfall especially about the ranges. Peak rates of 20 to 30 mm/h or more, expected from Thursday late afternoon. There is still uncertainty about the duration of this event and a moderate chance of it being upgraded to a Red Warning. Streams and rivers may rise rapidly. Surface flooding, slips, and difficult driving conditions are likely.
Marlborough Emergency Management Controller Richard MacNamara said it was a dynamic event.
'All of Marlborough's emergency and lifelines agencies are up to speed and our response teams are ready to go.'
'While the rain forecast remains somewhat uncertain, the weather system does have the potential to stall and deliver additional rainfall on Friday.'
'With the Wairau River stop bank at Spring Creek in a compromised state*, we are taking the precaution of advising residents of Spring Creek township to plan to evacuate their homes from 6am Friday, tomorrow morning. They can leave this evening if they wish but the key time when the river may be running high is from early tomorrow morning.'
'Spring Creek residents are asked to stay with family or friends - have a grab bag ready and take pets and prescription medications with them.'
The affected streets in Spring Creek are Dodson, Hathaway and March streets, and part of Ferry Road. Further updates will be provided, primarily through Marlborough District Council's Facebook page and the Antenno alerting app.
Keep an eye on MetService for watch and warning updates at www.metservice.com/warnings/home
NZ Transport Agency are urging drivers to be ready for bad weather driving conditions on the region's roads. Read the latest update at: www.journeys.nzta.govt.nz/traffic-bulletins/wet-and-windy-weather-on-the-way-for-top-of-the-south-drivers
Remember, it is always important to be prepared. For further information on emergency preparedness go to: https://getready.govt.nz/emergency/floods
*Spring Creek stop bank at Peninsula Road - background information
During the 2016 Kaikoura earthquake, the stopbank experienced lateral spread, which was masked by road seal on Peninsula Road. The July 2021 Wairau flood further weakened its resilience and emphasised the need for a capital upgrade to maintain the current level of service, providing one in a 100-year flood protection.
In January 2023, the Peninsula Road Stopbank project was reprioritised, and preliminary investigation works began. Funding was secured through the Long-term Plan process, with geotechnical investigations starting in May 2024, followed by initial design work.
A $8.7M construction programme was agreed with the community in May last year, which includes $3.6M funding from Central Government. The project involves significant groundwork, which will commence in November 2025. During this period, rock and materials will be stockpiled near the site, temporary infrastructure like haul roads will be built, and other preparations made. This will help us maximise the construction window in November 2026.
The Council has worked with the community to secure co-investment from central government for this project successfully. As the final design and construction approach near completion, Council plans to present a comprehensive update from its design team and contractor in early August 2025.
The community's welfare and safety remain paramount during this period and are a constant consideration during flood events and planning.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Otago Daily Times
an hour ago
- Otago Daily Times
Snow-hit highways in Otago open, but care needed
All state highways in Otago have reopened after heavy snow, but motorists are advised to take care amid more snow and rain warnings. Check state highways here A low off the South Island east coast was expected to bring heavy rain to the lower South Island and more snow to inland parts of Otago and Southland on Saturday, MetService says. A heavy snow watch remains in place for Central Otago, Southland north of Lumsden, also inland Dunedin and Clutha from 9am until 7pm today. Periods of heavy snow were expected above 400 metres, where snowfall amounts may approach warning criteria. A heavy rain watch was also in place for Southland about and east of Mossburn from 9am until 3pm today. Periods of heavy rain were expected and amounts may approach warning criteria. There were ice warnings at Middlemarch and Outram, near Dunedin. The NZ Transport Agency/Waka Kotahi said crews had working hard to reopen state highways following heavy snow. State Highway 85 from Omakau to Kyeburn had reopened by 10.15am The Lindis Pass (State Highway 8) from Tarras to Omarama was the next to open by 11am, followed by SH87 from Middlemarch to Kyeburn and SH85 from Kyeburn to Palmerston by 11.20am. A spokeswoman for Southern police said motorists should drive to conditions and allow for extra time on their journey. "Reducing speed, using headlights and windscreen wipers, and wearing seatbelts will also ensure a safe trip. Our roads are unforgiving and less predictable in our icy winter conditions, please drive with caution." In Central Otago, thick snow and ice was affecting roads in the Manuherekia and