
TS PGECET 2025 registration concludes today; here's how to apply
Today, May 19, is the last date to apply for the Telangana Post Graduate Engineering Common Entrance Test (TG PGECET - 2025) on the official website pgecet.tgche.ac.in. The last date to apply for the exam with the late fee is from May 22 to June 2, 2025.
The correction window will open from May 22 to 24, 2025. The exam will be conducted from June 16 to 19 in two shifts: 10.00 am to 12.00 noon and 2.00 pm to 4.00 pm. The admit card will be released on June 7, 2025.
Here's the official notice.
Application Fee
The applicants from the general category are required to pay a fee of Rs 1100, whereas Rs 600 is applicable to SC/ ST/ PwD category candidates.
Steps to apply for TS PGECET 2025

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
an hour ago
- Indian Express
All about the revised Green India Mission to increase forest cover, address climate change
The Centre on Tuesday (June 17) released a revised roadmap for the National Mission for Green India, also known as the Green India Mission (GIM). In addition to the core objectives of increasing and restoring forest and green cover, the mission will focus on restoration in the Aravalli ranges, Western Ghats, Himalayas and mangroves. The GIM is a key component of India's efforts to combat the effects of climate change. While the focus remains on improving forest cover, tackling land degradation and desertification will also feature prominently in the revised roadmap. GIM was rolled out in 2014 as one of the eight missions under India's National Action Plan on Climate Change (NAPCC). Its core aim is to combat climate change by increasing forest and tree cover, and the ecological restoration of degraded ecosystems and forests. It also aims to improve the livelihoods of communities dependent on forest produce. More specifically, its objective was to increase forest and tree cover on 5 million hectares and improve the quality of forest cover on another 5 million hectares. Between 2015-16 and 2020-21, the mission facilitated tree plantation and afforestation activities across 11.22 million hectares (mha) of land, through central and state schemes. Between 2019-20 and 2023-24, the Centre released Rs 624.71 crore to 18 states for interventions under GIM and Rs 575.55 crore has been utilised, according to an Environment Ministry response tabled in Lok Sabha this February. Activities under GIM are concentrated in states based on mapping of ecological vulnerability, potential for sequestration (the process by which plants and trees store carbon using photosynthesis), forest and land degradation, and restoration potential. What does the revised roadmap entail? The Green India Mission document was revised to account for on-ground climate impacts and feedback received from implementing partner states and scientific institutions, environment ministry officials told The Indian Express. A central focus of the revised mission plan will be on the restoration and saturation of vulnerable landscapes through regionally conducive best practices. This will see area and landscape-specific restoration activities in three important mountain ranges – the Aravallis, the Western Ghats, and the Indian Himalayas, along with the mangrove ecosystems. For instance, GIM interventions will be synced with the Centre's recently launched Aravalli Green Wall project, aimed at combating the degradation and desertification in one of the world's oldest mountain ranges, which acts as a natural barrier against the Thar desert. Studies by the Wildlife Institute of India have revealed in the past that 12 gaps that exist within the Aravalli range have widened due to the loss of forests and degradation. These gaps have contributed to frequent sandstorms and dust pollution in the districts of Delhi-National Capital Region and even in Punjab. Under the Green Wall project, restoration works have been planned initially across 8 lakh hectares spanning 29 districts and four states. This would be done in forest areas, grasslands, water systems and their catchment areas, and through the plantation of native, locally conducive species. The project is estimated to cost Rs 16,053 crore and aims to create a buffer zone of 5 km around the mountain range, covering 6.45 million hectares. In the Western Ghats, where degradation, deforestation and illegal mining are prevalent, the GIM will push to conserve through afforestation, groundwater recharge and eco-restoration of abandoned mining areas. How will the revised GIM combat land degradation and desertification? Around a third of India's geographical area – 97.85 million hectares – underwent land degradation during 2018-19, according to the Indian Space Research Organisation's Desertification and Land Degradation Atlas. India aims to create an additional carbon sink of 2.5 to 3 billion tonnes of carbon dioxide through additional forest and tree cover by 2030, according to its national commitments to tackle climate change submitted to the United Nations Framework Convention on Climate. The natural carbon sinks of forests, restored grasslands, wetlands, and mountain ecology will help offset greenhouse gas emissions and act as natural sponges and barriers in absorbing climate change impacts. India has also made an ambitious commitment to restore 26 million hectares of degraded land by 2030. The GIM and allied interventions, such as the Green Wall project, are all designed to help meet these goals. During the 2005-2021 period, an additional carbon sink of 2.29 billion tonnes of CO2 equivalent has been created, as per an environment ministry statement made in the Lok Sabha this year. To restore large swathes of forests and degraded lands, restoration of impaired open forests is key, cost-effective and high-impact for CO2 sequestration, the revised GIM roadmap says, based on Forest Survey of India's (FSI) estimates. According to the FSI, this approach alone has the potential to sequester 1.89 billion tonnes of CO2 over approximately 15 million hectares. It also estimates that by aligning ongoing schemes and intensifying afforestation efforts, GIM can help India expand its forest and tree cover up to 24.7 million hectares. This would be enough to achieve a carbon sink of 3.39 billion tonnes of CO2 equivalent by 2030, as per the FSI's projections. An award-winning journalist with 14 years of experience, Nikhil Ghanekar is an Assistant Editor with the National Bureau [Government] of The Indian Express in New Delhi. He primarily covers environmental policy matters which involve tracking key decisions and inner workings of the Ministry of Environment, Forest and Climate Change. He also covers the functioning of the National Green Tribunal and writes on the impact of environmental policies on wildlife conservation, forestry issues and climate change. Nikhil joined The Indian Express in 2024. Originally from Mumbai, he has worked in publications such as Tehelka, Hindustan Times, DNA Newspaper, News18 and Indiaspend. In the past 14 years, he has written on a range of subjects such as sports, current affairs, civic issues, city centric environment news, central government policies and politics. ... Read More


