logo
Church closure brings end to 300 years of Roman Catholic worship in Bridgetown

Church closure brings end to 300 years of Roman Catholic worship in Bridgetown

CBC8 hours ago

St. Alphonsus Catholic Church in Bridgetown, N.S., will hold its final mass on Sunday, marking the end of more than three centuries of Roman Catholic worship in the community.
The church building, part of a continuous Catholic presence since 1690, is closing its doors due to declining attendance.
"We're really trying to be thankful for everything that we had," Lynn Main, a parishioner at the church since 1992, told CBC Radio's Information Morning Nova Scotia.
Main's family has deep ties to the church. Her daughter was married there, her granddaughters baptized, and she even renewed her wedding vows there on her 50th anniversary.
According to the parish website, the roots of St. Alphonsus trace back to the Acadian Mission of St. Laurent, established around 1690 as a mass house serving Acadian and Mi'kmaw families from Belleisle to Paradise in Annapolis County.
The original chapel was demolished by English forces in 1736 and, after the Expulsion of the Acadians, the Catholic presence in the area dwindled to mostly Mi'kmaw and Irish families. For years, mass was celebrated in private homes, including that of Isaac and Euphenia Bonnett.
The current church building, constructed in 1874, owes its existence to determined parishioners, notably Euphenia Bonnett, who spearheaded its construction but died before it was opened.
In 1986, with a rise in church community activity, parishioners decided to expand the church, and the building was moved to accommodate the expansion.
Volunteers from the congregation built a basement, a kitchen and space for a Sunday school.
When the building closes, the faith community will continue, Main said.
"We will still be members of the parish of Corpus Christi," she said. "It's not like we're being cast afloat with nowhere to go."
The fate of St. Alphonsus mirrors a trend across the province as the latest in a string of Catholic churches forced to close because of shrinking attendance.
As a longtime choir member, Main said she will miss the music most, noting that singing is a form of prayer.
Sunday's final mass at 4 p.m. AT will be a celebration of what the church meant to the community over the years, she said.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

City rolls out 'complete overhaul' of transit system
City rolls out 'complete overhaul' of transit system

CBC

time2 hours ago

  • CBC

City rolls out 'complete overhaul' of transit system

Social Sharing The city rolled out its brand new transit network on Sunday, a change the mayor calls the largest in more than a century for Winnipeg Transit. "We're not just tweaking transit, it's a complete overhaul," Winnipeg Mayor Scott Gillingham said. Gillingham joined Coun. Janice Lukes and others Sunday morning to ride the first in-service bus of Winnipeg's brand new network, which left Portage Avenue and Spence Street at 5:32 a.m. The launch of the new network means Winnipeg Transit will undergo what the city is calling the most "significant single-day transformation" in the system's 142 year history. It replaces the city's existing "hub-and-spoke" system, with a more grid-like "spine-and-feeder" model, featuring high-frequency routes along major roads, connected to smaller routes running through residential areas, according to the city. "So it's all going to take time to adjust, but we need a modern transit service for a modern growing city," Gillingham said. According to the city, the network was in need of an overhaul because the previous system was based mainly on people going to and coming from downtown. "The city population has reached 850,000 now, so we continue to grow, we need a good, reliable, frequent transit service to make things better, and that's what this is all about." The mayor admitted there could be some hiccups with the new system because of how different everything will now be, but he urged patience as transit riders and drivers adjust. "Be patient with our operators too," he said. "For our transit drivers, this is all new for them too. "To their credit, they've been getting ready for this day." The mayor says his own bus route will also change, as he previously took a single bus to get to City Hall, but will now transfer to a second bus to get to work, and said others who previously rode a direct bus to work downtown may now have to transfer on to a second bus. "We all need to adjust a little bit," he said. According to Lukes, the city isn't going into the new system without preparation, as it's been running as a pilot project in the southwest corner of the city since 2020. "So we've been piloting this change for about four years, and now we're ready to transform the city," Lukes said. "Better frequency means better service, and that's what we want on our buses." She added officials have deemed the pilot project in southwest Winnipeg a "success" because ridership in the area is up. Lukes says the city will evaluate the success of the new system in many ways, one of which is measuring a potential increase in transit ridership city-wide. "That's going to be primarily one of the milestone marking points," she said. "And because of what people have experienced in southwest Winnipeg, I think people are going to embrace it and love it." The city is asking anyone with questions or complaints about the new system to contact 311 or their representative on city council. Winnipeggers can plan their trips with the new network on Navigo or by downloading the Transit App, the city said.

