
Hastings: Plans For $2.5m Inner-City Development For Vibrant Living
Article – Linda Hall – Local Democracy Reporter
Hastings Mayor Sandra Hazlehurst says the project brings the communitys vision for a more vibrant, connected city centre one step closer.
More inner-city living is on the cards for Hastings with a Queen St West site earmarked for a $2.5 million development.
The Hastings District Council-owned site has been partially sold to Mike Walker Management (MWM) and plans include city housing, commercial spaces and a public car park.
Hastings Mayor Sandra Hazlehurst says the project brings the community's vision for a more vibrant, connected city centre one step closer.
'It's also a positive step towards delivering on our commitment to enable more inner city living, supported by a variation to the proposed district plan in 2019 to allow residential activity in the upper floors of city centre buildings,' Hazlehurst said.
MWM director Mike Walker said the development of the former Farmers' Co-operative garage building was a unique opportunity to blend heritage and modern living in a way that brings long-term value to the community.
'Hastings has a strong identity and rich history, and we're proud to be part of a project that reflects that,' he said.
'Our approach is to retain and celebrate what's already here while delivering spaces where people want to live, work and connect. We believe this redevelopment will be a catalyst for even more investment and vibrancy in the city centre.'
Plans include strengthening and reusing the facade of the Farmers' Co-operative heritage building, terraced townhouses, new commercial tenancies and office space, and a public park and laneway connecting Queen St West to Heretaunga St West.
The project follows a four-year search by the council for the right development partner.
Demolition of the existing buildings is scheduled to begin in August 2025.
Stage one will focus on delivering a new public green space, and pedestrian laneways, and strengthening the heritage facade.
The next stage will see the development of commercial accommodation and then townhouses potentially beginning to be built as early as 2026.
An application is under way to amend the existing resource consent, originally granted in May 2023 for a three-storey, mixed-use development comprising 20 apartments. The revised consent will allow for the development of terraced townhouses.
The council will retain ownership of the public park and laneways while divesting the land for commercial and residential use at market value.
It says the net cost of the project remains within the budget allocated in the Long-Term Plan 2024-34.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Scoop
31-05-2025
- Scoop
Mayor Who Led Cyclone Gabrielle Recovery Steps Down After 9 Years
A force of nature, a 'Queen of infrastructure' and the woman you knew would be at every weekend event - Sandra Hazlehurst will leave quite the legacy. Hastings' charismatic and indomitable mayor has announced she won't seek re-election as Hastings mayor after nine years at the helm. Hazlehurst's advice to whoever she hands the chains over to is to do what she at times struggled to do - ask other people to help out a bit. She said while she would miss being out in the community opening every skatepark, attending every concert 'in hindsight I should have shared the load with councillors'. The 66-year-old said she felt honoured and privileged to have served the Hastings community as a councillor and mayor over the past 15 years, and she had mixed emotions about her decision. She said the timing of her mayoralty couldn't have been better. 'My two daughters are living overseas so they haven't had to deal with any negative comments, but most people are respectful even if they don't agree with some of our decisions. 'My husband Mark has been incredibly supportive and he's excited he might see more of me," she laughed. Known for her passion for fashion and her huge smile Hazlehurst says community has always been part of her life. 'My parents owned Warren's Bakery so we were always part of any community festivities.' She said the past three years had been the hardest. 'Cyclone Gabrielle has had a devastating impact on the lives, livelihoods, and property of our people. I am deeply grateful to everyone who has played a part in our ongoing recovery – rebuilding lives, reconnecting communities, and restoring vital infrastructure. 'But everyone has been engaged. We've faced huge challenges. I'm thrilled at how much we have got done. We have rebuilt infrastructure, and invested in housing developments, the CBD is looking vibrant which has attracted more businesses. 'I'm particularly proud of how far Flaxmere has come. That has all come from listening to what people in the community want and that was homes. 'We are public servants so we do listen to the community. That's exactly what we did with the Opera House in 2014. 'We had 3000 submissions for and against rebuilding it. 'But what finally made our minds up was a group of schoolboys including Emmanuel Fonoti-Fuimaono singing in the chamber and then asking us 'where will we sing if you don't rebuild'?' On Sunday, June 8, Emmanuel, who is from Flaxmere, will be singing at the Toitoi Hawke's Bay Arts and Events Centre in Hastings before he heads to the international opera stage. He has been accepted into the Merola Opera Program in San Francisco and the Jette Parker Artists Programme at London's Royal Opera House. 'That is what makes local governance worthwhile.' She says the council needs stay on course in the next few years. 'While my time as Hastings' mayor will end in October, I am excited to continue to serve our community in other ways. I am a loud and proud Heretaunga Hastings champion and will continue to passionately support all festivals and events. 'In the meantime, there is much to do as we consider the future of delivering drinking water, wastewater and stormwater through the Local Waters Done Well Reform and continue rebuilding our infrastructure after Cyclone Gabrielle. 'To the people of Heretaunga Hastings, thank you for your support, trust and aroha over the years, for which I am very grateful. It has been a privilege to serve you.'