Indian Express
2 hours ago
- Indian Express
Rajasthan PTET Answer Keys 2025: Response sheets out at ptetvmoukota2025.com
Rajasthan PTET Answer Keys 2025:The Vardhman Mahaveer Open University (VMOU) has released the provisional answer key for the Rajasthan PTET 2025 exam, held on June 15. The answer key is available on for both BEd and integrated BA BEd/BSc BEd courses, for all four sets of question papers. Candidates can check their answers on the official website. This is the provisional answer key, and the students have a chance to raise objections till June 21. The window will remain open till 11:59 on June 21. Candidates have to log in to the PTET dashboard and click on the 'Question Objection' link. Step 1: Visit the official website– Step 2: Log in to your dashboard on the website. Step 3: On the dashboard, look for 'Question Objection' and response sheets. Step 4: Through Question Objection and response sheets, students will match the two and can raise objections. Step 5: If any objection is found, attach the document and pay the fees. Step 6: The final amount after all the objections will be given by the University in the last. Pay the fees and take the receipt for future reference. Step 7: Before final submission, thoroughly look over all the challenges and documents. A fee of Rs 100 will be charged by the University to look into the challenge. The challenge must be supported by a valid document, which should be from a reputable and trusted source. Objections raised without fees and without supporting documents will not be entertained by the University. The scores of Rajasthan PTET 2025 will be accepted for BEd programmes in state colleges and universities. The admission to these courses will be based on Pre-BEd and BSc Ed results. Through it, admission is only granted in the colleges of Rajasthan. For more information, students can visit the official website of the Vardhman Mahaveer Open University.


Scroll.in
3 hours ago
- Scroll.in
Rajasthan PTET 2025: Provisional answer key released, objection window opens today
Vardhman Mahaveer Open University (VMOU) has officially released the provisional answer key for the Rajasthan Pre-Teacher Education Test (PTET) 2025, held on June 15, 2025. The answer key is available for both the two-year and four-year integrated BA courses. Candidates who appeared for the entrance exam can now access the provisional answer key on the official website The objection window for the Rajasthan PTET 2025 answer key is open from June 19 to June 21, 2025, until 11.59 pm. Candidates must pay a non-refundable fee of Rs 100 per question to submit objections. Here's the official notification. Steps to view Rajasthan PTET 2025 answer key