
Hadapsar railway station emerging as Pune's new satellite terminal
In a bid to decongest Pune railway station, the Pune railway division is actively developing Hadapsar railway station as a fully operational satellite terminal for long-distance trains. With train operations increasing steadily, Hadapsar is being positioned as a key alternative hub to ease the load on Pune Junction which currently sees among the highest train operation volumes in the region. Some train services have already started shifting to Hadapsar, with more expected to shift in the coming months as infrastructure upgrades near completion.
The transformation of Hadapsar railway station is part of the Indian Railways' 'Amrit Bharat Station Scheme' implemented by the Gati-Shakti unit of the Pune division. The redevelopment project costs an estimated ₹135 crore and includes the extension of Up and Down platforms to 600 metres to accommodate 24-coach trains, conversion of the existing Up goods line into a common Up and Down passenger coach line, and the addition of a new goods line on the Up side. Other significant developments include the construction of a new station building, improvements to the circulating area, creation of parking facilities, and installation of water supply tank systems.
Many works such as the extension of platforms 1, 2 and 3 to full 24-coach capacity and implementation of passenger amenities worth ₹11.69 crore have already been completed. The passenger amenities include modern waiting halls, enhanced seating, digital display systems and clean drinking water facilities. 'Hadapsar station is being developed to provide an airport-like experience, with features such as lifts, escalators, a 12-metre-wide foot overbridge, roof plaza, waiting rooms, and retiring rooms,' said a senior railway official on condition of anonymity.
To facilitate the widening of access roads to the station, old railway quarters and the Railway Police Force (RPF) chowky have been removed. However, despite the ongoing development and enhanced facilities, passengers continue to face challenges related to connectivity and public transport. Unlike the centrally located Pune Junction, Hadapsar station lacks robust last-mile connectivity.
Sneha Kulkarni, a daily commuter from Magarpatta, said, 'While it is definitely a good move to start long-distance trains from Hadapsar, the biggest problem we face is poor connectivity. There are hardly any Pune Mahanagar Parivahan Mahamandal Limited (PMPML) buses or shared transport options directly to the station, and auto-rickshaw drivers often refuse short rides or charge extra. The approach road also gets congested during peak hours. Unless public transport and access improve, it will remain inconvenient for many passengers, especially senior citizens and those with luggage.'
Authorities acknowledge these challenges and are working in coordination with local bodies to improve public transport links to Hadapsar. Once fully operational, the station is expected to significantly reduce the burden on Pune Junction while offering more convenient options for residents of eastern Pune, including areas like Magarpatta, Amanora and Hadapsar itself. The station's transformation is expected to be complete by early 2026, representing a major leap forward in Pune's rail infrastructure and a critical component of the city's broader urban transport strategy.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


India Gazette
13 hours ago
- India Gazette
India's first Vande Bharat maintenance depot being built in Rajasthan
Jodhpur (Rajasthan) [India], June 3 (ANI): A maintenance depot for Vande Bharat trains is being constructed at Bhagat Ki Kothi in the Jodhpur Railway Division and is the first of its kind in the country, said a senior railway officer on Tuesday. The official further added that four such depots have been planned nationwide, but this is the first one which is under construction. Speaking about the project, Jodhpur Divisional Railway Manager Anurag Tripathi said, 'The Vande Bharat maintenance depot being built at Bhagat Ki Kothi in Jodhpur Division is the first of its kind in the country. It will handle maintenance for Vande Bharat trains from across India. Spread over 600 meters, it will have three pit lines to service three trains at once. Four more such depots are planned nationwide, but this is the first under construction...' Tripathi informed that the construction of the maintenance depot is expected to be completed by the end of 2025. He added that a proposal has been submitted to build a workshop and training centre near the depot. The official said, 'Recruitment will happen through the Railway Recruitment Board, followed by training and deployment. We've also proposed a new Rs 200 crore project to build a workshop and training centre near the depot. Once approved, tenders will be floated and work will begin... The maintenance depot is expected to be ready by the end of this year... The workshop and training centre will take longer but will move swiftly once started...' The Vande Bharat Express represents the future of Indian Railways, embodying the country's commitment to innovation, self-reliance, and sustainable development. The first Vande Bharat Express train was flagged off on February 15, 2019, on the New Delhi-Kanpur-Allahabad-Varanasi route, running at a speed of 160 kilometres per hour. This train has been introduced to upgrade maintenance technologies and methodologies and achieve improvement in the productivity and performance of all Railway assets and manpower. (ANI)


