logo
Nearly 1/4th of MCD drains in Delhi are yet to be desilted: Report

Nearly 1/4th of MCD drains in Delhi are yet to be desilted: Report

Indian Express8 hours ago

The Southwest monsoon has reached the Capital, and 77.5% of drains have been desilted across the city, as per the Municipal Corporation of Delhi's status report. A total of 2,29,018 metric tonnes of silt has been removed from the drains that come under the civic body's jurisdiction in 12 zones till June 23, the report underlined.
The report was issued by the civic body after questions were raised on monsoon preparedness at the first meeting of the Standing Committee on June 27.
At 59%, Karol Bagh was at the bottom of the list of 12 zones achieving the total desilting target. In some areas, such as Central Zone and Keshav Puram, the total silt removed exceeded the estimated tonnes of silt.
Desilting is an ongoing process, said officials — it started on January 1 and is being carried out in a phased manner. The target is set for the entire year, as per the report. The civic body said a Rs 36 crore budget has been allocated for 2025-2026 for drain cleaning.
The report has been segregated into two parts: drains with a depth or width of less than 4 feet, and more than 4 feet. As per an overview of the data, the civic body has desilted small drains in large numbers, but deeper and larger drains remain to be cleared.
While Najafgarh, the longest running drain in Delhi, achieved 110% of the desilting target, only 67% of the drains of height or width of 4 feet and above have been desilted in the area.
For North Shahdara Zone, the MCD cleared 100 of % silt from small drains (less than 4-ft deep), but only 60% of the targeted silt had been removed from bigger drains.
Likewise, for the South Zone, only 63% of silt from the 45 km stretch of deeper drains has been removed before the monsoon.
For the West Zone, while 86% of the small drains are cleared, only 67% of the targeted silt from deeper drains has been cleared, as per the report.
Six super sucker machines, 10 jetting machines, 32 suction–cum-jetting machines, and 25 skid-steer loaders are being used in the process. The report mentions that the removed silt will be disposed of at the sanitary landfill (SLF) sites in Ghazipur, Bhalswa, and Okhla.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Cracks in Kabini dam a cause for concern
Cracks in Kabini dam a cause for concern

New Indian Express

time27 minutes ago

  • New Indian Express

Cracks in Kabini dam a cause for concern

More than seven dams in Mysuru and Chamarajanagar districts, mainly Kabini, Taraka, Nugu, Suvarnavathi, Chikkahole, Gundal and Uduthorehal dam, which are more than 40 years old, need immediate attention for better maintenance and structural safety. Experts rule out an immediate threat to the structure of Kabini dam. However, neglect or delay in filling up the cavity and cracks would weaken the reservoir structure, they caution. Irrigation department officials noticed leakage and deployed robots and underwater cameras to record the status of the structure, to report to the expert committee and Cauvery Neeravari Nigam Limited authorities, with details that the cracks and cavities are more than 50-cm deep. The engineers could not take up work immediately because of high turbidity in the water and poor visibility to fill up the cracks. The Dam Safety review team and Dam Safety panel, comprising former chairmen of the Central Water Commission, inspected the dams to study their status. Due to incessant rain, Chikkahole dam brimmed over but there was no relief for farmers as poor maintenance of sluice gates resulted in wastage of water. The inability to operate or fully close the sluice gate has wasted about 6 cusecs of water every day. The broken sluice gate of Taraka dam was replaced with a 25-tonne gate 19 years ago. If the government wants to utilise the allocated 284tmcft of water, it should replace all crest gates and strengthen the structure based on the expert committee report. The Cauvery Neeravari Nigam Limited has approved Rs 32.35 crore for filling up cavities and cracks in the Kabini dam. It has presented a proposal of Rs 88 crore to the Centre to strengthen the dam structures.

UPSC recruitment 2025: Apply for 241 AO, JSO, other posts till July 17, details here
UPSC recruitment 2025: Apply for 241 AO, JSO, other posts till July 17, details here

Scroll.in

timean hour ago

  • Scroll.in

UPSC recruitment 2025: Apply for 241 AO, JSO, other posts till July 17, details here

The Union Public Service Commission (UPSC) has started accepting online applications from eligible candidates for the recruitment of Administrative Officer, Senior Scientific Assistant, Junior Scientific Officer, and other posts. Eligible candidates can apply for the posts at till July 17, 2025. The recruitment drive aims to fill 241 vacancies. Applicants can check the eligibility criteria, age limit, pay scale, and other details available in the notification below: Here's the official notification. Application Fee Candidates (except Female/SC/ST/Persons with Benchmark Disability Candidates who are exempted from payment of fee) are required to pay a fee of Rs 25. Steps to apply for UPSC posts 2025 Visit the official website On the homepage, click on the 'Apply Online' tab Click on the ORA registration link Register and apply for the posts Fill the form, pay the fee, and submit the form Take a printout for future reference Direct link to apply.

Rajgopal Reddy's hands-on approach to civic service
Rajgopal Reddy's hands-on approach to civic service

Hans India

time2 hours ago

  • Hans India

Rajgopal Reddy's hands-on approach to civic service

Munugodu (Nalgonda): Local Rajgopal Reddy's hands-on approach to civic serviceMLA Komatireddy Rajgopal Reddy toured streets in Anthampet village of the newly formed Gattuppal Mandal to understand the problems of villagers first-hand. He inaugurated sanctioned Indiramma houses by performing coconut-breaking rituals. He promised to secure homes in the second phase for eligible poor families who were left out in the first list. Visiting the hut of Ramulu, a daily-wage earner, he assured to build him a house, covering the remaining cost beyond the Rs 5 lakh government grant. Observing power lines passing over homes, he instructed the electricity AE to remove loose and unsafe 11KV lines immediately. Rajgopal Reddy also inspected roadworks between Anthampet to Devulathanda, Rajyathanda, and Namapuram. He said that welfare schemes should reach the deserving, beyond politics. Listening to Somalingamma's grief about her abandoned state, he phoned her son and urged him to take care of his mother. Local leaders and officials accompanied him during the visit.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store