BioSyent Schedules Fourth Quarter and Full Year 2024 Earnings Release for March 13, 2025
MISSISSAUGA, Ontario, March 06, 2025 (GLOBE NEWSWIRE) -- BioSyent Inc. ('BioSyent', 'the Company', TSX Venture: RX) will be reporting its financial results for the three months and full year ended December 31, 2024 on Thursday, March 13, 2025 after market hours. A presentation on the Company's fourth quarter and full year 2024 results by René Goehrum, BioSyent President and CEO, will also be available on the Company's website on the date of release.
About BioSyent Inc.
Listed on the TSX Venture Exchange under the trading symbol 'RX', BioSyent is a profitable growth-oriented specialty pharmaceutical company focused on in-licensing or acquiring innovative pharmaceutical and other healthcare products that have been successfully developed, are safe and effective, and have a proven track record of improving the lives of patients. BioSyent supports the healthcare professionals that treat these patients by marketing its products through its community, specialty and international business units.
As of the date of this press release, the Company has 11,264,517 common shares outstanding.
For a direct market quote for the TSX Venture Exchange and other Company financial information please visit www.tmxmoney.com.
For further information please contact:
Mr. René C. GoehrumPresident and CEOBioSyent Inc.E-Mail: investors@biosyent.comPhone: 905-206-0013Web: www.biosyent.com
This press release may contain information or statements that are forward-looking. The contents herein represent our judgment, as at the release date, and are subject to risks and uncertainties that may cause actual results or outcomes to be materially different from the forward-looking information or statements. Potential risks may include, but are not limited to, those associated with clinical trials, product development, future revenue, operations, profitability and obtaining regulatory approvals.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.Sign in to access your portfolio
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Upturn
a day ago
- Business Upturn
Koryx Copper Announces Filing of its Annual Information Form
VANCOUVER, British Columbia, June 06, 2025 (GLOBE NEWSWIRE) — Koryx Copper Inc. ('Koryx' or the 'Company') (TSX-V: KRY) is pleased to confirm the filing of its Annual Information Form ('AIF') for the year ended August 31, 2024 on SEDAR+ under the Company's profile at An electronic copy of the AIF may be obtained on the Company's website at or under the Company's SEDAR+ profile. About Koryx Copper Inc. Koryx Copper Inc. is a Canadian copper development Company focused on advancing the 100% owned Haib Copper Project in Namibia whilst also building a portfolio of copper exploration licenses in Zambia. Haib is a large, advanced (PEA-stage) copper/molybdenum porphyry deposit in southern Namibia with a long history of exploration and project development by multiple operators. More than 80,000m of drilling has been conducted at Haib since the 1970's with significant exploration programs led by companies including Falconbridge (1964), Rio Tinto (1975) and Teck (2014). Extensive metallurgical testing and various technical studies have also been completed at Haib to date. Additional studies are underway aiming to demonstrate Haib as a future long-life, low-cost, low-risk open pit, sulphide flotation copper project with the potential for additional copper production from heap leaching. Haib has a current mineral resource of 414Mt @ 0.35% Cu for 1,459Mt of contained copper in the Indicated category and 345Mt @ 0.33% Cu for 1136Mt of contained copper in the Inferred category (0.25% Cu cut-off). Mineralization at Haib is typical of a porphyry copper deposit and it is one of only a few examples of a Paleoproterozoic porphyry copper deposit in the world and one of only two in southern Africa (both in Namibia). Due to its age, the deposit has been subjected to multiple metamorphic and deformation events but still retains many of the classic mineralization and alteration features typical of these deposits. The mineralization is dominantly chalcopyrite with minor bornite and chalcocite present and only minor secondary copper minerals at surface due to the arid environment. Further details of the Haib Copper Project are available in the corresponding technical report titled, 'NI 43-101 Technical Report – August 2024 Mineral Resource Estimate for the Haib Copper Project, Namibia' dated effective August 31, 2024 (the 'Technical Report'). The Technical Report and other information is available on the Company's website at and under the Company's profile on SEDAR+ at ON BEHALF OF THE BOARD OF DIRECTORS 'Heye Daun' President, CEO and Director Additional information is also available by contacting the Company: Julia Becker Corporate Communications [email protected] +1-604-785-0850 Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary Statement Regarding Forward-Looking Information This press release contains 'forward-looking information' within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, statements regarding the use of proceeds from the Company's recently completed financings and the future or prospects of the Company. Generally, forward-looking information can be identified by the use of forward-looking terminology such as 'plans', 'expects' or 'does not expect ', 'is expected ', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates' or 'does not anticipate', or 'believes', or variations of such words and phrases or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur' or 'be achieved'. Forward-looking statements are necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently subject to business, market, and economic risks, uncertainties, and contingencies that may cause actual results, performance, or achievements to be materially different from those expressed or implied by forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, other factors may cause results not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. Other factors which could materially affect such forward-looking information are described in the risk factors in the Company's most recent annual management discussion and analysis. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws. Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same.
