logo
Bengaluru stampede: Cubbon Park in shambles, walkers' association files complaint

Bengaluru stampede: Cubbon Park in shambles, walkers' association files complaint

Written by Mehak Singh,
The Bengaluru stampede that recently claimed 11 lives has also left one of the city's largest open spaces, Cubbon Park, grappling with significant damage.
A quiet walk through Cubbon Park revealed subtle but telling signs of the chaos. Bent and broken fences, snapped branches, and tree trunks marked with caution tape silently narrated the story of the Royal Challengers Bengaluru victory celebrations gone wrong, which resulted in the stampede near the M Chinnaswamy Stadium.
While Bengaluru has largely returned to its usual pace, the scars left behind in its green lungs remain visible. The Cubbon Park Walkers Association, a group that has long advocated for the protection of the park, has filed a formal complaint demanding accountability.
According to the complaint, the celebration was poorly managed, resulting in a large crowd spilling over into the adjoining Cubbon Park. The Association has alleged that the gathering resulted in damage to park fences, the uprooting of ornamental plants, broken branches on trees and even defecation in the area.
Advocate Umesh S, counsel for and also the president of the Association, said in the complaint, 'There has been a complete lack of preventive measures, and till date, no official damage assessment has been made. This is a serious failure on the part of the authorities.'
'We get good oxygen in Cubbon Park and Lalbagh only. We can't go anywhere in Bengaluru for that. At least, we can save the park for future generations,' he added.
Umesh also raised a larger urban planning issue, calling the location of the Chinnaswamy Stadium 'outdated'. 'The stadium deal was signed in 1970, but Bengaluru has changed. The current setup no longer suits the traffic and civic demands of today,' he said.
Meanwhile, in the aftermath of the stampede, one noticeable shift is the increased presence of police vans and personnel in and around Cubbon Park.
Speaking to The Indian Express, Kusuma G, Deputy Director, Cubbon Park, Horticulture department, said a lot of ornamental plants which were planted on Dr Ambedkar Veedi (between Karnataka High Court and Vidhana Soudha) and railings have been destroyed.
'The department is accessing the damages caused and an estimation will be made before communicating it to the government,' she added.
(Mehak Singh is an intern with The Indian Express)

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Guru Raghavendra Sahakara Bank scam: 5 years on, victims demand deposit insurance hike from Rs 5-lakh limit
Guru Raghavendra Sahakara Bank scam: 5 years on, victims demand deposit insurance hike from Rs 5-lakh limit

Indian Express

timean hour ago

  • Indian Express

Guru Raghavendra Sahakara Bank scam: 5 years on, victims demand deposit insurance hike from Rs 5-lakh limit

According to the bank data accessed by The Indian Express, 31,376 individuals had invested up to Rs 5 lakh, totaling Rs 84.57 crore, and 5,853 individual accounts had more than Rs 5 lakh, totalling up to Rs 1,350 by Bhoomika Roy Banerjee and Mehak Singh Five-and-a-half years after the Reserve Bank of India imposed a moratorium on Sri Guru Raghavendra Sahakara Bank Niyamita (SGRSBN) in Basavanagudi, the affected depositors have intensified their demand for enhanced deposit insurance coverage. The victims, in a meeting held on Friday, have sought an increase from the current Rs 5-lakh limit imposed by the RBI under the Deposit Insurance and Credit Guarantee Corporation (DICGC). Harish V, joint secretary of the United Forum of Depositors — a group of SGRSBN depositors who are fighting to get back their money — stated that the government is doing little for their returns. In 2023, the Karnataka government ordered a Central Bureau of Investigation probe to look into the case where Rs 2,500 crore was allegedly misappropriated by the bank management. So far, the Enforcement Directorate (ED) has attached assets worth Rs 159 crore as part of its probe into the alleged scam. However, Harish said, 'A Right To Information (RTI) query revealed that CBI had never taken the case to investigate. Thousands of them (depositors) are still in trouble and are unable to lead their lives.' He pointed out that even after five years there has been no attempt to recover the money by the defaulters or even by those from the management that led to the collapse of the bank. The administrators appointed by the government have changed but nothing has yielded any results, he added. According to the bank data accessed by The Indian Express, 31,376 individuals had invested up to Rs 5 lakh, totaling Rs 84.57 crore, and 5,853 individual accounts had more than Rs 5 lakh, totalling up to Rs 1,350 crore. Out of the 45,000 depositors, most of them got the Rs 5 lakh insurance amount from Deposit Insurance and Credit Guarantee Corporation (DICGC). However, over 15,000 depositors who have deposited more than Rs 6 lakh are yet to get the complete relief amount. G K Gururaj, another joint secretary, said that the current DICGC insurance limit of ₹5 lakh provides inadequate protection for depositors who have lost their savings, running into lakhs and crores of rupees. 'A forensic report submitted to RBI has been passed to the administration for assessment. Preliminary estimates suggest losses of ₹1,944 crore, though depositors have expressed willingness to forgo nearly Rs 650 crore in accumulated interest if their principal amounts can be recovered,' he added. More than 60 of the depositors, mainly elderly citizens, have died after the bank fell into controversy, according to the forum. Among the depositors who attended the meeting was 76-year-old Usha Devi, a retired BBMP employee. Her husband died six months ago. Vasudev, an active member of the forum and a depositor, shared how his brother was recently denied hospital admission due to lack of funds. He also talks about the plight of elderly depositors whose basic medical necessities aren't met. He said, 'This is a humanitarian issue here; it's more than the money. Most of us are frustrated.' The RBI imposed withdrawal restrictions on SGRSBN in January 2020. (Bhoomika Roy Banerjee and Mehak Singh Interns with The Indian Express)