Maniototo areas, and caution was advised if using them, a spokeswoman for the district council said. By 10am the Ida Valley Omakua Road had reopened. However, rain and snow flurries were continuing and isolated areas of flooding were to be expected throughout Central Otago, she said. The Danseys Pass Road was closed from the gates past the Danseys Pass hotel. Heavy snow was affecting the Crown Range, linking Queenstown and Wānaka this morning, and chains are needed if using the alpine pass. A snow warning was also in place for Southland's Milford Rad (SH94). Ski fields near Wānaka have been blanketed, with Cardona Alpine Resort reporting 29cm of fresh snow overnight and more expected throughout the day. "The forecast has snow continuing throughout the morning and snow flurries over the day. Lifts will be delayed opening. Our teams are out assessing conditions, and we will open terrain as soon as its safe." At Treble Cone, 25cm had fallen in time for the ski field's opening day today. "Triple Treat groomed flat with fresh snow on top and we aim to open Upper Main Street and Big Skite pending patrol setup. Take care if venturing off-trail as this snow is thin. Cafe will be cranking with live DJs this afternoon." Drivers were advised chains were needed at both ski fields. Meanwhile, flood repair works are scheduled for SH1 near Hampden in North Otago and SH8 near Lawrence and Beaumont. Stop and go traffic controls may be in place, RNZ reported. Snow warnings for alpine roads LINDIS PASS (SH8)From midnight on Friday until 9pm on Saturday Snow is forecast to lower to 600 metres, and 3cm to 6cm of snow may settle on the road near the summit with lesser amounts to 600 metres.


Otago Daily Times
an hour ago
- Otago Daily Times
Highways in South reopening but care urged
Some state highways in Otago reopening after heavy snow, but motorists are still advised to take care amid more snow and rain warnings. Check state highways here A low off the South Island east coast was expected to bring heavy rain to the lower South Island and more snow to inland parts of Otago and Southland on Saturday, MetService says. A heavy snow watch remains in place for Central Otago, Southland north of Lumsden, also inland Dunedin and Clutha from 9am until 7pm today. Periods of heavy snow were expected above 400 metres, where snowfall amounts may approach warning criteria. A heavy rain watch was also in place for Southland about and east of Mossburn from 9am until 3pm today. Periods of heavy rain were expected and amounts may approach warning criteria. Southern police are advising motorists to be aware of road closures and to take caution when driving today. The NZ Transport Agency/ Waka Kotahi said crews were working hard to reopen state highways. Heavy snow had closed the Lindis Pass (State Highway 8) from Tarras to Omarama, but the road was open by 11am. SH85 from Omakau to Kyeburn had reopened by 10.15am. However, SH87 from Middlemarch to Kyeburn and SH85 from Kyeburn to Palmerston remained closed. A police spokeswoman said motorists should limit themselves to essential travel only and allow for extra time on their journey. "Reducing speed, using headlights and windscreen wipers, and wearing seatbelts will also ensure a safe trip. Our roads are unforgiving and less predictable in our icy winter conditions, please drive with caution." In Central Otago, thick snow and ice was affecting roads in the Manuherekia and Maniototo areas, and caution was advised if using them, a spokeswoman for the district council said. By 10am the Ida Valley Omakua Road had reopened. However, rain and snow flurries were continuing and isolated areas of flooding were to be expected throughout Central Otago, she said. The Danseys Pass Road was closed from the gates past the Danseys Pass hotel. Heavy snow was affecting the Crown Range, linking Queenstown and Wānaka this morning, and a snow warning was also in place for Southland's Milford Rad (SH94). There were ice warnings at Middlemarch and Outram, near Dunedin. Ski fields near Wānaka have been blanketed, with Cardona Alpine Resort reporting 29cm of fresh snow overnight and more expected throughout the day. "The forecast has snow continuing throughout the morning and snow flurries over the day. Lifts will be delayed opening. Our teams are out assessing conditions, and we will open terrain as soon as its safe." At Treble Cone, 25cm had fallen in time for the ski field's opening day today. "Triple Treat groomed flat with fresh snow on top and we aim to open Upper Main Street and Big Skite pending patrol setup. Take care if venturing off-trail as this snow is thin. Cafe will be cranking with live DJs this afternoon." Drivers were advised chains were needed at both ski fields. Meanwhile, flood repair works are scheduled for SH1 near Hampden in North Otago and SH8 near Lawrence and Beaumont. Stop and go traffic controls may be in place, RNZ reported. Snow warnings for alpine roads LINDIS PASS (SH8)From midnight on Friday until 9pm on Saturday Snow is forecast to lower to 600 metres, and 3cm to 6cm of snow may settle on the road near the summit with lesser amounts to 600 metres.