Scoop
30-05-2025
- Scoop
Building A Resilient Future For Kāpiti: Annual Plan Adopted And Rates Set For 2025/26 Year
Press Release – Kapiti Coast District Council Work included in the Annual Plan includes important capital projects to upgrade the Paraparaumu wastewater treatment plant and the Waikanae water treatment plant, and building Te Ara Whet, the new library and community hub in Waikanae. Kāpiti Coast District Council has adopted its annual plan and set rates for the coming year, with a focus on sticking to the long-term objective of building a resilient future for the Kāpiti Coast. The Annual Plan 2025/26 is an update to year two of the Long-term Plan 2024/34 (LTP), which outlines the projects and services to be delivered over 10 years. It was adopted by Council at its meeting on 29 May. Work included in the Annual Plan includes important capital projects to upgrade the Paraparaumu wastewater treatment plant and the Waikanae water treatment plant, and building Te Ara Whetū, the new library and community hub in Waikanae. Council is also progressing its financial strategy to reduce debt by a total of $153 million by 2034, building capacity to respond to natural disasters and maximise growth opportunities. To do the mahi (work) outlined in the plan and reduce Council's debt levels, rates revenue will rise by 6.9 percent after growth for the year – within the 7 percent limit set in the LTP. Kāpiti Coast District Mayor Janet Holborow says the Annual Plan sets Kāpiti up for future challenges. 'We've stuck to what we agreed with the community last year, with some minor amendments made to accommodate rising costs,' Mayor Holborow says. 'Everything we're doing is about making sure Kāpiti is well-placed for whatever the future brings, because based on our recent experience and the predictions we can draw from we know there will be unexpected challenges ahead. 'This is why we're continuing to invest in our core water infrastructure, which is among the best in New Zealand, and our other essential services. 'It's why we're reducing our debt, so that we can respond to potential natural disasters and growth opportunities strongly. 'We're also balancing this future focus with the current pressures we all face – no one wants to see high rates rises. 'We have worked hard to find significant operational savings, so we can keep rates as affordable as we can.' Mayor Holborow says the bulk of Council's rates-funded operational spending for the year ($114m) will be on core services like water management, roading and transport, and pools, parks and playgrounds. 'We'll be spending $34.1m of ratepayer money on our wastewater, storm water and drinking water services, $17m on our transport network, and $10.1m on our parks and open spaces. 'These and our other services all play important parts in making Kāpiti such a great place to live and do business in, and it's important we make sure we continue to invest in what we've got.' The final 2025/26 Annual Plan will be available to read at in the coming days. Fees and charges adopted At the same meeting Council also adopted the fees and charges used to cover some of the costs of facilities and services for the 2025/26 year. Most fees and charges increases have been held at the 3.2 percent inflation factor used by local government. There are some exceptions where fees and charges have risen. These include: Building Consent Fees: Fees for code compliance certificates and some LIMs will go up. Online consent application fees will also increase due to changes by our online system vendor. Domestic Food Business Levy: A new levy set by MPI will be introduced. The Council will charge a small fee to cover the cost of collecting this revenue for the Government. Hall Hire Fees: These will increase by 10% to cover higher costs. Learn to Swim Programme: Minor changes include more convenient payment options, flexibility for school participation, and a small regular charge for students to access the pool outside of lessons. Access and Transport: Corridor access request fees for project works will increase beyond inflation to cover higher costs. Wastewater Fees: Septage disposal and trade waste discharge fees will rise beyond inflation. A new fee for wastewater connection inspections will be introduced. Potable Water Fees: Adjustments will be made to fees for water meter special readings, filling point access cards, and water volume charges at Council filling points. Waikanae Pop-up Fees: New fees will be established to help cover the costs of the Waikanae Pop-up for start-up businesses in the short term. The full register of proposed fees and charges can be found at