Winnipeg unveils new transit network in historic 142-year overhaul
Winnipeg unveils new transit network in historic 142-year overhaul

CTV News

time2 hours ago

  • CTV News

Winnipeg unveils new transit network in historic 142-year overhaul

City staffers are holding a special bus stop sign, in celebration of the Primary Transit Network's launch on June 29, 2025. (Harrison Shin/CTV News Winnipeg) Changes to the transit system are now in effect. The City of Winnipeg has officially launched the Primary Transit Network — a major change to the transit system in its 142-year history, according to a media release. The new network, rolled out early Sunday morning, introduces a simplified 'spine-and-feeder' system designed to improve frequency, connectivity and service efficiency. The first in-service bus under the revamped network departed from Portage Avenue and Spence Street at 5:32 a.m. 'This will mean better frequency and better service, and that's what we want on our buses – better service,' said Janice Lukes, chairperson of the Standing Policy Committee on Public Works. The Primary Transit Network is built on a backbone of high-frequency routes — the 'spine' — supported by community feeder routes that connect neighbourhoods to main lines. The city also announced an expansion of its On-Request transit zones, which have grown from four to 12 across Winnipeg. To help passengers adjust, Winnipeg Transit is deploying street teams to assist riders in high-traffic areas over the next several days. Mayor Scott Gillingham's message to the riders is to be patient and provide feedback. 'This is all new to them (the transit operators) also. So if you have questions or want to provide feedback, please do so,' Gillingham told CTV News. Riders can plan their trips using the updated Navigo trip planner or the Transit app. Full route maps and service information are available at city's website.

Multiple fire crews battle roof and solar panel blaze in West Lorne, Ont.
Multiple fire crews battle roof and solar panel blaze in West Lorne, Ont.

CTV News

time4 hours ago

  • CTV News

Multiple fire crews battle roof and solar panel blaze in West Lorne, Ont.

The black smoke from a storage facility fire in West Lorne, Ont. could be seen for kilometres. West Elgin Fire Department responded to a blaze at 215 Gilbert St. Saturday after multiple 911 calls. 'There was smoke and flames showing from the rooftop at the building behind us,' said Jeff MacArthur, chief of the West Elgin Fire Department. 'We also requested Dutton/Dunwich for mutual aid and also Central Elgin Fire.' The building is a storage facility called SimTech Supply Chain Management. WEST LORNE FIRE Black smoke filled the air in West Elgin after the roof and solar panels at a storage facility caught fire on Saturday, June 28, 2025. (Source: Ryan Minogue) Fire crews set up hoses around the perimeter of the building spraying water up onto the roof. Central Elgin Fire had its aerial ladder truck and was putting water on from above. 'We were quickly able to knock down the flames with water suppression,' said MacArthur. 'We secured water supply. We have hydrants right on scene here, so thankfully, the fire was brought under control on the rooftop quite quickly.' WEST LORNE FIRE West Elgin Fire Department set up hoses around the perimeter of a building at 215 Gilbert St. in West Lorne, Ont. and sprayed to battle a roof and solar panel fire on Saturday, June 28, 2025. (Brent Lale/CTV News London) Fire crews worked with the property owner to determine what contents were inside the facility. They also had Enbridge and Hydro One crews on scene to isolate the electrical power and the rest of the utilities. There were no injuries. Fire later determined the fire involved the roof structure and solar panels on the roof. None of the building's contents were involved in the fire and crews will be back on scene Sunday to continue the investigation.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store