Otago Daily Times
an hour ago
- Otago Daily Times
Snow-hit highways reopening, but care needed
Some state highways in Otago reopening after heavy snow, but motorists are still advised to take care amid more snow and rain warnings. Check state highways here A low off the South Island east coast was expected to bring heavy rain to the lower South Island and more snow to inland parts of Otago and Southland on Saturday, MetService says. A heavy snow watch remains in place for Central Otago, Southland north of Lumsden, also inland Dunedin and Clutha from 9am until 7pm today. Periods of heavy snow were expected above 400 metres, where snowfall amounts may approach warning criteria. A heavy rain watch was also in place for Southland about and east of Mossburn from 9am until 3pm today. Periods of heavy rain were expected and amounts may approach warning criteria. Southern police are advising motorists to be aware of road closures and to take caution when driving today. The NZ Transport Agency/ Waka Kotahi said crews were working hard to reopen state highways. Heavy snow had closed the Lindis Pass (State Highway 8) from Tarras to Omarama, but the road was open by 11am. SH85 from Omakau to Kyeburn had reopened by 10.15am. However, SH87 from Middlemarch to Kyeburn and SH85 from Kyeburn to Palmerston remained closed. A police spokeswoman said motorists should limit themselves to essential travel only and allow for extra time on their journey. "Reducing speed, using headlights and windscreen wipers, and wearing seatbelts will also ensure a safe trip. Our roads are unforgiving and less predictable in our icy winter conditions, please drive with caution." In Central Otago, thick snow and ice was affecting roads in the Manuherekia and Maniototo areas, and caution was advised if using them, a spokeswoman for the district council said. By 10am the Ida Valley Omakua Road had reopened. However, rain and snow flurries were continuing and isolated areas of flooding were to be expected throughout Central Otago, she said. The Danseys Pass Road was closed from the gates past the Danseys Pass hotel. Heavy snow was affecting the Crown Range, linking Queenstown and Wānaka this morning, and a snow warning was also in place for Southland's Milford Rad (SH94). There were ice warnings at Middlemarch and Outram, near Dunedin. Ski fields near Wānaka have been blanketed, with Cardona Alpine Resort reporting 29cm of fresh snow overnight and more expected throughout the day. "The forecast has snow continuing throughout the morning and snow flurries over the day. Lifts will be delayed opening. Our teams are out assessing conditions, and we will open terrain as soon as its safe." At Treble Cone, 25cm had fallen in time for the ski field's opening day today. "Triple Treat groomed flat with fresh snow on top and we aim to open Upper Main Street and Big Skite pending patrol setup. Take care if venturing off-trail as this snow is thin. Cafe will be cranking with live DJs this afternoon." Drivers were advised chains were needed at both ski fields. Meanwhile, flood repair works are scheduled for SH1 near Hampden in North Otago and SH8 near Lawrence and Beaumont. Stop and go traffic controls may be in place, RNZ reported. Snow warnings for alpine roads LINDIS PASS (SH8)From midnight on Friday until 9pm on Saturday Snow is forecast to lower to 600 metres, and 3cm to 6cm of snow may settle on the road near the summit with lesser amounts to 600 metres.