Scoop
30-05-2025
- Scoop
Building A Resilient Future For Kāpiti: Annual Plan Adopted And Rates Set For 2025/26 Year
Kāpiti Coast District Council has adopted its annual plan and set rates for the coming year, with a focus on sticking to the long-term objective of building a resilient future for the Kāpiti Coast. The Annual Plan 2025/26 is an update to year two of the Long-term Plan 2024/34 (LTP), which outlines the projects and services to be delivered over 10 years. It was adopted by Council at its meeting on 29 May. Work included in the Annual Plan includes important capital projects to upgrade the Paraparaumu wastewater treatment plant and the Waikanae water treatment plant, and building Te Ara Whetū, the new library and community hub in Waikanae. Council is also progressing its financial strategy to reduce debt by a total of $153 million by 2034, building capacity to respond to natural disasters and maximise growth opportunities. To do the mahi (work) outlined in the plan and reduce Council's debt levels, rates revenue will rise by 6.9 percent after growth for the year – within the 7 percent limit set in the LTP. Kāpiti Coast District Mayor Janet Holborow says the Annual Plan sets Kāpiti up for future challenges. 'We've stuck to what we agreed with the community last year, with some minor amendments made to accommodate rising costs,' Mayor Holborow says. 'Everything we're doing is about making sure Kāpiti is well-placed for whatever the future brings, because based on our recent experience and the predictions we can draw from we know there will be unexpected challenges ahead. 'This is why we're continuing to invest in our core water infrastructure, which is among the best in New Zealand, and our other essential services. 'It's why we're reducing our debt, so that we can respond to potential natural disasters and growth opportunities strongly. 'We're also balancing this future focus with the current pressures we all face – no one wants to see high rates rises. 'We have worked hard to find significant operational savings, so we can keep rates as affordable as we can.' Mayor Holborow says the bulk of Council's rates-funded operational spending for the year ($114m) will be on core services like water management, roading and transport, and pools, parks and playgrounds. 'We'll be spending $34.1m of ratepayer money on our wastewater, storm water and drinking water services, $17m on our transport network, and $10.1m on our parks and open spaces. 'These and our other services all play important parts in making Kāpiti such a great place to live and do business in, and it's important we make sure we continue to invest in what we've got.' The final 2025/26 Annual Plan will be available to read at in the coming days. Fees and charges adopted At the same meeting Council also adopted the fees and charges used to cover some of the costs of facilities and services for the 2025/26 year. Most fees and charges increases have been held at the 3.2 percent inflation factor used by local government. There are some exceptions where fees and charges have risen. These include: Building Consent Fees: Fees for code compliance certificates and some LIMs will go up. Online consent application fees will also increase due to changes by our online system vendor. Domestic Food Business Levy: A new levy set by MPI will be introduced. The Council will charge a small fee to cover the cost of collecting this revenue for the Government. Hall Hire Fees: These will increase by 10% to cover higher costs. Learn to Swim Programme: Minor changes include more convenient payment options, flexibility for school participation, and a small regular charge for students to access the pool outside of lessons. Access and Transport: Corridor access request fees for project works will increase beyond inflation to cover higher costs. Wastewater Fees: Septage disposal and trade waste discharge fees will rise beyond inflation. A new fee for wastewater connection inspections will be introduced. Potable Water Fees: Adjustments will be made to fees for water meter special readings, filling point access cards, and water volume charges at Council filling points. Waikanae Pop-up Fees: New fees will be established to help cover the costs of the Waikanae Pop-up for start-up businesses in the short term. The full register of proposed fees and charges can be found at