Yahoo
a day ago
- Yahoo
Koryx Copper Announces Filing of its Annual Information Form
VANCOUVER, British Columbia, June 06, 2025 (GLOBE NEWSWIRE) -- Koryx Copper Inc. ('Koryx' or the "Company") (TSX-V: KRY) is pleased to confirm the filing of its Annual Information Form ("AIF") for the year ended August 31, 2024 on SEDAR+ under the Company's profile at An electronic copy of the AIF may be obtained on the Company's website at or under the Company's SEDAR+ profile. About Koryx Copper Inc. Koryx Copper Inc. is a Canadian copper development Company focused on advancing the 100% owned Haib Copper Project in Namibia whilst also building a portfolio of copper exploration licenses in Zambia. Haib is a large, advanced (PEA-stage) copper/molybdenum porphyry deposit in southern Namibia with a long history of exploration and project development by multiple operators. More than 80,000m of drilling has been conducted at Haib since the 1970's with significant exploration programs led by companies including Falconbridge (1964), Rio Tinto (1975) and Teck (2014). Extensive metallurgical testing and various technical studies have also been completed at Haib to date. Additional studies are underway aiming to demonstrate Haib as a future long-life, low-cost, low-risk open pit, sulphide flotation copper project with the potential for additional copper production from heap leaching. Haib has a current mineral resource of 414Mt @ 0.35% Cu for 1,459Mt of contained copper in the Indicated category and 345Mt @ 0.33% Cu for 1136Mt of contained copper in the Inferred category (0.25% Cu cut-off). Mineralization at Haib is typical of a porphyry copper deposit and it is one of only a few examples of a Paleoproterozoic porphyry copper deposit in the world and one of only two in southern Africa (both in Namibia). Due to its age, the deposit has been subjected to multiple metamorphic and deformation events but still retains many of the classic mineralization and alteration features typical of these deposits. The mineralization is dominantly chalcopyrite with minor bornite and chalcocite present and only minor secondary copper minerals at surface due to the arid environment. Further details of the Haib Copper Project are available in the corresponding technical report titled, "NI 43-101 Technical Report – August 2024 Mineral Resource Estimate for the Haib Copper Project, Namibia" dated effective August 31, 2024 (the "Technical Report"). The Technical Report and other information is available on the Company's website at and under the Company's profile on SEDAR+ at ON BEHALF OF THE BOARD OF DIRECTORS"Heye Daun"President, CEO and Director Additional information is also available by contacting the Company: Julia Becker Corporate Communications jbecker@ Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary Statement Regarding Forward-Looking Information This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, statements regarding the use of proceeds from the Company's recently completed financings and the future or prospects of the Company. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect ", "is expected ", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently subject to business, market, and economic risks, uncertainties, and contingencies that may cause actual results, performance, or achievements to be materially different from those expressed or implied by forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, other factors may cause results not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. Other factors which could materially affect such forward-looking information are described in the risk factors in the Company's most recent annual management discussion and analysis. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities while retrieving data Sign in to access your portfolio Error while retrieving data Error while retrieving data Error while retrieving data Error while retrieving data
Yahoo
2 days ago
- Yahoo
Koryx Copper Announces Filing of its Annual Information Form
VANCOUVER, British Columbia, June 06, 2025 (GLOBE NEWSWIRE) -- Koryx Copper Inc. ('Koryx' or the "Company") (TSX-V: KRY) is pleased to confirm the filing of its Annual Information Form ("AIF") for the year ended August 31, 2024 on SEDAR+ under the Company's profile at An electronic copy of the AIF may be obtained on the Company's website at or under the Company's SEDAR+ profile. About Koryx Copper Inc. Koryx Copper Inc. is a Canadian copper development Company focused on advancing the 100% owned Haib Copper Project in Namibia whilst also building a portfolio of copper exploration licenses in Zambia. Haib is a large, advanced (PEA-stage) copper/molybdenum porphyry deposit in southern Namibia with a long history of exploration and project development by multiple operators. More than 80,000m of drilling has been conducted at Haib since the 1970's with significant exploration programs led by companies including Falconbridge (1964), Rio Tinto (1975) and Teck (2014). Extensive metallurgical testing and various technical studies have also been completed at Haib to date. Additional studies are underway aiming to demonstrate Haib as a future long-life, low-cost, low-risk open pit, sulphide flotation copper project with the potential for additional copper production from heap leaching. Haib has a current mineral resource of 414Mt @ 0.35% Cu for 1,459Mt of contained copper in the Indicated category and 345Mt @ 0.33% Cu for 1136Mt of contained copper in the Inferred category (0.25% Cu cut-off). Mineralization at Haib is typical of a porphyry copper deposit and it is one of only a few examples of a Paleoproterozoic porphyry copper deposit in the world and one of only two in southern Africa (both in Namibia). Due to its age, the deposit has been subjected to multiple metamorphic and deformation events but still retains many of the classic mineralization and alteration features typical of these deposits. The mineralization is dominantly chalcopyrite with minor bornite and chalcocite present and only minor secondary copper minerals at surface due to the arid environment. Further details of the Haib Copper Project are available in the corresponding technical report titled, "NI 43-101 Technical Report – August 2024 Mineral Resource Estimate for the Haib Copper Project, Namibia" dated effective August 31, 2024 (the "Technical Report"). The Technical Report and other information is available on the Company's website at and under the Company's profile on SEDAR+ at ON BEHALF OF THE BOARD OF DIRECTORS"Heye Daun"President, CEO and Director Additional information is also available by contacting the Company: Julia Becker Corporate Communications jbecker@ Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary Statement Regarding Forward-Looking Information This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, statements regarding the use of proceeds from the Company's recently completed financings and the future or prospects of the Company. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect ", "is expected ", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently subject to business, market, and economic risks, uncertainties, and contingencies that may cause actual results, performance, or achievements to be materially different from those expressed or implied by forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, other factors may cause results not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. Other factors which could materially affect such forward-looking information are described in the risk factors in the Company's most recent annual management discussion and analysis. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data