News18
14 hours ago
- News18
This Region Just Got 6 Vande Bharat Trains: And It's Changing How India Travels
Last Updated: Six high-speed trains, one game-changing shift, this region is now at the heart of India's rail revolution. Odisha has joined the growing list of Indian states expanding their semi-high-speed rail infrastructure, with six Vande Bharat Express trains now serving key routes across and beyond the state. These state-of-the-art trains, operated and maintained by the Western Railway zone, are set to transform the travel experience in the region with faster journeys, enhanced comfort, and improved efficiency. Among the key services is the Puri–Rourkela Vande Bharat Express, which covers a distance of 504 kilometres, linking the coastal pilgrim city with Odisha's industrial hub. The Bhubaneswar–Visakhapatnam train connects the state capital to Andhra Pradesh's scenic coast, further boosting interstate connectivity. Other vital routes include Brahmapur–Tatanagar, Rourkela–Howrah, Raipur–Visakhapatnam, and Berhampur–Tatanagar, effectively knitting together important urban centres across Odisha, West Bengal, Jharkhand, Chhattisgarh, and Andhra Pradesh. The addition of these trains marks a significant milestone in Odisha's transport evolution. With reduced travel time and modern amenities, cities like Bhubaneswar, Puri, Rourkela, and Berhampur are now more accessible than ever before. This surge in high-speed rail expansion isn't limited to Odisha. Across the country, Indian Railways is fast-tracking the rollout of Vande Bharat Express trains. Recently, a new service was launched between Sabarmati and Veraval in Gujarat, while September 2024 saw Prime Minister Narendra Modi virtually flag off six new routes, including Tatanagar–Patna, Brahmapur–Tatanagar, Rourkela–Howrah, Deoghar–Varanasi, Bhagalpur–Howrah, and Gaya–Howrah. Looking ahead, the Ministry of Railways is exploring additional corridors for these premium trains. One proposed service will link Vijayawada to Bengaluru via Tirupati, covering approximately 713 km in just nine hours. The latest Vande Bharat 2.0 trains come equipped with upgraded features such as faster acceleration, onboard WiFi, the Kavach safety system, and an anti-virus air filtration mechanism—demonstrating a leap in passenger safety and technological innovation. According to the ministry, 'Vande Bharat Express services represent a transformative shift in Indian travel, combining speed, safety, and service excellence. They reflect the strength of the 'Make in India' initiative and set new global benchmarks in railway innovation." With every new route, Indian Railways continues to redefine domestic travel—bringing cities closer, reducing carbon footprints, and paving the way for a faster, more connected India. First Published: June 03, 2025, 10:56 IST


Scroll.in
14 hours ago
- Scroll.in
RRB RPF SI DV schedule 2024 out at rrbcdg.gov.in; check details here
The Railway Recruitment Board (RRB) has released the Physical Efficiency Test (PET), Physical Measurement Test (PMT), and Document Verification (DV) schedule for the post of Sub-Inspector (Executive) in RPF/RPSF (CEN RPF 01/2024). Applicants can download e-call letters two weeks before the commencement of the DV from the official website The PET/PMT/DV will be conducted from June 22 to July 2 at Jagjivan Ram RPF Academy, Lucknow, UP. The reporting time is 4.00 pm. The recruitment drive aims to fill 452 posts of RPF Sub Inspector. 'Document Verification (DV) will be conducted on the same day of the PET/PMT for the candidates who will qualify in PET/PMT. All candidates must bring their all relevant original documents along with two sets of self-attested photocopies for submission,' reads the notification.