Investors accuse Bengaluru builder firm of cheating in Kakkanad project
Investors accuse Bengaluru builder firm of cheating in Kakkanad project

New Indian Express

timean hour ago

  • New Indian Express

Investors accuse Bengaluru builder firm of cheating in Kakkanad project

KOCHI: Around 50 people have approached the Kochi city police accusing Bengaluru-based real estate developer Hoysala Projects Ltd of defrauding them of over Rs 30 crore that they collectively invested in new apartment projects at Kusumagiri along Infopark Road in Kakkanad. Based on the complaint of Sathyanarayanan Gopinathan Nair from Aluva, one of the investors, the Infopark police have registered a case of cheating and criminal breach of trust under the IPC. As per the complaint, Hoysala Projects allegedly deceived investors, causing them financial distress, and without timely intervention, their lives would be ruined. Sathyanarayanan alleged the issue dates back to 2013-2014, when Hoysala Projects launched a development project featuring two 13-storey towers comprising a total of 128 flats. He said the builder promised modern amenities, including a shopping mall. At the time, construction of around 11 floors had been completed, attracting numerous investors, who paid 25% of the flat's cost as part of the initial payment schedule, but the builder failed to complete the project even after collecting the money, he alleged. 'After getting no response from the developer for nearly five years, we approached the Kerala Real Estate Regulatory Authority (K-RERA) in 2021. The authority directed the developer to complete the project and later appointed a commission to investigate the delay. However, upon learning about the investigation, the developer unilaterally cancelled the agreements and allotments, and issued cancellation notices to 50 investors,' Sathyanarayanan alleged.

HC receives stampede case documents, seeks English translation
HC receives stampede case documents, seeks English translation

Hans India

time2 hours ago

  • Hans India

HC receives stampede case documents, seeks English translation

Bengaluru: The Karnataka High Court received on Thursday all relevant documents relating to its petition on the M Chinnaswamy Stadium stampede incident that claimed 11 lives. When the matter came up for hearing, the documents in Kannada were submitted in a sealed envelope before a division bench comprising Acting Chief Justice V Kameshwar Rao and Justice C M Joshi. Advocate General Shashi Kiran Shetty assured the bench that an English translation would be provided in two days. This will also be submitted in a sealed envelope, the court said. It further directed that all official communications, both offline and online, from stakeholders concerned be kept in the custody of the Chief Secretary of Karnataka. The matter was posted for further hearing on June 17. The stampede that occurred during the celebrations for Royal Challengers Bengaluru's (RCB) historic 2025 IPL victory over Punjab Kings on June 3, had claimed 11 lives and injured over 50 people, prompting the HC to take cognizance on June 5. The court had issued a notice to the Karnataka government to investigate the cause and propose preventive measures. AG Shetty had requested for a sealed-envelope submission, stating that in the pending bail petition being heard concurrently, any statements made in the case were being used by the petitioner. The court permitted Shetty to file the reply in a sealed cover, emphasising safe custody by the Registrar General.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store