Gulf Coast State College introduces new hospitality scholarships
PANAMA CITY, Fla. (WMBB) – Gulf Coast State College (GCSC) launches two new scholarships through its Hilton Hospitality Management and Tourism Program.
GCSC officials said the college plans to use these scholarships to ease students' journeys into one of the most people-centered industries: hospitality.
'Hospitality is a huge industry with local and global potential. We want to help more students see it as a real career option, and give them the support to get started,' Katherine Griffin Boatwright Endowed Chair for Hospitality Management & Tourism at GCSC, Paul Bonnette, said.
Students can qualify in two ways. The Hospitality Rockstars Scholarship is for high school graduates pursuing a degree in hospitality, and the Hospitality Heroes Scholarship is for current hospitality workers or GCSC students building on their experience.
Each scholarship offers $500 per semester, gifted from Ms. Julie Hilton and the Hilton family, to help with tuition costs. They require six credit hours a semester for eligibility.
These awards can be used alongside other financial aid, such as the Gulf Coast Guarantee and other scholarships.
Click here to learn more.
Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
6 hours ago
- Yahoo
Walton County to break ground on Driftwood Road
WALTON COUNTY, Fla. (WMBB) – The Walton County Board of County Commissioners and the Walton County Beach Operations and Tourism Departments plan to break ground on the Driftwood Road Municipal Parking facility. According to a news release, the construction will begin Monday, June 16, on 76 Driftwood Road in Miramar Beach at 9 a.m. U.S. 231 Road Improvement Project to begin in Bay County Walton County's need for public beach access, rest areas and transit stops led to the project approval from the BCC. The Driftwood Road Municipal Parking facility will include 67 parking spaces with dedicated ADA, LSV and bicycle parking. Four of the parking spots will also include electric vehicle charging stations. Officials say the construction of the 1.119-acre lot will take approximately 11 months. For visitors, the public transit stop will have air-conditioning as well as a restroom facility for convenience. The Tourist Development Tax, a 5% tax collected on short-term rentals in south Walton County, funds this development. For more information and project updates, click here. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Yahoo
10 hours ago
- Yahoo
U.S. 231 Road Improvement Project to begin in Bay County
BAY COUNTY, Fla. (WMBB) – The Florida Department of Transportation will begin an intersection improvement project later this summer at U.S. 231 at Pipeline Road in Bay County. According to a news release, the project will cost $2.6 million and will cause lane closures and traffic shifts. Lane closures will not occur during peak travel times of 7 a.m. to 9 a.m. or 3:30 p.m. to 7:30 p.m.; until Labor Day, lane closures will be limited to Sunday through Thursday between 8 p.m. and 6 a.m. Bay County OKs FDOT grant for road resurfacing and other improvements The project includes the installation of new mast arm traffic signals, as well as new signing and pavement markings. Pipeline Road will be widened to include new left turn lanes for accessing U.S. 231, and crews will be removing the median and realigning the intersection; they will also be milling and resurfacing the pavement. Enhancements will be made to stormwater management to include the installation of concrete curbs and gutters as well as a closed pipe drainage system. Completion of the construction is scheduled for mid-2026. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Yahoo
3 days ago
- Yahoo
Rural community of Alford benefits from innovative grant system
JACKSON COUNTY, Fla. (WMBB) – Through the rebuild from Hurricane Michael, the town of Alford has faced an issue shared among rural communities: a lack of funds. However, a new opportunity is allowing Alford to put about $32 million in grant money to good use. 'In the past, when you received a federal grant or a state grant, you, as a city, had to borrow the money from a bank or lending firm to complete the work and then be reimbursed by the state grant system. That's really good if you're a large county or a large municipality. Our annual budget is about $350,000,' Mayor of Alford George Gay said. Interest payments have made it nearly impossible for small towns to access grant funds. Alford, a town of about 550 residents, was one of the first to take advantage of a new opportunity. 'They fixed it across the state, where now it's a reimbursement system where once the workers complete each phase, they can turn in their work orders. We submit it to the state. The state applies the money to our account. We pay the contractor, and then the money's clear, and then we put it out. You do the paperwork. So instead of the money coming out of our general account or us having to borrow money, the money is given straight from the state, straight to the contractor. That is amazing, that has changed everything,' Gay said. Multi-agency effort assist in arrest of wanted fugitive in Walton County Now, residents are seeing progress on a long-awaited infrastructure revamp. Phase one of a septic-to-sewer project is nearly complete, with underground sewer lines and repaved roads. Florida Street is the first to receive the renovations, making it one of the first in the state to benefit from the completed grant. Phase two will connect the sewer lines to Marianna's sewer system. 'We partnered with the city of Marianna, which is about 9.1 miles away. So now with phase two, we run a line all the way to Marianna. So now all the sewage here will be forced into Marianna. Plus, between here and Marianna, it opens up some avenues for other developments, some other commercial properties that needed some septic sewer changeover,' Gay added. Phase two should be bid out in the next couple of months. The project will take at least another year and a half to complete. Residents will have the option to switch from septic to sewer at no cost to them. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.