
Long queues after ute crash on SH1 Ngauranga Gorge during evening rush
Footage captures lengthy queues for those heading home from Wellington CBD tonight after a crash on Ngauranga Gorge. Video / NZ Transport Agency Waka Kotahi
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

1News
19 minutes ago
- 1News
McLaughlin on Indy 500 crash: 'I still am a little bit perplexed'
Scott McLaughlin doesn't mince words about the moment that derailed his Indianapolis 500 dream. The Kiwi IndyCar driver crashed out before the race had even started, spinning on the warm-up lap and slamming into the wall in a rare, rattling mistake. "I still am a little bit perplexed about what happened in that scenario and how it did," he told 1News. "Never sort of done that before in my career." It capped off a nightmare month that began with promise and ended with wrecked cars, lost opportunity, and questions he was still attempting to answer. ADVERTISEMENT "That whole month was pretty tough. It started really well and then obviously ended in a couple of bad ways with my crash before that, and then crashing another brand new car. "Yeah, look, it was definitely one of, if not the lowest point of my career, but there's something that I'll learn from. McLaughlin's response was immediate: get back behind the wheel. Kiwi IndyCar driver Scott McLaughlin. (Source: 1News) "The best thing for me, after a week after that, was getting back in the race car. And, you know, felt really good even if it wasn't the most ideal result either.' While Indy was the most public blow, it had been a turbulent season all round. His team, Penske, was hit with a cheating scandal for illegal use of engine software. He's also been at the centre of social media run-ins, including one with former IndyCar champ Tony Kanaan. Still, McLaughlin's belief hasn't wavered. ADVERTISEMENT "We've had the pace to win races we just haven't put it together. A little bit of luck, little bit of making mistakes, bits and pieces." He opened the year with a pole position in St. Petersburg, grabbed a podium at Barber, and now turns his focus to this weekend's Bommarito 500 in St. Louis a track where he won pole and finished second last year. "I truly believe we have a fast car. I feel really strong on ovals. Do I enjoy ovals more? And I have to say, I do now. It's such a refreshing change for me in my career. Every time I go on an oval, I feel really confident and definitely feel like that's my kettle of fish." Scott McLaughlin opened up about his horror run at the Indy 500. (Source: 1News) He would enter the race sitting eighth in the standings, with championship leader Alex Palou well ahead but not out of reach. "I've been in this sport long enough not just IndyCar but Supercars as well. Sometimes you can have a fast car and you just don't put it together. It's not your year. I don't believe it's not my year yet." "I certainly need to get on the train and start winning races or, you know, getting some consistency back." ADVERTISEMENT There's added pride behind the wheel, too. McLaughlin's long-time sponsor, Gallagher Insurance, has partnered with the All Blacks — a team he had supported since childhood. "It's full circle. They've sponsored me here in America and now they're an associate of the All Blacks. I'd love to try get some of the boys out to a race vice versa." After a month of setbacks, McLaughlin was focused on the one thing that matters now — turning pace into results. Watch the full interview on TVNZ+


Scoop
an hour ago
- Scoop
Urgent Repairs Underway On SH16 At Woodhill
Press Release – NZ Transport Agency The repairs are addressing a drop-out on the side of the highway and involve complex work due to the presence of high-pressure gas lines in the area. Before construction can begin, crews must carefully locate underground services to ensure Transport Agency Waka Kotahi (NZTA) advises drivers that urgent repair work has commenced today on State Highway 16, just north of Restall Road near Woodhill. The repairs are addressing a drop-out on the side of the highway and involve complex work due to the presence of high-pressure gas lines in the area. Before construction can begin, crews must carefully locate underground services to ensure safety. Stop/go traffic management and temporary speed limits are in place, with one lane closed to allow the work to proceed. The repair is expected to take approximately one week, but this may be subject to change depending on site conditions. While significant delays are not expected, delays may be longer during commuting times. NZTA asks drivers to be patient, allow extra time, comply with temporary speed limits and follow instructions from crews on site in order to ensure their own safety and the safety of contractors working on site to complete the work.


Scoop
an hour ago
- Scoop
Traffic Delays: Henderson
Press Release – New Zealand Police A young child was struck by a car around 3pm and sustained a broken leg and foot are advised to expect traffic delays around Newington Road in Henderson. A young child was struck by a car around 3pm and sustained a broken leg and foot injuries. A section of Newington Road between Great North Road and Keruru Road is closed. Traffic management is at the scene and traffic is being diverted. The injured child has been taken to hospital in a serious condition.